Data analysis results of DauThau.info software for bid solicitors UBND quận Liên Chiểu as follows:
- Has relationships with 46 contractor.
- Announced 187 investment development project, of which 9 projects have not yet announced the prequalification documents.
- Announced 203 contractor selection plans with a total of 459 bidding packages, of which 73 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 8 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 84 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 84 packages with results that do not have tender notice or prequalification notice.
- There are 318 packages that have not fully posted the contractor selection results. Of these 299 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.80 contractors.
- Breakdown by bidding field: Goods 75.00%, Construction 0%, Consultancy 0%, Non-consultancy 25.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,776,846,000 VND, of which the total winning bid value is: 6,516,083,000 VND.
- The savings rate is: 3.85%.
Data analysis results of DauThau.info software for bid solicitors UBND quận Liên Chiểu as follows:
- Has relationships with 46 contractor.
- The average number of contractors participating in each bidding package is: 2.80 contractors.
- Proportion of bidding fields: Goods 75.00%, Construction 0%, Consulting 0%, Non-consulting 25.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,776,846,000 VND, in which the total winning value is: 6,516,083,000 VND.
- The savings rate is: 3.85%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 187 investment and development projects.
- As the owner of 262 Contractor selection plan in which 201 Contractor selection plan is self-published, and 61 Contractor selection plan is posted by other units.
- Being the investor of 147 bidding packages in which 1 packages are self-invited, and 146 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor UBND quận Liên Chiểu has posted the request Contractor selection plan Project: New construction of subject classrooms, office and kitchen area,
Upgrading the fence of Duy Tan Primary School of the investor UBND quận Liên Chiểu with 12 bidding package.
25/10/2024 09:54
UBND quận Liên Chiểu Posted Development Investment Project New construction of subject classrooms, office and kitchen area,
Upgrading the fence of Duy Tan Primary School.
25/10/2024 09:09
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Hiep Bac ward (Phase 2) of the investor UBND quận Liên Chiểu with 1 bidding package.
24/10/2024 14:31
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Khanh Bac ward (Phase 2) of the investor UBND quận Liên Chiểu with 1 bidding package.
24/10/2024 14:27
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Hiep Nam ward (Phase 2) of the investor UBND quận Liên Chiểu with 1 bidding package.
24/10/2024 14:10
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding packages: Consulting on preparing technical and economic reports;
Consulting on verifying design documents and estimates
Project: Complete paint, renew xingfa aluminum door system
classrooms, school grounds, drainage systems,
Fire protection system at Tran Binh Trong primary school of the investor UBND quận Liên Chiểu with 2 bidding package.
23/10/2024 13:57
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Brick paving for school yard, drainage system,
Painting classrooms, fences and gates, building new garages and installing new ones
Protection frame for the office and classroom of Nguyen Thai Binh Secondary School of the investor UBND quận Liên Chiểu with 1 bidding package.
23/10/2024 13:51
UBND quận Liên Chiểu Posted Development Investment Project Paint the entire system, renew the xingfa aluminum door system in the classrooms,
school yard foundation, drainage system, fire protection system at Tran Primary School
Binh Trong.
22/10/2024 14:14
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Consulting on project quality inspection
Project: Upgrading embankment at J258 Residential Area of the investor UBND quận Liên Chiểu with 1 bidding package.
22/10/2024 14:02
The Bid solicitor UBND quận Liên Chiểu has posted the results of the bidding package Construction supervision consulting
Construction, supply and installation of construction equipment
Project: Repairing office rooms and staterooms
and the District Party Committee meeting room of the investor UBND quận Liên Chiểu.
- Winning bidder: CÔNG TY TNHH PHÚC NGUYÊN KHÁNH
15/10/2024 11:08
The data sheet has been partially hidden, to see the full information please Login or Register
UBND quận Liên Chiểu publishes the plan Contractor selection plan Project: New construction of subject classrooms, office and kitchen area,
Upgrading the fence of Duy Tan Primary School with 12 bidding package .
25/10/2024 09:54
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Hiep Bac ward (Phase 2) with 1 bidding package .
24/10/2024 14:31
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Khanh Bac ward (Phase 2) with 1 bidding package .
24/10/2024 14:27
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Hiep Nam ward (Phase 2) with 1 bidding package .
24/10/2024 14:10
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding packages: Consulting on preparing technical and economic reports;
Consulting on verifying design documents and estimates
Project: Complete paint, renew xingfa aluminum door system
classrooms, school grounds, drainage systems,
Fire protection system at Tran Binh Trong primary school with 2 bidding package .
23/10/2024 13:57
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding package: Construction supervision consulting
Project: Brick paving for school yard, drainage system,
Painting classrooms, fences and gates, building new garages and installing new ones
Protection frame for the office and classroom of Nguyen Thai Binh Secondary School with 1 bidding package .
23/10/2024 13:51
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding package: Consulting on project quality inspection
Project: Upgrading embankment at J258 Residential Area with 1 bidding package .
22/10/2024 14:02
UBND quận Liên Chiểu announced the results of the bid package Construction supervision consulting
Construction, supply and installation of construction equipment
Project: Repairing office rooms and staterooms
and the District Party Committee meeting room .
- Winning bidder: CÔNG TY TNHH PHÚC NGUYÊN KHÁNH
15/10/2024 11:08
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding packages: Bidding package No. 01: Digitizing administrative procedure records
of specialized units of the district and People's Committees of the wards;
Bidding package No. 02: Consulting on preparing bidding documents and evaluating bid documents
Bidding service: Digitization of administrative procedure records
specialized agencies, People's Committees of wards in the district with 2 bidding package .
11/10/2024 14:41
UBND quận Liên Chiểu publishes the plan contractor selection plan
Bidding packages: Bidding package No. 01 for procurement of desktop computers and laptops;
Bidding package No. 02 for procurement of Printers; Bidding package No. 03 for procurement of photocopiers;
Consulting on preparing bidding documents and evaluating bid documents; Consulting on lake appraisal
Bidding documents and appraisal of contractor selection results
Project: Purchasing new desktop computers, laptops, printers and
photocopiers in 2024 in a centralized manner with 9 bidding package .
10/10/2024 10:13
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND quận Liên Chiểu has posted the request Contractor selection plan Project: New construction of subject classrooms, office and kitchen area,
Upgrading the fence of Duy Tan Primary School of the investor UBND quận Liên Chiểu with 12 bidding package.
25/10/2024 09:54
UBND quận Liên Chiểu Posted Development Investment Project New construction of subject classrooms, office and kitchen area,
Upgrading the fence of Duy Tan Primary School.
25/10/2024 09:09
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Hiep Bac ward (Phase 2) of the investor UBND quận Liên Chiểu with 1 bidding package.
24/10/2024 14:31
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Khanh Bac ward (Phase 2) of the investor UBND quận Liên Chiểu with 1 bidding package.
24/10/2024 14:27
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Electrical lighting for residential area in Hoa Hiep Nam ward (Phase 2) of the investor UBND quận Liên Chiểu with 1 bidding package.
24/10/2024 14:10
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding packages: Consulting on preparing technical and economic reports;
Consulting on verifying design documents and estimates
Project: Complete paint, renew xingfa aluminum door system
classrooms, school grounds, drainage systems,
Fire protection system at Tran Binh Trong primary school of the investor UBND quận Liên Chiểu with 2 bidding package.
23/10/2024 13:57
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Construction supervision consulting
Project: Brick paving for school yard, drainage system,
Painting classrooms, fences and gates, building new garages and installing new ones
Protection frame for the office and classroom of Nguyen Thai Binh Secondary School of the investor UBND quận Liên Chiểu with 1 bidding package.
23/10/2024 13:51
UBND quận Liên Chiểu Posted Development Investment Project Paint the entire system, renew the xingfa aluminum door system in the classrooms,
school yard foundation, drainage system, fire protection system at Tran Primary School
Binh Trong.
22/10/2024 14:14
The Bid solicitor UBND quận Liên Chiểu has posted the request contractor selection plan
Bidding package: Consulting on project quality inspection
Project: Upgrading embankment at J258 Residential Area of the investor UBND quận Liên Chiểu with 1 bidding package.
22/10/2024 14:02
The Bid solicitor UBND quận Liên Chiểu has posted the results of the bidding package Construction supervision consulting
Construction, supply and installation of construction equipment
Project: Repairing office rooms and staterooms
and the District Party Committee meeting room of the investor UBND quận Liên Chiểu.
- Winning bidder: CÔNG TY TNHH PHÚC NGUYÊN KHÁNH
15/10/2024 11:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND quận Liên Chiểu has posted 203 of the contractor selection plan, which contains 459 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND quận Liên Chiểu has posted 8 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND quận Liên Chiểu has posted 84 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 84 package, canceled the bid 0 package (among the bidding packages above).
- There are 84 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND quận Liên Chiểu has a relationship with 46 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND quận Liên Chiểu has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND quận Liên Chiểu is the investor of 147 package, of which 1 package is self-invited, other units invite bid 146 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND quận Liên Chiểu is the owner of 262 contractor selection plan. In which, they self-invite 201 of contractor selection plan, other units invite bids of 61 of contractor selection plan.
Summary: Investor UBND quận Liên Chiểu is an investor with 241 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND quận Liên Chiểu is the investor of 187 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code