Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS QUỲNH VĂN as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 4 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 246,346,000 VND, of which the total winning bid value is: 246,346,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS QUỲNH VĂN as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 246,346,000 VND, in which the total winning value is: 246,346,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS QUỲNH VĂN are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 3 contractor selection plans, of which 2 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS QUỲNH VĂN announced the results of the bid package Procurement of desks and chairs for secondary school students to serve their studies .
- Winning bidder: CÔNG TY TNHH SAN XUAT VA XAY DUNG DAI DUNG
08/07/2026 07:08
TRƯỜNG THCS QUỲNH VĂN publishes the plan Procurement of desks and chairs for secondary school students to serve their studies with 1 bidding package .
04/07/2026 21:50
Investor TRƯỜNG THCS QUỲNH VĂN has posted an investment and development project Procurement of desks and chairs for secondary school students to serve their studies.
04/07/2026 21:21
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Package No. 01: The whole construction part of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: CÔNG TY CP VẬN TẢI VÀ XÂY DỰNG LONG HOÀNG HÀ
27/09/2023 09:59
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: Công ty TNHH Anh Nhân Ngọc
25/09/2023 15:51
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Tender package No 02: Project Management Consulting of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: MINH NHAN ARCHITECTURE AND CONSTRUCTION COMPANY LIMITED
25/09/2023 15:48
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the request Student parking garage at Quynh Van Secondary School. of the investor TRƯỜNG THCS QUỲNH VĂN with 3 bidding package.
22/09/2023 07:56
Investor TRƯỜNG THCS QUỲNH VĂN has posted an investment and development project Student parking garage at Quynh Van Secondary School..
22/09/2023 07:07
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Consulting on surveying and preparing economic - technical reports for the project: Garage for students at Quynh Van Secondary School of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: MINH NHAN ARCHITECTURE AND CONSTRUCTION COMPANY LIMITED
08/09/2023 10:26
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the request Contractor selection plan Consulting on surveying and preparing economic - technical reports for the project: Student parking garage at Quynh Van Secondary School of the investor TRƯỜNG THCS QUỲNH VĂN with 1 bidding package.
06/09/2023 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS QUỲNH VĂN announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY CP VẬN TẢI VÀ XÂY DỰNG LONG HOÀNG HÀ
27/09/2023 09:59
TRƯỜNG THCS QUỲNH VĂN announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: Công ty TNHH Anh Nhân Ngọc
25/09/2023 15:51
TRƯỜNG THCS QUỲNH VĂN announced the results of the bid package Tender package No 02: Project Management Consulting .
- Winning bidder: MINH NHAN ARCHITECTURE AND CONSTRUCTION COMPANY LIMITED
25/09/2023 15:48
TRƯỜNG THCS QUỲNH VĂN publishes the plan Student parking garage at Quynh Van Secondary School. with 3 bidding package .
22/09/2023 07:56
TRƯỜNG THCS QUỲNH VĂN announced the results of the bid package Consulting on surveying and preparing economic - technical reports for the project: Garage for students at Quynh Van Secondary School .
- Winning bidder: MINH NHAN ARCHITECTURE AND CONSTRUCTION COMPANY LIMITED
08/09/2023 10:26
TRƯỜNG THCS QUỲNH VĂN publishes the plan Contractor selection plan Consulting on surveying and preparing economic - technical reports for the project: Student parking garage at Quynh Van Secondary School with 1 bidding package .
06/09/2023 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS QUỲNH VĂN announced the results of the bid package Procurement of desks and chairs for secondary school students to serve their studies .
- Winning bidder: CÔNG TY TNHH SAN XUAT VA XAY DUNG DAI DUNG
08/07/2026 07:08
TRƯỜNG THCS QUỲNH VĂN publishes the plan Procurement of desks and chairs for secondary school students to serve their studies with 1 bidding package .
04/07/2026 21:50
Investor TRƯỜNG THCS QUỲNH VĂN has posted an investment and development project Procurement of desks and chairs for secondary school students to serve their studies.
04/07/2026 21:21
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Package No. 01: The whole construction part of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: CÔNG TY CP VẬN TẢI VÀ XÂY DỰNG LONG HOÀNG HÀ
27/09/2023 09:59
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: Công ty TNHH Anh Nhân Ngọc
25/09/2023 15:51
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Tender package No 02: Project Management Consulting of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: MINH NHAN ARCHITECTURE AND CONSTRUCTION COMPANY LIMITED
25/09/2023 15:48
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the request Student parking garage at Quynh Van Secondary School. of the investor TRƯỜNG THCS QUỲNH VĂN with 3 bidding package.
22/09/2023 07:56
Investor TRƯỜNG THCS QUỲNH VĂN has posted an investment and development project Student parking garage at Quynh Van Secondary School..
22/09/2023 07:07
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the results of the bidding package Consulting on surveying and preparing economic - technical reports for the project: Garage for students at Quynh Van Secondary School of the investor TRƯỜNG THCS QUỲNH VĂN.
- Winning bidder: MINH NHAN ARCHITECTURE AND CONSTRUCTION COMPANY LIMITED
08/09/2023 10:26
The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted the request Contractor selection plan Consulting on surveying and preparing economic - technical reports for the project: Student parking garage at Quynh Van Secondary School of the investor TRƯỜNG THCS QUỲNH VĂN with 1 bidding package.
06/09/2023 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS QUỲNH VĂN has posted 2 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS QUỲNH VĂN has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS QUỲNH VĂN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects