Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS LÊ QUÝ ĐÔN as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 4 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 3 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 268,910,000 VND, of which the total winning bid value is: 267,910,000 VND.
- The savings rate is: 0.37%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS LÊ QUÝ ĐÔN as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 268,910,000 VND, in which the total winning value is: 267,910,000 VND.
- The savings rate is: 0.37%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS LÊ QUÝ ĐÔN are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 6 contractor selection plans, of which 3 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Procurement and installation of Camera system for Le Quy Don Secondary School .
- Winning bidder: HỘ KINH DOANH THƯƠNG MẠI DỊCH VỤ THANH ĐỨC
28/11/2025 08:49
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Procurement and installation of Camera system for Le Quy Don Secondary School with 1 bidding package .
17/11/2025 10:11
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Shopping for meals .
- Winning bidder: Công ty TNHH Thương mại và Dịch vụ Thành Anh
04/09/2025 17:16
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Shopping for pure drinking water for students in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI VÀ DỊCH VỤ THẢO LINH
04/09/2025 17:05
Investor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted an investment and development project Buy meals for semi -boarding activities.
04/09/2025 16:16
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Shopping for pure drinking water for educational activities with 1 bidding package .
04/09/2025 10:53
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Make a boarding board with 1 bidding package .
04/09/2025 10:45
The Bid solicitor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted the results of the bidding package Tender package No 01: Construction work of the investor TRƯỜNG THCS LÊ QUÝ ĐÔN.
- Winning bidder: Công ty cổ phần xây dựng thương mại và dịch vụ Hải Anh
11/11/2024 16:09
The Bid solicitor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted the request Le Quy Don Secondary School, Kien Xuong district; Category: School yard renovation of the investor TRƯỜNG THCS LÊ QUÝ ĐÔN with 1 bidding package.
11/11/2024 15:49
Investor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted an investment and development project Renovating the school yard.
11/11/2024 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Tender package No 01: Construction work .
- Winning bidder: Công ty cổ phần xây dựng thương mại và dịch vụ Hải Anh
11/11/2024 16:09
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Le Quy Don Secondary School, Kien Xuong district; Category: School yard renovation with 1 bidding package .
11/11/2024 15:49
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Package 01: Providing boarding meals for students in the 2024-2025 school year .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ GIÁO DỤC QUYỀN TÂN
25/09/2024 17:44
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Package No. 02: Providing pure drinking water for students in the 2024-2025 school year .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI VÀ DỊCH VỤ THẢO LINH
25/09/2024 17:36
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Approve the contractor selection plan for bidding packages under the budget estimate for providing boarding meals for students in the 2024-2025 school year with 1 bidding package .
21/09/2024 15:32
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Approving the Contractor Selection Plan for bidding packages under the budget estimate for providing pure drinking water to students in the 2024-2025 school year with 1 bidding package .
21/09/2024 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Procurement and installation of Camera system for Le Quy Don Secondary School .
- Winning bidder: HỘ KINH DOANH THƯƠNG MẠI DỊCH VỤ THANH ĐỨC
28/11/2025 08:49
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Procurement and installation of Camera system for Le Quy Don Secondary School with 1 bidding package .
17/11/2025 10:11
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Shopping for meals .
- Winning bidder: Công ty TNHH Thương mại và Dịch vụ Thành Anh
04/09/2025 17:16
TRƯỜNG THCS LÊ QUÝ ĐÔN announced the results of the bid package Shopping for pure drinking water for students in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI VÀ DỊCH VỤ THẢO LINH
04/09/2025 17:05
Investor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted an investment and development project Buy meals for semi -boarding activities.
04/09/2025 16:16
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Shopping for pure drinking water for educational activities with 1 bidding package .
04/09/2025 10:53
TRƯỜNG THCS LÊ QUÝ ĐÔN publishes the plan Make a boarding board with 1 bidding package .
04/09/2025 10:45
The Bid solicitor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted the results of the bidding package Tender package No 01: Construction work of the investor TRƯỜNG THCS LÊ QUÝ ĐÔN.
- Winning bidder: Công ty cổ phần xây dựng thương mại và dịch vụ Hải Anh
11/11/2024 16:09
The Bid solicitor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted the request Le Quy Don Secondary School, Kien Xuong district; Category: School yard renovation of the investor TRƯỜNG THCS LÊ QUÝ ĐÔN with 1 bidding package.
11/11/2024 15:49
Investor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted an investment and development project Renovating the school yard.
11/11/2024 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS LÊ QUÝ ĐÔN has posted 3 of the contractor selection plan, which contains 3 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG THCS LÊ QUÝ ĐÔN has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS LÊ QUÝ ĐÔN has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS LÊ QUÝ ĐÔN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects