Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON TAM PHƯỚC as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 2 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 291,280,000 VND, of which the total winning bid value is: 291,280,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON TAM PHƯỚC as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 291,280,000 VND, in which the total winning value is: 291,280,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON TAM PHƯỚC are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 7 contractor selection plans, of which 5 were self-published, and 2 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Estimated and planning plan for food procurement adjustment for the semi-boarding work in 2025-2026 of Tam Phuoc Kindergarten with 4 bidding package .
28/09/2025 20:47
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Provide cooking gas .
08/09/2025 08:45
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Provide food, food ingredients, detergents .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Hoàng Mai
07/09/2025 13:56
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Supply Plus A+ Milk powder .
- Winning bidder: Cửa hàng lương thực và bách hóa tổng hợp Đăng Khoa
07/09/2025 13:23
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Drink water .
- Winning bidder: Hộ kinh doanh cửa hàng Huy Tùng
07/09/2025 13:05
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Estimates and planning for food shopping contractors for the semi-boarding work in 2025-2026 of Tam Phuoc Kindergarten with 4 bidding package .
07/09/2025 13:00
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the results of the bidding package Procurement of assets and equipment of Tam Phuoc Kindergarten in 2025 of the investor TRƯỜNG MẦM NON TAM PHƯỚC.
- Winning bidder: HỘ KINH DOANH CỬA HÀNG TUẤN ANH
12/05/2025 12:50
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the request Procurement of assets and equipment of Tam Phuoc Kindergarten in 2025 of the investor TRƯỜNG MẦM NON TAM PHƯỚC with 1 bidding package.
09/05/2025 11:08
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the results of the bidding package Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 of the investor TRƯỜNG MẦM NON TAM PHƯỚC.
- Winning bidder: HỘ KINH DOANH CỬA HÀNG TUẤN ANH
28/10/2024 11:18
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the request Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 of the investor TRƯỜNG MẦM NON TAM PHƯỚC with 1 bidding package.
23/10/2024 13:41
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Procurement of assets and equipment of Tam Phuoc Kindergarten in 2025 .
- Winning bidder: HỘ KINH DOANH CỬA HÀNG TUẤN ANH
12/05/2025 12:50
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Procurement of assets and equipment of Tam Phuoc Kindergarten in 2025 with 1 bidding package .
09/05/2025 11:08
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 .
- Winning bidder: HỘ KINH DOANH CỬA HÀNG TUẤN ANH
28/10/2024 11:18
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 with 1 bidding package .
23/10/2024 13:41
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 with 1 bidding package .
23/10/2024 13:33
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 with 1 bidding package .
19/06/2024 16:47
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 with 1 bidding package .
19/06/2024 16:29
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Estimated and planning plan for food procurement adjustment for the semi-boarding work in 2025-2026 of Tam Phuoc Kindergarten with 4 bidding package .
28/09/2025 20:47
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Provide cooking gas .
08/09/2025 08:45
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Provide food, food ingredients, detergents .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Hoàng Mai
07/09/2025 13:56
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Supply Plus A+ Milk powder .
- Winning bidder: Cửa hàng lương thực và bách hóa tổng hợp Đăng Khoa
07/09/2025 13:23
TRƯỜNG MẦM NON TAM PHƯỚC announced the results of the bid package Drink water .
- Winning bidder: Hộ kinh doanh cửa hàng Huy Tùng
07/09/2025 13:05
TRƯỜNG MẦM NON TAM PHƯỚC publishes the plan Estimates and planning for food shopping contractors for the semi-boarding work in 2025-2026 of Tam Phuoc Kindergarten with 4 bidding package .
07/09/2025 13:00
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the results of the bidding package Procurement of assets and equipment of Tam Phuoc Kindergarten in 2025 of the investor TRƯỜNG MẦM NON TAM PHƯỚC.
- Winning bidder: HỘ KINH DOANH CỬA HÀNG TUẤN ANH
12/05/2025 12:50
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the request Procurement of assets and equipment of Tam Phuoc Kindergarten in 2025 of the investor TRƯỜNG MẦM NON TAM PHƯỚC with 1 bidding package.
09/05/2025 11:08
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the results of the bidding package Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 of the investor TRƯỜNG MẦM NON TAM PHƯỚC.
- Winning bidder: HỘ KINH DOANH CỬA HÀNG TUẤN ANH
28/10/2024 11:18
The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted the request Procurement of non-centralized assets and equipment of Tam Phuoc Kindergarten in 2024 of the investor TRƯỜNG MẦM NON TAM PHƯỚC with 1 bidding package.
23/10/2024 13:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON TAM PHƯỚC has posted 5 of the contractor selection plan, which contains 2 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON TAM PHƯỚC has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON TAM PHƯỚC has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects