Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường THPT Sơn Động số 3 as follows:
- Has relationships with 2 project owners.
- Has relationships with 8 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 14 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 11 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,765,260,000 VND, of which the total winning bid value is: 2,479,324,000 VND.
- The savings rate is: 10.34%.
Data analysis results of DauThau.info software for bid solicitors Trường THPT Sơn Động số 3 as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,765,260,000 VND, in which the total winning value is: 2,479,324,000 VND.
- The savings rate is: 10.34%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường THPT Sơn Động số 3 are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 7 contractor selection plans, of which 4 were self-published, and 3 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường THPT Sơn Động số 3 publishes the plan Plan for selecting contractors for a number of bidding packages Consulting on the investment preparation phase of construction work: Renovating and repairing Son Dong High School No. 3. Categories: Toilets in the classroom building, toilets in the administrative building and school grounds with 3 bidding package .
30/06/2026 17:35
Trường THPT Sơn Động số 3 announced the results of the bid package Construction supervision .
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
06/12/2025 09:27
Trường THPT Sơn Động số 3 announced the results of the bid package Construction .
- Winning bidder: CUONG THUY BUILDING AND TM COMPANY LIMITED
06/12/2025 09:21
Trường THPT Sơn Động số 3 publishes the plan Decision to approve the contractor selection plan for the project: Repair and rebuild collapsed fence, waste storage house, pump house at Son Dong High School No. 3 with 2 bidding package .
04/12/2025 15:36
Trường THPT Sơn Động số 3 announced the results of the bid package Decision approving the results of contractor selection for the consulting package to verify the TKTC-DT drawings for construction works: Repair and rebuild collapsed fence walls, waste storage house, pump house at Son Dong High School No. 3 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT THIẾT KẾ VÀ XÂY DỰNG HOÀNG DƯƠNG
24/11/2025 10:35
Trường THPT Sơn Động số 3 announced the results of the bid package Decision to approve the Plan to select a consulting contractor to prepare construction design drawings - Project estimate: Repair and rebuild collapsed fence, waste storage house, pump house at Son Dong High School No. 3 .
- Winning bidder: Công ty cổ phần thiết kế xây dựng Thành Đông
14/11/2025 16:30
Trường THPT Sơn Động số 3 publishes the plan Decision to approve the LCNT Plan for the consulting package to prepare construction design drawings - Project estimate: Repair and rebuild collapsed fence, waste storage house, water pump house at Son Dong High School No. 3 with 1 bidding package .
12/11/2025 09:19
The Bid solicitor Trường THPT Sơn Động số 3 has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor Trường THPT Sơn Động số 3.
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
16/05/2025 09:25
The Bid solicitor Trường THPT Sơn Động số 3 has posted the results of the bidding package Tender package No 02: Construction work of the investor Trường THPT Sơn Động số 3.
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT THIẾT KẾ VÀ XÂY DỰNG HOÀNG DƯƠNG
16/05/2025 09:14
The Bid solicitor Trường THPT Sơn Động số 3 has posted the results of the bidding package Package No. 01 Project management consulting of the investor Trường THPT Sơn Động số 3.
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
16/05/2025 09:03
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THPT Sơn Động số 3 announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
16/05/2025 09:25
Trường THPT Sơn Động số 3 announced the results of the bid package Tender package No 02: Construction work .
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT THIẾT KẾ VÀ XÂY DỰNG HOÀNG DƯƠNG
16/05/2025 09:14
Trường THPT Sơn Động số 3 announced the results of the bid package Package No. 01 Project management consulting .
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
16/05/2025 09:03
Trường THPT Sơn Động số 3 publishes the plan Decision on approving the plan for project contractor selection: Repairing toilets and semi -boarding houses; pavement in front of the boarding house; rebuilding the fence of Son Dong High School No. 3 with 3 bidding package .
13/05/2025 09:46
Trường THPT Sơn Động số 3 announced the results of the bid package Repairing toilets, semi -boarding houses; pavement in front of the boarding house; rebuilding the fence of Son Dong High School No. 3 .
- Winning bidder: Công ty cổ phần thiết kế xây dựng Thành Đông
20/03/2025 09:43
Trường THPT Sơn Động số 3 publishes the plan Decision approving the plan of LCNT Bidding Package Survey Consulting, Economic and Technical Report on Construction Works: Repairing toilets and semi -boarding houses; pavement in front of the boarding house; rebuilding the fence of Son Dong High School No. 3 with 1 bidding package .
19/03/2025 16:06
Trường THPT Sơn Động số 3 announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: THANH PHONG CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
17/07/2024 10:58
Trường THPT Sơn Động số 3 announced the results of the bid package Tender package No 03: Construction .
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT THIẾT KẾ VÀ XÂY DỰNG HOÀNG DƯƠNG
09/07/2024 10:24
Trường THPT Sơn Động số 3 announced the results of the bidding package Tender package No 03: Construction with 2 participating contractors .
01/07/2024 10:01
Trường THPT Sơn Động số 3 publishes Tender Notice Tender package No 03: Construction in the form Competitive Offer .
24/06/2024 14:20
The data sheet has been partially hidden, to see the full information please Login or Register
Trường THPT Sơn Động số 3 publishes the plan Plan for selecting contractors for a number of bidding packages Consulting on the investment preparation phase of construction work: Renovating and repairing Son Dong High School No. 3. Categories: Toilets in the classroom building, toilets in the administrative building and school grounds with 3 bidding package .
30/06/2026 17:35
Trường THPT Sơn Động số 3 announced the results of the bid package Construction supervision .
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
06/12/2025 09:27
Trường THPT Sơn Động số 3 announced the results of the bid package Construction .
- Winning bidder: CUONG THUY BUILDING AND TM COMPANY LIMITED
06/12/2025 09:21
Trường THPT Sơn Động số 3 publishes the plan Decision to approve the contractor selection plan for the project: Repair and rebuild collapsed fence, waste storage house, pump house at Son Dong High School No. 3 with 2 bidding package .
04/12/2025 15:36
Trường THPT Sơn Động số 3 announced the results of the bid package Decision approving the results of contractor selection for the consulting package to verify the TKTC-DT drawings for construction works: Repair and rebuild collapsed fence walls, waste storage house, pump house at Son Dong High School No. 3 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT THIẾT KẾ VÀ XÂY DỰNG HOÀNG DƯƠNG
24/11/2025 10:35
Trường THPT Sơn Động số 3 announced the results of the bid package Decision to approve the Plan to select a consulting contractor to prepare construction design drawings - Project estimate: Repair and rebuild collapsed fence, waste storage house, pump house at Son Dong High School No. 3 .
- Winning bidder: Công ty cổ phần thiết kế xây dựng Thành Đông
14/11/2025 16:30
Trường THPT Sơn Động số 3 publishes the plan Decision to approve the LCNT Plan for the consulting package to prepare construction design drawings - Project estimate: Repair and rebuild collapsed fence, waste storage house, water pump house at Son Dong High School No. 3 with 1 bidding package .
12/11/2025 09:19
The Bid solicitor Trường THPT Sơn Động số 3 has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor Trường THPT Sơn Động số 3.
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
16/05/2025 09:25
The Bid solicitor Trường THPT Sơn Động số 3 has posted the results of the bidding package Tender package No 02: Construction work of the investor Trường THPT Sơn Động số 3.
- Winning bidder: CÔNG TY TNHH TƯ VẤN GIÁM SÁT THIẾT KẾ VÀ XÂY DỰNG HOÀNG DƯƠNG
16/05/2025 09:14
The Bid solicitor Trường THPT Sơn Động số 3 has posted the results of the bidding package Package No. 01 Project management consulting of the investor Trường THPT Sơn Động số 3.
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
16/05/2025 09:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường THPT Sơn Động số 3 has posted 5 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường THPT Sơn Động số 3 has posted 2 Tender Notices in 1 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THPT Sơn Động số 3 has posted 11 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 11 package, canceled the bid 0 package (among the bidding packages above).
- There are 9 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường THPT Sơn Động số 3 has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường THPT Sơn Động số 3 has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường THPT Sơn Động số 3 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects