Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND huyện Quan Hóa as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 11 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND huyện Quan Hóa as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND huyện Quan Hóa are as follows:
- Is the investor of 11 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Quan Hóa has posted the results of the bidding package Prepare and adjust land use planning for the period 2021-2030 and land use plan in 2023 at district level, Quan Hoa district, Thanh Hoa province of the investor UBND huyện Quan Hóa.
- Winning bidder: DONG BAC A CONSULTANT AND SERVICES JOINT STOCK COMPANY
06/12/2022 08:14
Bid solicitor Phòng Tài nguyên và Môi trường huyện Quan Hóa has posted Tender Notice Prepare and adjust land use planning for the period 2021-2030 and land use plan in 2023 at district level, Quan Hoa district, Thanh Hoa province of the investor UBND huyện Quan Hóa with the form Open bidding.
01/11/2022 15:41
Investor UBND huyện Quan Hóa has posted an investment and development project Prepare and adjust land use planning for the period 2021-2030 and land use plan in 2023 at district level, Quan Hoa district, Thanh Hoa province.
21/10/2022 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects