Data analysis results of DauThau.info software for bid solicitors Trường mầm non Sơn Ca as follows:
- Has relationships with 1 project owners.
- Has relationships with 18 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 20 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 19 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 75.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 7,904,789,000 VND, of which the total winning bid value is: 7,834,901,971 VND.
- The savings rate is: 0.88%.
Data analysis results of DauThau.info software for bid solicitors Trường mầm non Sơn Ca as follows:
- Has relationships with 18 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 75.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 7,904,789,000 VND, in which the total winning value is: 7,834,901,971 VND.
- The savings rate is: 0.88%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường mầm non Sơn Ca are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 10 contractor selection plans, of which 7 were self-published, and 3 were published by other entities.
- Is the investor of 5 Tender Notices, of which 4 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Procurement of assets, teaching equipment of Son Ca Kindergarten to serve the school year 2025-2026 of the investor Trường mầm non Sơn Ca.
- Winning bidder: THANH ANH SERVICE AND TECHNOLOGY JOINT STOCK COMPANY
09/09/2025 14:37
Trường mầm non Sơn Ca publishes the plan The plan to select contractors tasks to procure assets, teaching equipment of Son Ca Kindergarten for the school year 2025-2026 with 1 bidding package .
27/08/2025 11:40
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Consultancy and verification of construction design drawings and cost estimates of the investor Trường mầm non Sơn Ca.
- Winning bidder: GREEN HOUSE ARCHITECHTURE CONSTRUCTION JOINT STOCK COMPANY
02/01/2025 12:07
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Consulting on Preparation of Finance and Technical Report of the investor Trường mầm non Sơn Ca.
- Winning bidder: Công ty cổ phần tư vấn xây dựng và chuyển giao công nghệ môi trường ENVICO
02/01/2025 12:05
The Bid solicitor Trường mầm non Sơn Ca has posted the request Plan for selecting contractors for consulting packages implemented in the construction investment preparation phase of the project: Repairing and overcoming the consequences of storm No. 3 at Son Ca Kindergarten project of the investor Trường mầm non Sơn Ca with 2 bidding package.
02/01/2025 12:00
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Civil Works of the investor Trường mầm non Sơn Ca.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THÀNH ĐẠT HẢI PHÒNG
04/12/2024 14:11
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Trường mầm non Sơn Ca.
- Winning bidder: SON PHUC CONSTRUCTION LIMITED COMPANY
22/11/2024 10:19
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Appraisal of bidding documents and technical design documents of the investor Trường mầm non Sơn Ca.
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
22/11/2024 10:13
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Supervision consultancy of the investor Trường mầm non Sơn Ca.
- Winning bidder: Công ty cổ phần tư vấn xây dựng và chuyển giao công nghệ môi trường ENVICO
22/11/2024 10:11
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Project management consultancy of the investor Trường mầm non Sơn Ca.
- Winning bidder: DIEP ANH CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
22/11/2024 10:04
The data sheet has been partially hidden, to see the full information please Login or Register
Trường mầm non Sơn Ca announced the results of the bid package Procurement of assets, teaching equipment of Son Ca Kindergarten to serve the school year 2025-2026 .
- Winning bidder: THANH ANH SERVICE AND TECHNOLOGY JOINT STOCK COMPANY
09/09/2025 14:37
Trường mầm non Sơn Ca announced the results of the bid package Consultancy and verification of construction design drawings and cost estimates .
- Winning bidder: GREEN HOUSE ARCHITECHTURE CONSTRUCTION JOINT STOCK COMPANY
02/01/2025 12:07
Trường mầm non Sơn Ca announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: Công ty cổ phần tư vấn xây dựng và chuyển giao công nghệ môi trường ENVICO
02/01/2025 12:05
Trường mầm non Sơn Ca publishes the plan Plan for selecting contractors for consulting packages implemented in the construction investment preparation phase of the project: Repairing and overcoming the consequences of storm No. 3 at Son Ca Kindergarten project with 2 bidding package .
02/01/2025 12:00
Trường mầm non Sơn Ca announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THÀNH ĐẠT HẢI PHÒNG
04/12/2024 14:11
Trường mầm non Sơn Ca announced the results of the bidding package Civil Works with 1 participating contractors .
28/11/2024 15:01
Trường mầm non Sơn Ca announced the results of the bid package Prepare and Evaluate Tender documents .
- Winning bidder: SON PHUC CONSTRUCTION LIMITED COMPANY
22/11/2024 10:19
Trường mầm non Sơn Ca announced the results of the bid package Appraisal of bidding documents and technical design documents .
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
22/11/2024 10:13
Trường mầm non Sơn Ca announced the results of the bid package Supervision consultancy .
- Winning bidder: Công ty cổ phần tư vấn xây dựng và chuyển giao công nghệ môi trường ENVICO
22/11/2024 10:11
Trường mầm non Sơn Ca announced the results of the bid package Project management consultancy .
- Winning bidder: DIEP ANH CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
22/11/2024 10:04
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Procurement of assets, teaching equipment of Son Ca Kindergarten to serve the school year 2025-2026 of the investor Trường mầm non Sơn Ca.
- Winning bidder: THANH ANH SERVICE AND TECHNOLOGY JOINT STOCK COMPANY
09/09/2025 14:37
Trường mầm non Sơn Ca publishes the plan The plan to select contractors tasks to procure assets, teaching equipment of Son Ca Kindergarten for the school year 2025-2026 with 1 bidding package .
27/08/2025 11:40
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Consultancy and verification of construction design drawings and cost estimates of the investor Trường mầm non Sơn Ca.
- Winning bidder: GREEN HOUSE ARCHITECHTURE CONSTRUCTION JOINT STOCK COMPANY
02/01/2025 12:07
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Consulting on Preparation of Finance and Technical Report of the investor Trường mầm non Sơn Ca.
- Winning bidder: Công ty cổ phần tư vấn xây dựng và chuyển giao công nghệ môi trường ENVICO
02/01/2025 12:05
The Bid solicitor Trường mầm non Sơn Ca has posted the request Plan for selecting contractors for consulting packages implemented in the construction investment preparation phase of the project: Repairing and overcoming the consequences of storm No. 3 at Son Ca Kindergarten project of the investor Trường mầm non Sơn Ca with 2 bidding package.
02/01/2025 12:00
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Civil Works of the investor Trường mầm non Sơn Ca.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THÀNH ĐẠT HẢI PHÒNG
04/12/2024 14:11
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Trường mầm non Sơn Ca.
- Winning bidder: SON PHUC CONSTRUCTION LIMITED COMPANY
22/11/2024 10:19
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Appraisal of bidding documents and technical design documents of the investor Trường mầm non Sơn Ca.
- Winning bidder: DAI DUONG CONSTRUCTION AND DESIGN JOINT STOCK COMPANY
22/11/2024 10:13
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Supervision consultancy of the investor Trường mầm non Sơn Ca.
- Winning bidder: Công ty cổ phần tư vấn xây dựng và chuyển giao công nghệ môi trường ENVICO
22/11/2024 10:11
The Bid solicitor Trường mầm non Sơn Ca has posted the results of the bidding package Project management consultancy of the investor Trường mầm non Sơn Ca.
- Winning bidder: DIEP ANH CONSTRUCTION DESIGN CONSULTING COMPANY LIMITED
22/11/2024 10:04
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường mầm non Sơn Ca has posted 7 of the contractor selection plan, which contains 20 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường mầm non Sơn Ca has posted 4 Tender Notices in 4 bidding packages. Among these, 3 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường mầm non Sơn Ca has posted 19 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 19 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường mầm non Sơn Ca has a relationship with 18 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường mầm non Sơn Ca has a relationship with 7 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường mầm non Sơn Ca has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects