Data analysis results of DauThau.info software for bid solicitors Trường THCS Quang Vinh as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường THCS Quang Vinh as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THCS Quang Vinh are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 6 contractor selection plans, of which 0 were self-published, and 6 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THCS Quang Vinh announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN ĐT XÂY DỰNG VÀ THƯƠNG MẠI THÁI DƯƠNG
20/03/2026 15:04
Trường THCS Quang Vinh announced the results of the bid package Construction and installation works: Renovating and repairing the door system of a 2-story, 6-room classroom and outdoor library at Quang Vinh Secondary School .
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN XÂY DỰNG HOÀNG NAM
20/03/2026 15:00
Trường THCS Quang Vinh publishes the plan Renovating and repairing the door system of the 2-story, 6-room classroom and outdoor library at Quang Vinh Secondary School with 2 bidding package .
20/03/2026 14:57
Investor Trường THCS Quang Vinh has posted an investment and development project Renovating and repairing the door system of the 2-story, 6-room classroom and outdoor library at Quang Vinh Secondary School.
20/03/2026 14:14
Trường THCS Quang Vinh announced the results of the bid package Consulting on preparing an economic - technical report for the project: Renovating and repairing the door system of a 2-story, 6-room classroom and outdoor library at Quang Vinh Secondary School .
- Winning bidder: KLC CONSULTANCY AND CONSTRUCTION COMPANY LIMITED
13/03/2026 10:51
Trường THCS Quang Vinh publishes the plan Contractor selection plan for consulting package for preparation of Economic - Technical Report Project: Renovating and repairing the door system of a 2-story, 6-room classroom and outdoor library at Quang Vinh Secondary School with 1 bidding package .
13/03/2026 10:46
Trường THCS Quang Vinh announced the results of the bid package Services for organizing the Study Tour and practical experience program at the Vietnam Military History Museum - Suoi Tien Green Cabin Experience Area .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI DU LỊCH VIỆT Á THÁI NGUYÊN
16/01/2026 16:07
Trường THCS Quang Vinh publishes the plan Services for organizing the Study Tour and practical experience program at the Vietnam Military History Museum - Suoi Tien Green Cabin Experience Area with 1 bidding package .
16/01/2026 15:58
Trường THCS Quang Vinh announced the results of the bid package Procurement of books and teaching equipment to serve teaching and learning at Quang Vinh Secondary School in 2025 .
- Winning bidder: CÔNG TY CỔ PHẦN SÁCH VÀ THIẾT BỊ TRƯỜNG HỌC THÁI NGUYÊN
06/12/2025 09:45
Trường THCS Quang Vinh publishes the plan Procurement of books and teaching equipment to serve teaching and learning at Quang Vinh Secondary School in 2025 with 1 bidding package .
06/12/2025 09:16
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THCS Quang Vinh has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THCS Quang Vinh has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects