Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường MN Hành Phước as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường MN Hành Phước as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường MN Hành Phước are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 3 contractor selection plans, of which 0 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường MN Hành Phước announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: CÔNG TY TNHH MTV XÂY LẮP THIÊN THƯ
14/08/2026 08:31
Trường MN Hành Phước announced the results of the bid package Tender package No 01: Construction .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THANH ĐỊNH
14/08/2026 08:13
Trường MN Hành Phước publishes the plan Construction Contractor Selection Plan: Repair, Upgrade, and Renovation of Hang Phuoc Kindergarten with 2 bidding package .
14/08/2026 08:11
Investor Trường MN Hành Phước has posted an investment and development project Repair, upgrade, and renovation of the Han Phuc Kindergarten.
13/08/2026 15:15
Trường MN Hành Phước announced the results of the bid package Bidding package for consulting and verifying construction drawing design and cost estimate .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG MINH TƯỜNG GIA
22/07/2026 14:40
Trường MN Hành Phước announced the results of the bid package Bidding Package for Economic and Technical Report Preparation .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG CƯỜNG THỊNH
22/07/2026 14:38
Trường MN Hành Phước announced the results of the bid package Project management consulting contract package .
- Winning bidder: SIC CONSTRUCTION INVESTMENT SOLUTIONS COMPANY LIMITED
22/07/2026 14:36
Trường MN Hành Phước publishes the plan Contractor selection plan for investment preparation phase Project: Repair, upgrade and renovate Hanh Phuoc Kindergarten with 3 bidding package .
22/07/2026 14:34
Trường MN Hành Phước announced the results of the bid package Bidding package: Procurement of assets and teaching equipment to serve the 2025 educational program of Hanh Phuoc Kindergarten .
- Winning bidder: HỘ KINH DOANH TRUNG TÂM THƯƠNG MẠI DỊCH VỤ THIẾT BỊ CÔNG NGHỆ THÀNH ĐẠT
16/12/2025 17:19
Trường MN Hành Phước publishes the plan Procurement of assets and teaching equipment to serve the 2025 educational program of Hanh Phuoc Kindergarten with 1 bidding package .
16/12/2025 17:11
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects