Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Mầm Non Ngũ Phúc as follows:
- Has relationships with 1 project owners.
- Has relationships with 14 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 17 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 13 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 12 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,181,102,000 VND, of which the total winning bid value is: 2,092,883,000 VND.
- The savings rate is: 4.04%.
Data analysis results of DauThau.info software for bid solicitors Trường Mầm Non Ngũ Phúc as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,181,102,000 VND, in which the total winning value is: 2,092,883,000 VND.
- The savings rate is: 4.04%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Mầm Non Ngũ Phúc are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 12 contractor selection plans, of which 10 were self-published, and 2 were published by other entities.
- Is the investor of 3 Tender Notices, of which 2 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Mầm Non Ngũ Phúc announced the results of the bid package Shopping for hygienic utensils for students of Ngu Phuc Kindergarten for the school year: 2025-2026 .
- Winning bidder: Hộ kinh doanh Trương Quang Hải
13/10/2025 13:25
Trường Mầm Non Ngũ Phúc publishes the plan Shopping for hygienic utensils for students of Ngu Phuc Kindergarten for the school year: 2025-2026 with 1 bidding package .
07/10/2025 15:57
Trường Mầm Non Ngũ Phúc announced the results of the bid package Bidding package for semi-boarding students in the school year 2025-2026 of Ngu Phuc Kindergarten .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI MI NA
07/09/2025 11:06
Trường Mầm Non Ngũ Phúc announced the results of the bid package Providing fresh food for cooking for semi-boarding students in the school year 2025-2026 of Ngu Phuc Kindergarten .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC TOAN
07/09/2025 10:24
Trường Mầm Non Ngũ Phúc publishes the plan Procurement of fresh food for cooking for semi-boarding students in the school year 2025-2026 of Ngu Phuc Kindergarten with 2 bidding package .
31/08/2025 16:27
The Bid solicitor CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC has posted the results of the bidding package No. 06 - Construction works of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ PHÁT TRIỂN XÂY DỰNG MẠNH THẮNG
03/06/2025 16:25
Bid solicitor CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC has posted Tender Notice No. 06 - Construction works of the investor Trường Mầm Non Ngũ Phúc with the form Competitive Offer.
23/05/2025 15:32
The Bid solicitor Trường Mầm Non Ngũ Phúc has posted the results of the bidding package No. 03 - Bidding consultation and Bid evaluation of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
21/05/2025 17:30
The Bid solicitor Trường Mầm Non Ngũ Phúc has posted the results of the bidding package No. 02 - Construction supervision consultant of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
21/05/2025 17:28
The Bid solicitor Trường Mầm Non Ngũ Phúc has posted the results of the bidding package No. 01 - Project Management Consulting of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG LINE GROUP
21/05/2025 17:26
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non Ngũ Phúc announced the results of the bid package No. 03 - Bidding consultation and Bid evaluation .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
21/05/2025 17:30
Trường Mầm Non Ngũ Phúc announced the results of the bid package No. 02 - Construction supervision consultant .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
21/05/2025 17:28
Trường Mầm Non Ngũ Phúc announced the results of the bid package No. 01 - Project Management Consulting .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG LINE GROUP
21/05/2025 17:26
Trường Mầm Non Ngũ Phúc publishes the plan Overcome the repair of the roof of the 2 -storey classroom of the 10 -storey classroom of damage after storm Yagi (storm No. 3 in 2024) of Ngu Phuc Kindergarten, Kim Thanh District with 6 bidding package .
21/05/2025 17:24
Trường Mầm Non Ngũ Phúc announced the results of the bid package Package 02: Consultancy and verification of construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG VTV
10/04/2025 09:48
Trường Mầm Non Ngũ Phúc announced the results of the bid package Package 01: Consulting on making economic and technical reports .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
10/04/2025 09:45
Trường Mầm Non Ngũ Phúc publishes the plan Overcome the repair of the roof of the 2 -storey classroom of the 10 -storey classroom of damage after storm Yagi (storm No. 3 in 2024) of Ngu Phuc Kindergarten, Kim Thanh District with 2 bidding package .
10/04/2025 09:43
Trường Mầm Non Ngũ Phúc announced the results of the bid package Package No. 2: Construction and repair work .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG KIM THÀNH HD
04/04/2025 14:27
Trường Mầm Non Ngũ Phúc publishes the plan Approval of works of works with 2 bidding package .
04/04/2025 14:25
Trường Mầm Non Ngũ Phúc announced the results of the bid package Buy school and classroom cleaning supplies for students to serve the children of Ngu Phuc Kindergarten School year: 2024-2025 .
- Winning bidder: GAMA SERVICE AND TRADING JOINT STOCK COMPANY
09/12/2024 21:30
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non Ngũ Phúc announced the results of the bid package Shopping for hygienic utensils for students of Ngu Phuc Kindergarten for the school year: 2025-2026 .
- Winning bidder: Hộ kinh doanh Trương Quang Hải
13/10/2025 13:25
Trường Mầm Non Ngũ Phúc publishes the plan Shopping for hygienic utensils for students of Ngu Phuc Kindergarten for the school year: 2025-2026 with 1 bidding package .
07/10/2025 15:57
Trường Mầm Non Ngũ Phúc announced the results of the bid package Bidding package for semi-boarding students in the school year 2025-2026 of Ngu Phuc Kindergarten .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI MI NA
07/09/2025 11:06
Trường Mầm Non Ngũ Phúc announced the results of the bid package Providing fresh food for cooking for semi-boarding students in the school year 2025-2026 of Ngu Phuc Kindergarten .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC TOAN
07/09/2025 10:24
Trường Mầm Non Ngũ Phúc publishes the plan Procurement of fresh food for cooking for semi-boarding students in the school year 2025-2026 of Ngu Phuc Kindergarten with 2 bidding package .
31/08/2025 16:27
The Bid solicitor CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC has posted the results of the bidding package No. 06 - Construction works of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ PHÁT TRIỂN XÂY DỰNG MẠNH THẮNG
03/06/2025 16:25
Bid solicitor CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC has posted Tender Notice No. 06 - Construction works of the investor Trường Mầm Non Ngũ Phúc with the form Competitive Offer.
23/05/2025 15:32
The Bid solicitor Trường Mầm Non Ngũ Phúc has posted the results of the bidding package No. 03 - Bidding consultation and Bid evaluation of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
21/05/2025 17:30
The Bid solicitor Trường Mầm Non Ngũ Phúc has posted the results of the bidding package No. 02 - Construction supervision consultant of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG DBC
21/05/2025 17:28
The Bid solicitor Trường Mầm Non Ngũ Phúc has posted the results of the bidding package No. 01 - Project Management Consulting of the investor Trường Mầm Non Ngũ Phúc.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG LINE GROUP
21/05/2025 17:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Mầm Non Ngũ Phúc has posted 14 of the contractor selection plan, which contains 17 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường Mầm Non Ngũ Phúc has posted 2 Tender Notices in 1 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm Non Ngũ Phúc has posted 13 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 13 package, canceled the bid 0 package (among the bidding packages above).
- There are 12 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Mầm Non Ngũ Phúc has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Mầm Non Ngũ Phúc has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Mầm Non Ngũ Phúc has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects