Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS TIÊN LỮ as follows:
- Has relationships with 1 project owners.
- Has relationships with 17 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 24 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,943,195,000 VND, of which the total winning bid value is: 1,870,795,000 VND.
- The savings rate is: 3.73%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THCS TIÊN LỮ as follows:
- Has relationships with 17 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,943,195,000 VND, in which the total winning value is: 1,870,795,000 VND.
- The savings rate is: 3.73%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THCS TIÊN LỮ are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 17 contractor selection plans, of which 11 were self-published, and 6 were published by other entities.
- Is the investor of 3 Tender Notices, of which 1 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THCS TIÊN LỮ publishes the plan Contractor selection plan for the repair and maintenance of yard roof, electrical system and some auxiliary items at Tien Lu Secondary School, Hoang Hoa Tham commune with 3 bidding package .
29/07/2026 10:50
Investor TRƯỜNG THCS TIÊN LỮ has posted an investment and development project Repair and maintenance of yard roof, electrical system and some auxiliary items at Tien Lu Secondary School, Hoang Hoa Tham commune.
29/07/2026 10:10
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Consultancy for verification of economic - technical reports .
- Winning bidder: Công ty TNHH đầu tư xây dựng NEXBUILD
15/07/2026 09:45
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
15/07/2026 09:44
TRƯỜNG THCS TIÊN LỮ publishes the plan Contractor selection plan for the investment preparation phase Repair and maintenance of yard roof, electrical system and some auxiliary items at Tien Lu Secondary School, Hoang Hoa Tham commune with 2 bidding package .
03/07/2026 16:22
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Repair and maintenance of parking sheds for students and auxiliary items .
- Winning bidder: HỘ KINH DOANH NỘI THẤT QUANG TRANG
29/05/2026 15:10
TRƯỜNG THCS TIÊN LỮ publishes the plan The Decision approves the contractor selection plan with 1 bidding package .
29/05/2026 14:52
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Providing equipment, teaching and learning aids, student desks and chairs for Tien Lu Secondary School .
- Winning bidder: Hộ kinh doanh thiết bị nội thất 289
24/02/2026 20:58
TRƯỜNG THCS TIÊN LỮ publishes the plan Providing equipment, teaching and learning aids, student desks and chairs for Tien Lu Secondary School with 1 bidding package .
11/02/2026 19:36
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Providing leadership desks, chairs, filing cabinets, and photocopiers for Tien Lu Secondary School .
- Winning bidder: HỘ KINH DOANH TRUNG TÂM THIẾT BỊ VĂN PHÒNG MOSA
05/12/2025 20:57
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Construction of repair and maintenance of auxiliary items of Tien Lu Secondary School .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG MẠNH ĐẠT - MD
08/05/2025 08:21
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Construction supervision consultant .
- Winning bidder: AN VIEN PHAT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
08/05/2025 08:20
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Project management consultancy .
- Winning bidder: KIM PHU KHANG COMPANY LIMITED
08/05/2025 08:20
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Supply additional desktop computer, tables and chairs and accessories connected to Tien Lu Secondary School .
- Winning bidder: HỘ KINH DOANH TRUNG TÂM THIẾT BỊ VĂN PHÒNG MOSA
06/05/2025 11:25
TRƯỜNG THCS TIÊN LỮ publishes the plan Supply additional desktop computer, tables and chairs and accessories connected to Tien Lu Secondary School with 1 bidding package .
06/05/2025 11:22
TRƯỜNG THCS TIÊN LỮ publishes the plan Plan for selecting contractors for repairing and maintaining auxiliary items of Tien Lu Secondary School with 3 bidding package .
05/05/2025 14:47
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Bidding package for construction supervision consultancy .
- Winning bidder: PHU HUNG 2589 CONSTRUCTION CONSULTATION COMPANY LIMITED
03/05/2025 10:33
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Tender package for construction work .
- Winning bidder: SONG HONG HY668 COMPANY LIMITED
03/05/2025 10:30
TRƯỜNG THCS TIÊN LỮ publishes the plan Repair and maintenance of 2 -storey classrooms in Tien Lu Secondary School with 2 bidding package .
03/05/2025 10:28
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Package No. 3: Strengthening facilities at Tien Lu Secondary School in 2024 .
- Winning bidder: PHUC HUNG TECHNOLOGY AND TRADING COMPANY LIMITED
02/12/2024 20:33
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THCS TIÊN LỮ publishes the plan Contractor selection plan for the repair and maintenance of yard roof, electrical system and some auxiliary items at Tien Lu Secondary School, Hoang Hoa Tham commune with 3 bidding package .
29/07/2026 10:50
Investor TRƯỜNG THCS TIÊN LỮ has posted an investment and development project Repair and maintenance of yard roof, electrical system and some auxiliary items at Tien Lu Secondary School, Hoang Hoa Tham commune.
29/07/2026 10:10
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Consultancy for verification of economic - technical reports .
- Winning bidder: Công ty TNHH đầu tư xây dựng NEXBUILD
15/07/2026 09:45
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Consulting on Preparation of Finance and Technical Report .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
15/07/2026 09:44
TRƯỜNG THCS TIÊN LỮ publishes the plan Contractor selection plan for the investment preparation phase Repair and maintenance of yard roof, electrical system and some auxiliary items at Tien Lu Secondary School, Hoang Hoa Tham commune with 2 bidding package .
03/07/2026 16:22
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Repair and maintenance of parking sheds for students and auxiliary items .
- Winning bidder: HỘ KINH DOANH NỘI THẤT QUANG TRANG
29/05/2026 15:10
TRƯỜNG THCS TIÊN LỮ publishes the plan The Decision approves the contractor selection plan with 1 bidding package .
29/05/2026 14:52
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Providing equipment, teaching and learning aids, student desks and chairs for Tien Lu Secondary School .
- Winning bidder: Hộ kinh doanh thiết bị nội thất 289
24/02/2026 20:58
TRƯỜNG THCS TIÊN LỮ publishes the plan Providing equipment, teaching and learning aids, student desks and chairs for Tien Lu Secondary School with 1 bidding package .
11/02/2026 19:36
TRƯỜNG THCS TIÊN LỮ announced the results of the bid package Providing leadership desks, chairs, filing cabinets, and photocopiers for Tien Lu Secondary School .
- Winning bidder: HỘ KINH DOANH TRUNG TÂM THIẾT BỊ VĂN PHÒNG MOSA
05/12/2025 20:57
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THCS TIÊN LỮ has posted 11 of the contractor selection plan, which contains 24 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRƯỜNG THCS TIÊN LỮ has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS TIÊN LỮ has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THCS TIÊN LỮ has a relationship with 17 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THCS TIÊN LỮ has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THCS TIÊN LỮ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects