Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Mường Bằng as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 25 contractor selection plans with a total of 25 bidding packages, of which 25 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 24 packages that have not fully posted the contractor selection results. Of these 24 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 98,580,000 VND, of which the total winning bid value is: 98,580,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm non Mường Bằng as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 98,580,000 VND, in which the total winning value is: 98,580,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm non Mường Bằng are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 25 contractor selection plans, of which 24 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm non Mường Bằng announced the results of the bid package Package No. 03 .
- Winning bidder: Hộ kinh doanh Nguyễn Văn Huy
02/10/2025 11:18
Trường Mầm non Mường Bằng announced the results of the bid package Package No. 02 .
- Winning bidder: Xưởng nước lọc Vietsla
02/10/2025 11:13
Trường Mầm non Mường Bằng announced the results of the bid package Package No. 01 .
- Winning bidder: HỢP TÁC XÃ SẢN XUẤT VÀ PHÁT TRIỂN THƯƠNG MẠI THỰC PHẨM HẢI ÂU
02/10/2025 10:45
Trường Mầm non Mường Bằng publishes the plan The plan to select the contractor supply food, raw materials, and fuel to provide school meals for semi -boarding students at Muong Bang Kindergarten 2025 - 2026 with 3 bidding package .
23/09/2025 16:10
The Bid solicitor Trường Mầm non Mường Bằng has posted the results of the bidding package Construction and installation works of the investor Trường Mầm non Mường Bằng.
- Winning bidder: CÔNG TY TNHH ĐTXD THẾ TOÀN
05/12/2024 08:33
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Project contractor selection plan: Renovating and upgrading toilets for teachers at Muong Bang Kindergarten, Muong Bang commune (central point), Mai Son district of the investor Trường Mầm non Mường Bằng with 1 bidding package.
01/11/2024 16:24
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Buy Stationery at the beginning of the 2018 - 2019 school year for CBGV of the investor Trường Mầm non Mường Bằng with 1 bidding package.
10/08/2018 17:52
The Bid solicitor Trường Mầm non Mường Bằng has posted the request cbvnvbn of the investor Trường Mầm non Mường Bằng with 1 bidding package.
30/07/2018 10:24
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Vacuuming the septic tank for waste treatment of the investor Trường Mầm non Mường Bằng with 1 bidding package.
20/06/2018 11:21
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Painted decorative wall covering the central area, replacing the school signboard system of the investor Trường Mầm non Mường Bằng with 1 bidding package.
20/06/2018 11:16
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Mường Bằng announced the results of the bid package Construction and installation works .
- Winning bidder: CÔNG TY TNHH ĐTXD THẾ TOÀN
05/12/2024 08:33
Trường Mầm non Mường Bằng publishes the plan Project contractor selection plan: Renovating and upgrading toilets for teachers at Muong Bang Kindergarten, Muong Bang commune (central point), Mai Son district with 1 bidding package .
01/11/2024 16:24
Trường Mầm non Mường Bằng publishes the plan Buy Stationery at the beginning of the 2018 - 2019 school year for CBGV with 1 bidding package .
10/08/2018 17:52
Trường Mầm non Mường Bằng publishes the plan Vacuuming the septic tank for waste treatment with 1 bidding package .
20/06/2018 11:21
Trường Mầm non Mường Bằng publishes the plan Painted decorative wall covering the central area, replacing the school signboard system with 1 bidding package .
20/06/2018 11:16
Trường Mầm non Mường Bằng publishes the plan Repair and replace plastic ceiling for BGH room (3 rooms) with 1 bidding package .
20/06/2018 05:26
Trường Mầm non Mường Bằng publishes the plan Decorate the wall around the Center, the school's sign system with 1 bidding package .
20/06/2018 05:23
Trường Mầm non Mường Bằng publishes the plan Buy fabric umbrella with diameter 20m with 1 bidding package .
02/05/2018 08:30
Trường Mầm non Mường Bằng publishes the plan Buy Office supplies and tools for school in 2018 with 1 bidding package .
01/05/2018 12:32
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm non Mường Bằng announced the results of the bid package Package No. 03 .
- Winning bidder: Hộ kinh doanh Nguyễn Văn Huy
02/10/2025 11:18
Trường Mầm non Mường Bằng announced the results of the bid package Package No. 02 .
- Winning bidder: Xưởng nước lọc Vietsla
02/10/2025 11:13
Trường Mầm non Mường Bằng announced the results of the bid package Package No. 01 .
- Winning bidder: HỢP TÁC XÃ SẢN XUẤT VÀ PHÁT TRIỂN THƯƠNG MẠI THỰC PHẨM HẢI ÂU
02/10/2025 10:45
Trường Mầm non Mường Bằng publishes the plan The plan to select the contractor supply food, raw materials, and fuel to provide school meals for semi -boarding students at Muong Bang Kindergarten 2025 - 2026 with 3 bidding package .
23/09/2025 16:10
The Bid solicitor Trường Mầm non Mường Bằng has posted the results of the bidding package Construction and installation works of the investor Trường Mầm non Mường Bằng.
- Winning bidder: CÔNG TY TNHH ĐTXD THẾ TOÀN
05/12/2024 08:33
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Project contractor selection plan: Renovating and upgrading toilets for teachers at Muong Bang Kindergarten, Muong Bang commune (central point), Mai Son district of the investor Trường Mầm non Mường Bằng with 1 bidding package.
01/11/2024 16:24
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Buy Stationery at the beginning of the 2018 - 2019 school year for CBGV of the investor Trường Mầm non Mường Bằng with 1 bidding package.
10/08/2018 17:52
The Bid solicitor Trường Mầm non Mường Bằng has posted the request cbvnvbn of the investor Trường Mầm non Mường Bằng with 1 bidding package.
30/07/2018 10:24
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Vacuuming the septic tank for waste treatment of the investor Trường Mầm non Mường Bằng with 1 bidding package.
20/06/2018 11:21
The Bid solicitor Trường Mầm non Mường Bằng has posted the request Painted decorative wall covering the central area, replacing the school signboard system of the investor Trường Mầm non Mường Bằng with 1 bidding package.
20/06/2018 11:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm non Mường Bằng has posted 25 of the contractor selection plan, which contains 25 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm non Mường Bằng has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm non Mường Bằng has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm non Mường Bằng has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects