Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS LƯƠNG ĐIỀN as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 7 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,840,000 VND, of which the total winning bid value is: 9,840,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS LƯƠNG ĐIỀN as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,840,000 VND, in which the total winning value is: 9,840,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS LƯƠNG ĐIỀN are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 3 contractor selection plans, of which 2 were self-published, and 1 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package No. 01: Construction project management consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG HẢI NAM
25/11/2025 10:19
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package No. 3: Construction + Supply and installation of construction equipment: Renovation, repair of roofs and procurement of learning equipment for Luong Dien Secondary School .
- Winning bidder: HP MINH NGHIA COMPANY LIMITED
21/11/2025 15:16
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package No. 02: Consulting on construction supervision + equipment installation .
- Winning bidder: CÔNG TY TNHH ITF GROUP
21/11/2025 15:12
TRƯỜNG THCS LƯƠNG ĐIỀN publishes the plan Project contractor selection plan: Renovation, roof repair and procurement of learning equipment for Luong Dien Secondary School with 3 bidding package .
21/11/2025 15:07
The Bid solicitor CÔNG TY TNHH QUANG MINH TMT has posted the results of the bidding package Package No. 3: Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: HP MINH NGHIA COMPANY LIMITED
28/12/2024 15:40
Bid solicitor CÔNG TY TNHH QUANG MINH TMT has posted Tender Notice Tender package No 3: Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School of the investor TRƯỜNG THCS LƯƠNG ĐIỀN with the form Competitive Offer.
30/11/2024 15:02
The Bid solicitor TRƯỜNG THCS LƯƠNG ĐIỀN has posted the results of the bidding package Bidding package 1: Consulting on making bidding documents, evaluating bids of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: CÔNG TY TNHH QUANG MINH TMT
28/11/2024 17:10
The Bid solicitor TRƯỜNG THCS LƯƠNG ĐIỀN has posted the request Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School of the investor TRƯỜNG THCS LƯƠNG ĐIỀN with 3 bidding package.
28/11/2024 17:07
The Bid solicitor HAI DUONG PLANNING AND CONSTRUCTION DESIGNING CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Repair of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: THANH DONG TRADING AND CONSTRUCTION SERVICE JOINT STOCK COMPANY
25/12/2023 20:59
The Bid solicitor HAI DUONG PLANNING AND CONSTRUCTION DESIGNING CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Procurement + installation of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: THANH DONG TRADING AND CONSTRUCTION SERVICE JOINT STOCK COMPANY
25/12/2023 20:52
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package Bidding package 1: Consulting on making bidding documents, evaluating bids .
- Winning bidder: CÔNG TY TNHH QUANG MINH TMT
28/11/2024 17:10
TRƯỜNG THCS LƯƠNG ĐIỀN publishes the plan Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School with 3 bidding package .
28/11/2024 17:07
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package Appraisal of application documents and appraisal of LCNT . results .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN – XÂY DỰNG T&T
09/12/2023 08:02
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package Consulting on preparation of Bid Documents and evaluation of bids .
- Winning bidder: HAI DUONG PLANNING AND CONSTRUCTION DESIGNING CONSULTING JOINT STOCK COMPANY
09/12/2023 08:01
TRƯỜNG THCS LƯƠNG ĐIỀN publishes the plan Repairing 2-storey 10-room classroom building + purchasing teaching equipment for Luong Dien Secondary School with 4 bidding package .
09/12/2023 07:58
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package No. 01: Construction project management consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG HẢI NAM
25/11/2025 10:19
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package No. 3: Construction + Supply and installation of construction equipment: Renovation, repair of roofs and procurement of learning equipment for Luong Dien Secondary School .
- Winning bidder: HP MINH NGHIA COMPANY LIMITED
21/11/2025 15:16
TRƯỜNG THCS LƯƠNG ĐIỀN announced the results of the bid package No. 02: Consulting on construction supervision + equipment installation .
- Winning bidder: CÔNG TY TNHH ITF GROUP
21/11/2025 15:12
TRƯỜNG THCS LƯƠNG ĐIỀN publishes the plan Project contractor selection plan: Renovation, roof repair and procurement of learning equipment for Luong Dien Secondary School with 3 bidding package .
21/11/2025 15:07
The Bid solicitor CÔNG TY TNHH QUANG MINH TMT has posted the results of the bidding package Package No. 3: Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: HP MINH NGHIA COMPANY LIMITED
28/12/2024 15:40
Bid solicitor CÔNG TY TNHH QUANG MINH TMT has posted Tender Notice Tender package No 3: Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School of the investor TRƯỜNG THCS LƯƠNG ĐIỀN with the form Competitive Offer.
30/11/2024 15:02
The Bid solicitor TRƯỜNG THCS LƯƠNG ĐIỀN has posted the results of the bidding package Bidding package 1: Consulting on making bidding documents, evaluating bids of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: CÔNG TY TNHH QUANG MINH TMT
28/11/2024 17:10
The Bid solicitor TRƯỜNG THCS LƯƠNG ĐIỀN has posted the request Procurement of equipment and pouring concrete around the stadium for Luong Dien Secondary School of the investor TRƯỜNG THCS LƯƠNG ĐIỀN with 3 bidding package.
28/11/2024 17:07
The Bid solicitor HAI DUONG PLANNING AND CONSTRUCTION DESIGNING CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Repair of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: THANH DONG TRADING AND CONSTRUCTION SERVICE JOINT STOCK COMPANY
25/12/2023 20:59
The Bid solicitor HAI DUONG PLANNING AND CONSTRUCTION DESIGNING CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Procurement + installation of the investor TRƯỜNG THCS LƯƠNG ĐIỀN.
- Winning bidder: THANH DONG TRADING AND CONSTRUCTION SERVICE JOINT STOCK COMPANY
25/12/2023 20:52
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS LƯƠNG ĐIỀN has posted 2 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG THCS LƯƠNG ĐIỀN has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS LƯƠNG ĐIỀN has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS LƯƠNG ĐIỀN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects