Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON LAM SƠN as follows:
- Has relationships with 2 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 2 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 155,744,200 VND, of which the total winning bid value is: 155,744,200 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON LAM SƠN as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 155,744,200 VND, in which the total winning value is: 155,744,200 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 2 Contractor selection plan in which 2 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the results of the bidding package Purchasing a system of tables for study and professional work of the investor TRƯỜNG MẦM NON LAM SƠN.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ QUẢNG CÁO VÀ THƯƠNG MẠI SANG HẰNG
26/07/2024 17:00
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the request Purchasing a system of tables for study and professional work of the investor TRƯỜNG MẦM NON LAM SƠN with 1 bidding package.
26/07/2024 16:36
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the results of the bidding package Repairing leveling, building boundary walls, pouring concrete for the foundation and constructing the roof of the teacher's cart for Lam Son Kindergarten of the investor TRƯỜNG MẦM NON LAM SƠN.
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ LÀNH
17/07/2024 09:48
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the request Repairing leveling, building boundary walls, pouring concrete for the foundation and constructing the roof of the teacher's cart for Lam Son Kindergarten of the investor TRƯỜNG MẦM NON LAM SƠN with 1 bidding package.
13/07/2024 09:30
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON LAM SƠN announced the results of the bid package Purchasing a system of tables for study and professional work .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ QUẢNG CÁO VÀ THƯƠNG MẠI SANG HẰNG
26/07/2024 17:00
TRƯỜNG MẦM NON LAM SƠN publishes the plan Purchasing a system of tables for study and professional work with 1 bidding package .
26/07/2024 16:36
TRƯỜNG MẦM NON LAM SƠN announced the results of the bid package Repairing leveling, building boundary walls, pouring concrete for the foundation and constructing the roof of the teacher's cart for Lam Son Kindergarten .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ LÀNH
17/07/2024 09:48
TRƯỜNG MẦM NON LAM SƠN publishes the plan Repairing leveling, building boundary walls, pouring concrete for the foundation and constructing the roof of the teacher's cart for Lam Son Kindergarten with 1 bidding package .
13/07/2024 09:30
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the results of the bidding package Purchasing a system of tables for study and professional work of the investor TRƯỜNG MẦM NON LAM SƠN.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ QUẢNG CÁO VÀ THƯƠNG MẠI SANG HẰNG
26/07/2024 17:00
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the request Purchasing a system of tables for study and professional work of the investor TRƯỜNG MẦM NON LAM SƠN with 1 bidding package.
26/07/2024 16:36
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the results of the bidding package Repairing leveling, building boundary walls, pouring concrete for the foundation and constructing the roof of the teacher's cart for Lam Son Kindergarten of the investor TRƯỜNG MẦM NON LAM SƠN.
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ LÀNH
17/07/2024 09:48
The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted the request Repairing leveling, building boundary walls, pouring concrete for the foundation and constructing the roof of the teacher's cart for Lam Son Kindergarten of the investor TRƯỜNG MẦM NON LAM SƠN with 1 bidding package.
13/07/2024 09:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON LAM SƠN has posted 2 of the contractor selection plan, which contains 2 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON LAM SƠN has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRƯỜNG MẦM NON LAM SƠN has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TRƯỜNG MẦM NON LAM SƠN is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor TRƯỜNG MẦM NON LAM SƠN is an investor with 2 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code