Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON HẢI ĐƯỜNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 7 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 522,145,500 VND, of which the total winning bid value is: 519,283,500 VND.
- The savings rate is: 0.55%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON HẢI ĐƯỜNG as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 522,145,500 VND, in which the total winning value is: 519,283,500 VND.
- The savings rate is: 0.55%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 7 contractor selection plans, of which 6 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Provide nutritious milk powder .
- Winning bidder: CÔNG TY TNHH MTV KHOA KHÁNH PHƯƠNG
29/08/2025 21:29
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Provide food, raw materials .
- Winning bidder: Công ty Cổ phần Thực Phẩm Ngon-Sạch Bổ
29/08/2025 21:17
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Providing food, ingredients, and input fuel to make school meals for semi -boarding students in Hai Duong Kindergarten - school year 2025-2026 with 2 bidding package .
29/08/2025 21:09
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the results of the bidding package Repairing and building lakes and sand holes; Renovating the front + rear yard, tiles of the main hall, building a tree in front of the gate and pouring concrete to expand the floor of Hai Duong Kindergarten teacher of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG.
- Winning bidder: CHAU HANH PHAT CO.,LTD
22/05/2025 08:11
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Repairing and building lakes and sand holes; Renovating the front + rear yard, tiles of the main hall, building a tree in front of the gate and pouring concrete to expand the floor of Hai Duong Kindergarten teacher of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
21/05/2025 15:51
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the results of the bidding package Shopping for the canvas frame of Hai Duong Kindergarten of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG.
- Winning bidder: CÔNG TY TNHH KIẾN AN KHANG
19/04/2025 08:44
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Shopping for the canvas frame of Hai Duong Kindergarten of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
18/04/2025 11:05
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Science and Technology estimates the purchase of teaching and learning equipment for Hai Duong Kindergarten of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
26/12/2024 14:29
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG.
- Winning bidder: HA QUANG CONTRUCTION & TRADING JOINT STOCK COMPANY
17/10/2024 16:00
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Project: Repair of Hai Duong Kindergarten - Category: PVC paneling and ceiling of classroom + kitchen 2 of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
16/10/2024 14:34
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Repairing and building lakes and sand holes; Renovating the front + rear yard, tiles of the main hall, building a tree in front of the gate and pouring concrete to expand the floor of Hai Duong Kindergarten teacher .
- Winning bidder: CHAU HANH PHAT CO.,LTD
22/05/2025 08:11
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Repairing and building lakes and sand holes; Renovating the front + rear yard, tiles of the main hall, building a tree in front of the gate and pouring concrete to expand the floor of Hai Duong Kindergarten teacher with 1 bidding package .
21/05/2025 15:51
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Shopping for the canvas frame of Hai Duong Kindergarten .
- Winning bidder: CÔNG TY TNHH KIẾN AN KHANG
19/04/2025 08:44
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Shopping for the canvas frame of Hai Duong Kindergarten with 1 bidding package .
18/04/2025 11:05
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Science and Technology estimates the purchase of teaching and learning equipment for Hai Duong Kindergarten with 1 bidding package .
26/12/2024 14:29
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Civil Works .
- Winning bidder: HA QUANG CONTRUCTION & TRADING JOINT STOCK COMPANY
17/10/2024 16:00
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Project: Repair of Hai Duong Kindergarten - Category: PVC paneling and ceiling of classroom + kitchen 2 with 1 bidding package .
16/10/2024 14:34
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Civil Works .
- Winning bidder: HA QUANG CONTRUCTION & TRADING JOINT STOCK COMPANY
12/12/2023 14:47
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Project: Repairing Hai Duong Kindergarten; Category: Repair, waterproofing roofs, walls and basic lime paint roller 2 with 1 bidding package .
12/12/2023 14:43
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Semi-boarding supplies .
- Winning bidder: KHA KHANH COMPANY LIMITED
20/10/2023 16:01
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Provide nutritious milk powder .
- Winning bidder: CÔNG TY TNHH MTV KHOA KHÁNH PHƯƠNG
29/08/2025 21:29
TRƯỜNG MẦM NON HẢI ĐƯỜNG announced the results of the bid package Provide food, raw materials .
- Winning bidder: Công ty Cổ phần Thực Phẩm Ngon-Sạch Bổ
29/08/2025 21:17
TRƯỜNG MẦM NON HẢI ĐƯỜNG publishes the plan Providing food, ingredients, and input fuel to make school meals for semi -boarding students in Hai Duong Kindergarten - school year 2025-2026 with 2 bidding package .
29/08/2025 21:09
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the results of the bidding package Repairing and building lakes and sand holes; Renovating the front + rear yard, tiles of the main hall, building a tree in front of the gate and pouring concrete to expand the floor of Hai Duong Kindergarten teacher of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG.
- Winning bidder: CHAU HANH PHAT CO.,LTD
22/05/2025 08:11
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Repairing and building lakes and sand holes; Renovating the front + rear yard, tiles of the main hall, building a tree in front of the gate and pouring concrete to expand the floor of Hai Duong Kindergarten teacher of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
21/05/2025 15:51
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the results of the bidding package Shopping for the canvas frame of Hai Duong Kindergarten of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG.
- Winning bidder: CÔNG TY TNHH KIẾN AN KHANG
19/04/2025 08:44
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Shopping for the canvas frame of Hai Duong Kindergarten of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
18/04/2025 11:05
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Science and Technology estimates the purchase of teaching and learning equipment for Hai Duong Kindergarten of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
26/12/2024 14:29
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the results of the bidding package Civil Works of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG.
- Winning bidder: HA QUANG CONTRUCTION & TRADING JOINT STOCK COMPANY
17/10/2024 16:00
The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted the request Project: Repair of Hai Duong Kindergarten - Category: PVC paneling and ceiling of classroom + kitchen 2 of the investor TRƯỜNG MẦM NON HẢI ĐƯỜNG with 1 bidding package.
16/10/2024 14:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted 6 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON HẢI ĐƯỜNG has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON HẢI ĐƯỜNG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects