Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu học Thụy Lôi as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 11 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 106,880,000 VND, of which the total winning bid value is: 101,880,000 VND.
- The savings rate is: 4.68%.
Data analysis results of DauThau.info software for bid solicitors Trường Tiểu học Thụy Lôi as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 106,880,000 VND, in which the total winning value is: 101,880,000 VND.
- The savings rate is: 4.68%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường Tiểu học Thụy Lôi are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 4 contractor selection plans, of which 3 were self-published, and 1 were published by other entities.
- Is the investor of 4 Tender Notices, of which 0 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường Tiểu học Thụy Lôi announced the results of the bid package Bidding package 01: Shopping for enhancement of Thuy Loi Primary School's facilities in 2025 .
- Winning bidder: PHUC HUNG TECHNOLOGY AND TRADING COMPANY LIMITED
17/10/2025 14:35
Trường Tiểu học Thụy Lôi publishes Tender Notice Bidding package 01: Shopping for enhancement of Thuy Loi Primary School's facilities in 2025 in the form Open bidding .
03/10/2025 16:52
Trường Tiểu học Thụy Lôi publishes Tender Notice Bidding package 01: Shopping for enhancement of Thuy Loi Primary School's facilities in 2025 in the form Open bidding .
01/10/2025 10:52
Trường Tiểu học Thụy Lôi announced the results of the bid package Bidding Package 02: Consultancy on preparation of bidding documents and evaluation of bids .
- Winning bidder: NHAT MINH INVESTMENT ADVISORY AND TRADING SERVICES JOINT STOCK COMPANY
24/09/2025 15:48
Trường Tiểu học Thụy Lôi publishes the plan Shopping for enhanced facilities of Thuy Loi Primary School in 2025 with 2 bidding package .
24/09/2025 15:41
The Bid solicitor Trường Tiểu học Thụy Lôi has posted the results of the bidding package Providing LED screens for the council room of Thuy Loi Primary School of the investor Trường Tiểu học Thụy Lôi.
- Winning bidder: Hộ kinh doanh trung tâm thiết bị trường học Hùng Dũng
18/09/2024 16:58
The Bid solicitor Trường Tiểu học Thụy Lôi has posted the request Providing LED screens for the council room of Thuy Loi Primary School of the investor Trường Tiểu học Thụy Lôi with 1 bidding package.
18/09/2024 16:50
The Bid solicitor PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED has posted the results of the bidding package Construction of the investor Trường Tiểu học Thụy Lôi.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG QUANG MINH HƯNG YÊN
16/08/2024 07:26
The Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN TDH has posted the results of the bidding package Tender package No 01: Construction work of the investor Trường Tiểu học Thụy Lôi.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI HẢI YÊN PHÁT
31/07/2024 21:54
Bid solicitor PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED has posted Tender Notice Construction of the investor Trường Tiểu học Thụy Lôi with the form Competitive Offer.
18/07/2024 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Tiểu học Thụy Lôi announced the results of the bid package Providing LED screens for the council room of Thuy Loi Primary School .
- Winning bidder: Hộ kinh doanh trung tâm thiết bị trường học Hùng Dũng
18/09/2024 16:58
Trường Tiểu học Thụy Lôi publishes the plan Providing LED screens for the council room of Thuy Loi Primary School with 1 bidding package .
18/09/2024 16:50
Trường Tiểu học Thụy Lôi publishes the plan Maintaining and repairing the parking shed for the play area at Thuy Loi primary school with 5 bidding package .
17/07/2024 20:36
Trường Tiểu học Thụy Lôi announced the results of the bid package Package No. 04: Bid preparation consultancy, Bid evaluation .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
09/07/2024 08:19
Trường Tiểu học Thụy Lôi announced the results of the bid package Package No. 05: Consultancy on appraisal of bidding documents, LCNT results .
- Winning bidder: TPC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
09/07/2024 08:19
Trường Tiểu học Thụy Lôi publishes the plan Project contractor selection plan: Maintenance and repair of auxiliary items at Thuy Loi Primary School with 5 bidding package .
05/07/2024 17:25
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Tiểu học Thụy Lôi announced the results of the bid package Bidding package 01: Shopping for enhancement of Thuy Loi Primary School's facilities in 2025 .
- Winning bidder: PHUC HUNG TECHNOLOGY AND TRADING COMPANY LIMITED
17/10/2025 14:35
Trường Tiểu học Thụy Lôi publishes Tender Notice Bidding package 01: Shopping for enhancement of Thuy Loi Primary School's facilities in 2025 in the form Open bidding .
03/10/2025 16:52
Trường Tiểu học Thụy Lôi publishes Tender Notice Bidding package 01: Shopping for enhancement of Thuy Loi Primary School's facilities in 2025 in the form Open bidding .
01/10/2025 10:52
Trường Tiểu học Thụy Lôi announced the results of the bid package Bidding Package 02: Consultancy on preparation of bidding documents and evaluation of bids .
- Winning bidder: NHAT MINH INVESTMENT ADVISORY AND TRADING SERVICES JOINT STOCK COMPANY
24/09/2025 15:48
Trường Tiểu học Thụy Lôi publishes the plan Shopping for enhanced facilities of Thuy Loi Primary School in 2025 with 2 bidding package .
24/09/2025 15:41
The Bid solicitor Trường Tiểu học Thụy Lôi has posted the results of the bidding package Providing LED screens for the council room of Thuy Loi Primary School of the investor Trường Tiểu học Thụy Lôi.
- Winning bidder: Hộ kinh doanh trung tâm thiết bị trường học Hùng Dũng
18/09/2024 16:58
The Bid solicitor Trường Tiểu học Thụy Lôi has posted the request Providing LED screens for the council room of Thuy Loi Primary School of the investor Trường Tiểu học Thụy Lôi with 1 bidding package.
18/09/2024 16:50
The Bid solicitor PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED has posted the results of the bidding package Construction of the investor Trường Tiểu học Thụy Lôi.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG QUANG MINH HƯNG YÊN
16/08/2024 07:26
The Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN TDH has posted the results of the bidding package Tender package No 01: Construction work of the investor Trường Tiểu học Thụy Lôi.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI HẢI YÊN PHÁT
31/07/2024 21:54
Bid solicitor PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED has posted Tender Notice Construction of the investor Trường Tiểu học Thụy Lôi with the form Competitive Offer.
18/07/2024 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường Tiểu học Thụy Lôi has posted 3 of the contractor selection plan, which contains 11 of the bidding package. See full list here
Summary: The Bid solicitor Trường Tiểu học Thụy Lôi has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường Tiểu học Thụy Lôi has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường Tiểu học Thụy Lôi has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường Tiểu học Thụy Lôi has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects