Data analysis results of DauThau.info software for bid solicitors Trường THCS Minh Hải as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 9 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,268,134,000 VND, of which the total winning bid value is: 2,264,751,945 VND.
- The savings rate is: 0.15%.
Data analysis results of DauThau.info software for bid solicitors Trường THCS Minh Hải as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,268,134,000 VND, in which the total winning value is: 2,264,751,945 VND.
- The savings rate is: 0.15%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THCS Minh Hải are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 6 contractor selection plans, of which 4 were self-published, and 2 were published by other entities.
- Is the investor of 2 Tender Notices, of which 1 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THCS Minh Hải announced the results of the bid package Package No. 02: Procurement of facilities for Minh Hai Secondary School .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Trà
25/03/2026 14:46
Trường THCS Minh Hải publishes the plan Estimated contractor selection plan: Procurement of facilities for Minh Hai Secondary School in 2026 with 1 bidding package .
25/03/2026 14:35
Trường THCS Minh Hải announced the results of the bid package Package No. 01: Procurement of facilities for Minh Hai Secondary School .
- Winning bidder: Hộ kinh doanh Nguyễn Đức Hoàng
20/03/2026 10:51
Trường THCS Minh Hải publishes the plan Estimated contractor selection plan: Procurement of facilities for Minh Hai Secondary School in 2026 with 1 bidding package .
20/03/2026 10:32
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package GS Consulting of the investor Trường THCS Minh Hải.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NTP
24/06/2025 18:54
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package Project Management Consulting of the investor Trường THCS Minh Hải.
- Winning bidder: PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED
24/06/2025 18:51
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package Civil Works of the investor Trường THCS Minh Hải.
- Winning bidder: HOANG MAI TRADING - SERVICE AND CONSTRUCTION JOINT STOCK COMPANY
24/06/2025 18:49
The Bid solicitor Trường THCS Minh Hải has posted the request Plan to select the construction contractor of the project: Repair and replace the door of the 3 -storey set of house, the roof of the outdoor training ground of the investor Trường THCS Minh Hải with 4 bidding package.
24/06/2025 18:45
Investor Trường THCS Minh Hải has posted an investment and development project Repair and replace the door of the 3 -storey house, the roof of the outdoor training ground.
24/06/2025 18:18
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package Package No. 1: Construction work of the investor Trường THCS Minh Hải.
- Winning bidder: TAI PHAT UNITED CONSTRUCTION COMPANY LIMITED
09/08/2024 10:50
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THCS Minh Hải announced the results of the bid package GS Consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NTP
24/06/2025 18:54
Trường THCS Minh Hải announced the results of the bid package Project Management Consulting .
- Winning bidder: PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED
24/06/2025 18:51
Trường THCS Minh Hải announced the results of the bid package Civil Works .
- Winning bidder: HOANG MAI TRADING - SERVICE AND CONSTRUCTION JOINT STOCK COMPANY
24/06/2025 18:49
Trường THCS Minh Hải publishes the plan Plan to select the construction contractor of the project: Repair and replace the door of the 3 -storey set of house, the roof of the outdoor training ground with 4 bidding package .
24/06/2025 18:45
Trường THCS Minh Hải announced the results of the bid package Package No. 1: Construction work .
- Winning bidder: TAI PHAT UNITED CONSTRUCTION COMPANY LIMITED
09/08/2024 10:50
Trường THCS Minh Hải announced the results of the bidding package Tender package No 1: Construction work with 1 participating contractors .
26/07/2024 08:02
Trường THCS Minh Hải publishes Tender Notice Tender package No 1: Construction work in the form Open bidding .
17/07/2024 14:59
Trường THCS Minh Hải publishes the plan Plan for selecting contractors for the project of renovating and repairing toilets at Minh Hai Secondary School with 5 bidding package .
17/07/2024 14:11
Trường THCS Minh Hải publishes the plan Plan for selecting contractors for the project of renovating and repairing toilets at Minh Hai Secondary School with 5 bidding package .
12/07/2024 14:52
Trường THCS Minh Hải publishes the plan Plan for selecting contractors for the project of renovating and repairing toilets at Minh Hai Secondary School with 5 bidding package .
11/06/2024 15:09
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THCS Minh Hải announced the results of the bid package Package No. 02: Procurement of facilities for Minh Hai Secondary School .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Trà
25/03/2026 14:46
Trường THCS Minh Hải publishes the plan Estimated contractor selection plan: Procurement of facilities for Minh Hai Secondary School in 2026 with 1 bidding package .
25/03/2026 14:35
Trường THCS Minh Hải announced the results of the bid package Package No. 01: Procurement of facilities for Minh Hai Secondary School .
- Winning bidder: Hộ kinh doanh Nguyễn Đức Hoàng
20/03/2026 10:51
Trường THCS Minh Hải publishes the plan Estimated contractor selection plan: Procurement of facilities for Minh Hai Secondary School in 2026 with 1 bidding package .
20/03/2026 10:32
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package GS Consulting of the investor Trường THCS Minh Hải.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NTP
24/06/2025 18:54
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package Project Management Consulting of the investor Trường THCS Minh Hải.
- Winning bidder: PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED
24/06/2025 18:51
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package Civil Works of the investor Trường THCS Minh Hải.
- Winning bidder: HOANG MAI TRADING - SERVICE AND CONSTRUCTION JOINT STOCK COMPANY
24/06/2025 18:49
The Bid solicitor Trường THCS Minh Hải has posted the request Plan to select the construction contractor of the project: Repair and replace the door of the 3 -storey set of house, the roof of the outdoor training ground of the investor Trường THCS Minh Hải with 4 bidding package.
24/06/2025 18:45
Investor Trường THCS Minh Hải has posted an investment and development project Repair and replace the door of the 3 -storey house, the roof of the outdoor training ground.
24/06/2025 18:18
The Bid solicitor Trường THCS Minh Hải has posted the results of the bidding package Package No. 1: Construction work of the investor Trường THCS Minh Hải.
- Winning bidder: TAI PHAT UNITED CONSTRUCTION COMPANY LIMITED
09/08/2024 10:50
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường THCS Minh Hải has posted 4 of the contractor selection plan, which contains 9 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường THCS Minh Hải has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THCS Minh Hải has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường THCS Minh Hải has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THCS Minh Hải has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THCS Minh Hải has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects