Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THPT QUỲNH CÔI as follows:
- Has relationships with 1 project owners.
- Has relationships with 17 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 22 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 19 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,397,775,092 VND, of which the total winning bid value is: 1,314,075,092 VND.
- The savings rate is: 5.99%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG THPT QUỲNH CÔI as follows:
- Has relationships with 17 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,397,775,092 VND, in which the total winning value is: 1,314,075,092 VND.
- The savings rate is: 5.99%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG THPT QUỲNH CÔI are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 25 contractor selection plans, of which 12 were self-published, and 13 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Contractor selection plan Organizing summer field study activities in Cat Ba - Lan Ha Bay - Hai Phong .
- Winning bidder: ALO TOUR INTERNATIONAL JOINT STOCK COMPANY
25/06/2026 14:54
TRƯỜNG THPT QUỲNH CÔI publishes the plan Contractor selection plan Organizing summer field study activities in Cat Ba - Lan Ha Bay - Hai Phong with 1 bidding package .
25/06/2026 14:41
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Construction and installation of corrugated iron roofs for student parking sheds behind house C - Quynh Coi High School .
- Winning bidder: TUYET HAO CONSTRUCTION COMPANY LIMITED
05/06/2026 14:48
TRƯỜNG THPT QUỲNH CÔI publishes the plan Project contractor selection plan: Construction and installation of corrugated iron roof for student parking shed behind house C - Quynh Coi High School with 1 bidding package .
05/06/2026 14:44
TRƯỜNG THPT QUỲNH CÔI publishes the plan Project contractor selection plan: Construction and installation of corrugated iron roof for student parking shed behind house C - Quynh Coi High School with 1 bidding package .
05/06/2026 14:39
TRƯỜNG THPT QUỲNH CÔI publishes the plan Project contractor selection plan: Construction and installation of corrugated iron roof for student parking shed behind house C - Quynh Coi High School with 1 bidding package .
04/06/2026 16:44
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package No. 05: Supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG DELTA
14/05/2026 09:08
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: Công ty TNHH Kiến trúc và Xây dựng Bắc Âu
14/05/2026 09:06
TRƯỜNG THPT QUỲNH CÔI publishes the plan Plan for selecting contractors for project packages: Repainting the walls and doors of Quynh Coi High School with 2 bidding package .
14/05/2026 09:03
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package 03: Project Management Consulting .
- Winning bidder: VIET NAM VTA PROJECT MANAGEMENT JOINT STOCK COPANY
05/05/2026 08:18
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package 07: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT KẾ THĂNG LONG
30/05/2025 08:08
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package 06: Project management consulting .
- Winning bidder: VIET NAM VTA PROJECT MANAGEMENT JOINT STOCK COPANY
30/05/2025 08:03
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package No. 04: Consulting on evaluation of Bidding Documents, Evaluation of contractor selection results (Package No. 05) .
- Winning bidder: Công ty TNHH Kiến trúc và Xây dựng Bắc Âu
26/04/2025 12:46
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package No. 03: Consulting on making bidding doctors, evaluating Bids (Package No. 05: Construction construction) .
- Winning bidder: VIET NAM VTA PROJECT MANAGEMENT JOINT STOCK COPANY
26/04/2025 12:44
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package No. 02: Consultancy for verification of design and cost estimate .
- Winning bidder: CÔNG TY TNHH KIẾN TRÚC VÀ NỘI THẤT Ý TƯỞNG MỚI
26/04/2025 12:42
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package No. 01: Consultancy on setting up BVTC design and cost estimate .
- Winning bidder: Công ty cổ phần tư vấn thiết kế xây dựng và kinh doanh thương mại TH
26/04/2025 12:40
TRƯỜNG THPT QUỲNH CÔI publishes the plan Statistics of contractor selection of project bidding packages: Repairing sanitation works; Student at Quynh Coi High School with 5 bidding package .
26/04/2025 12:35
TRƯỜNG THPT QUỲNH CÔI publishes the plan Plan for contractor selection phase preparation for construction investment: Repairing sanitation works; Student at Quynh Coi High School with 2 bidding package .
26/04/2025 12:22
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Hire a service to provide alkaline hydrogen drinking water at the tap for students in 2025 .
- Winning bidder: Công ty CP tập đoàn đầu tư quốc tế Nhật Minh
24/01/2025 14:29
TRƯỜNG THPT QUỲNH CÔI publishes the plan Hire a service to provide alkaline hydrogen drinking water at the tap for students in 2025 with 1 bidding package .
18/01/2025 16:26
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Contractor selection plan Organizing summer field study activities in Cat Ba - Lan Ha Bay - Hai Phong .
- Winning bidder: ALO TOUR INTERNATIONAL JOINT STOCK COMPANY
25/06/2026 14:54
TRƯỜNG THPT QUỲNH CÔI publishes the plan Contractor selection plan Organizing summer field study activities in Cat Ba - Lan Ha Bay - Hai Phong with 1 bidding package .
25/06/2026 14:41
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Construction and installation of corrugated iron roofs for student parking sheds behind house C - Quynh Coi High School .
- Winning bidder: TUYET HAO CONSTRUCTION COMPANY LIMITED
05/06/2026 14:48
TRƯỜNG THPT QUỲNH CÔI publishes the plan Project contractor selection plan: Construction and installation of corrugated iron roof for student parking shed behind house C - Quynh Coi High School with 1 bidding package .
05/06/2026 14:44
TRƯỜNG THPT QUỲNH CÔI publishes the plan Project contractor selection plan: Construction and installation of corrugated iron roof for student parking shed behind house C - Quynh Coi High School with 1 bidding package .
05/06/2026 14:39
TRƯỜNG THPT QUỲNH CÔI publishes the plan Project contractor selection plan: Construction and installation of corrugated iron roof for student parking shed behind house C - Quynh Coi High School with 1 bidding package .
04/06/2026 16:44
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package No. 05: Supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG DELTA
14/05/2026 09:08
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: Công ty TNHH Kiến trúc và Xây dựng Bắc Âu
14/05/2026 09:06
TRƯỜNG THPT QUỲNH CÔI publishes the plan Plan for selecting contractors for project packages: Repainting the walls and doors of Quynh Coi High School with 2 bidding package .
14/05/2026 09:03
TRƯỜNG THPT QUỲNH CÔI announced the results of the bid package Package 03: Project Management Consulting .
- Winning bidder: VIET NAM VTA PROJECT MANAGEMENT JOINT STOCK COPANY
05/05/2026 08:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG THPT QUỲNH CÔI has posted 12 of the contractor selection plan, which contains 22 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG THPT QUỲNH CÔI has posted 19 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 19 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG THPT QUỲNH CÔI has a relationship with 17 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG THPT QUỲNH CÔI has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects