Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường tiểu học Chiềng Nơi 2 as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 7 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường tiểu học Chiềng Nơi 2 as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường tiểu học Chiềng Nơi 2 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 7 contractor selection plans, of which 7 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Repair and upgrade toilet works of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 17:15
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Repairing the system of 2-storey classrooms of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 17:06
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Classroom and office equipment of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 17:02
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Stationery supplies for the last 8 months of 2018 of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 16:54
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Repair water locator, computer equipment, virus software of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
22/12/2017 09:12
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Frame of signs, slogans, letters of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
21/12/2017 16:34
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Professional stationery supplies for the year, Quarter IV/2017, Tea, office supplies of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
07/11/2017 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
Trường tiểu học Chiềng Nơi 2 publishes the plan Repair and upgrade toilet works with 1 bidding package .
05/05/2018 17:15
Trường tiểu học Chiềng Nơi 2 publishes the plan Repairing the system of 2-storey classrooms with 1 bidding package .
05/05/2018 17:06
Trường tiểu học Chiềng Nơi 2 publishes the plan Classroom and office equipment with 1 bidding package .
05/05/2018 17:02
Trường tiểu học Chiềng Nơi 2 publishes the plan Stationery supplies for the last 8 months of 2018 with 1 bidding package .
05/05/2018 16:54
Trường tiểu học Chiềng Nơi 2 publishes the plan Repair water locator, computer equipment, virus software with 1 bidding package .
22/12/2017 09:12
Trường tiểu học Chiềng Nơi 2 publishes the plan Frame of signs, slogans, letters with 1 bidding package .
21/12/2017 16:34
Trường tiểu học Chiềng Nơi 2 publishes the plan Professional stationery supplies for the year, Quarter IV/2017, Tea, office supplies with 1 bidding package .
07/11/2017 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Repair and upgrade toilet works of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 17:15
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Repairing the system of 2-storey classrooms of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 17:06
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Classroom and office equipment of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 17:02
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Stationery supplies for the last 8 months of 2018 of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
05/05/2018 16:54
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Repair water locator, computer equipment, virus software of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
22/12/2017 09:12
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Frame of signs, slogans, letters of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
21/12/2017 16:34
The Bid solicitor Trường tiểu học Chiềng Nơi 2 has posted the request Professional stationery supplies for the year, Quarter IV/2017, Tea, office supplies of the investor Trường tiểu học Chiềng Nơi 2 with 1 bidding package.
07/11/2017 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường tiểu học Chiềng Nơi 2 has posted 7 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường tiểu học Chiềng Nơi 2 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects