Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON MẪU ĐƠN as follows:
- Has relationships with 1 project owners.
- Has relationships with 12 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 7 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 375,657,000 VND, of which the total winning bid value is: 366,841,000 VND.
- The savings rate is: 2.35%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON MẪU ĐƠN as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 375,657,000 VND, in which the total winning value is: 366,841,000 VND.
- The savings rate is: 2.35%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON MẪU ĐƠN are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 9 contractor selection plans, of which 4 were self-published, and 5 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Renovating electrical systems and equipped with essential equipment and equipment at facility 2 .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ PHÁP VÂN
09/10/2025 14:14
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Equipped with personal belongings for semi -boarding students .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ KHÁNH TRANG
07/10/2025 15:35
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Equipped with personal belongings for semi -boarding school students with 1 bidding package .
07/10/2025 15:32
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Supply yogurt, flan for Mau Mau Kindergarten - school year 2025 - 2026 .
- Winning bidder: Công ty TNHH Thực Phẩm Khương Duy
03/10/2025 17:06
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Supply yogurt, flan for Mau Mau Kindergarten - school year 2025 - 2026 with 1 bidding package .
03/10/2025 16:59
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Renovating electrical systems and equipped with essential items and equipment at facility 2 Mau Mau Kindergarten (36 Tran Anh Tong) of Mau Mau Kindergarten with 1 bidding package .
26/09/2025 16:04
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Bidding package: "Supplying milk powder for Peony Kindergarten in the school year 2025-2026" .
- Winning bidder: CÔNG TY TNHH MTV KHOA KHÁNH PHƯƠNG
20/09/2025 16:38
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Bidding package: "Supplying milk powder for Peony Kindergarten in the school year 2025-2026" with 1 bidding package .
20/09/2025 16:30
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Provide food and input materials to perform school meals for semi -boarding students of Mau Mau Kindergarten - school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH ĐẮC VINH
09/09/2025 18:54
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Provide food and input materials to perform school meals for semi -boarding students of Mau Mau Kindergarten - school year 2025-2026 with 1 bidding package .
09/09/2025 18:48
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Equipped with a nameplate on the front of the facility 2 36 Tran Anh Tong .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN QUẢNG CÁO TRƯỜNG LÊ
17/01/2025 10:17
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Equipped with a nameplate on the front of the facility 2 36 Tran Anh Tong with 1 bidding package .
17/01/2025 10:13
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Sunshades, school nameplates, pumps .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI THANH KIM SƠN
21/05/2024 11:13
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Shopping in 2024 of Mau Don Kindergarten with 1 bidding package .
08/05/2024 09:02
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Renovate the outdoor sand play area .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI THANH KIM SƠN
23/01/2024 16:59
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Project implementation: Renovating the outdoor sand play area at Mau Don Kindergarten with 1 bidding package .
23/01/2024 16:56
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package LED boards, folding awnings, plastic chairs .
- Winning bidder: BINH NGUYEN TECHNOLOGY SOLUTIONS COMPANY
23/11/2023 15:50
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Deploying procurement in 2023 of Mau Don Kindergarten with 1 bidding package .
11/11/2023 16:45
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Solid wood play set .
- Winning bidder: Cửa Hàng Hồng Phúc
30/11/2022 19:31
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Camera system, teaching assistant machine .
- Winning bidder: Lê Tự Long Vĩ
30/11/2022 19:19
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Renovating electrical systems and equipped with essential equipment and equipment at facility 2 .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ PHÁP VÂN
09/10/2025 14:14
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Equipped with personal belongings for semi -boarding students .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ KHÁNH TRANG
07/10/2025 15:35
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Equipped with personal belongings for semi -boarding school students with 1 bidding package .
07/10/2025 15:32
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Supply yogurt, flan for Mau Mau Kindergarten - school year 2025 - 2026 .
- Winning bidder: Công ty TNHH Thực Phẩm Khương Duy
03/10/2025 17:06
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Supply yogurt, flan for Mau Mau Kindergarten - school year 2025 - 2026 with 1 bidding package .
03/10/2025 16:59
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Renovating electrical systems and equipped with essential items and equipment at facility 2 Mau Mau Kindergarten (36 Tran Anh Tong) of Mau Mau Kindergarten with 1 bidding package .
26/09/2025 16:04
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Bidding package: "Supplying milk powder for Peony Kindergarten in the school year 2025-2026" .
- Winning bidder: CÔNG TY TNHH MTV KHOA KHÁNH PHƯƠNG
20/09/2025 16:38
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Bidding package: "Supplying milk powder for Peony Kindergarten in the school year 2025-2026" with 1 bidding package .
20/09/2025 16:30
TRƯỜNG MẦM NON MẪU ĐƠN announced the results of the bid package Provide food and input materials to perform school meals for semi -boarding students of Mau Mau Kindergarten - school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH ĐẮC VINH
09/09/2025 18:54
TRƯỜNG MẦM NON MẪU ĐƠN publishes the plan Provide food and input materials to perform school meals for semi -boarding students of Mau Mau Kindergarten - school year 2025-2026 with 1 bidding package .
09/09/2025 18:48
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON MẪU ĐƠN has posted 7 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON MẪU ĐƠN has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON MẪU ĐƠN has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON MẪU ĐƠN has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects