Data analysis results of DauThau.info software for bid solicitors Trường THCS Sa Lý as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường THCS Sa Lý as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THCS Sa Lý are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 2 contractor selection plans, of which 0 were self-published, and 2 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THCS Sa Lý announced the results of the bid package Approving the results of contractor selection for package No. 05: Construction supervision consultancy: Construction and repair of school gate gate, Sa Ly Secondary School .
- Winning bidder: Công ty TNHH một thành viên Ngọc Trang
15/05/2026 08:40
Trường THCS Sa Lý announced the results of the bid package Approving the results of contractor selection for package No. 04: Construction work: Construction and repair of school gate gate, Sa Ly Secondary School .
- Winning bidder: CÔNG TY TNHH VĂN LƯƠNG
15/05/2026 08:33
Trường THCS Sa Lý publishes the plan Approve the contractor selection plan for the project: Construction and repair of school gate gates, Sa Ly Secondary School with 2 bidding package .
15/05/2026 08:28
Investor Trường THCS Sa Lý has posted an investment and development project Approval of the design of the school gate - project estimate: Construction and repair of the school gate gate, Sa Ly Secondary School.
15/05/2026 08:08
Trường THCS Sa Lý announced the results of the bid package Approving the results of contractor selection for package No. 03: Consulting on verifying the design of physical protection and project estimates: Construction and repair of school gate gates, Sa Ly Secondary School .
- Winning bidder: Công ty TNHH tư vấn đầu tư xây dựng TGK
06/05/2026 13:50
Trường THCS Sa Lý announced the results of the bid package Approve the results of contractor selection for package No. 02: Survey consulting, preparation of Technical and Technical Report Project: Construction and repair of school gate gate, Sa Ly Secondary School .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ TƯ VẤN XÂY DỰNG HÙNG CƯỜNG
06/05/2026 13:47
Trường THCS Sa Lý announced the results of the bid package Approve the results of contractor selection for package No. 01: Construction project management consulting. Under the project: Construction and repair of school gate rims, Sa Ly Secondary School .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ TƯ VẤN ĐẦU TƯ XÂY DỰNG ĐẠI PHONG
06/05/2026 13:44
Trường THCS Sa Lý publishes the plan Approval of the Contractor Selection Plan for a number of packages in the project investment preparation phase: Construction of guardrails, gate pillars, yard foundation, Sa Ly Secondary School with 3 bidding package .
06/05/2026 13:38
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects