Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND THỊ TRẤN CAM LỘ as follows:
- Has relationships with 2 project owners.
- Has relationships with 5 contractor.
- Announced 26 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 25 contractor selection plans with a total of 71 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 60 packages that have not fully posted the contractor selection results. Of these 60 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,937,969,000 VND, of which the total winning bid value is: 5,921,893,000 VND.
- The savings rate is: 0.27%.
Data analysis results of DauThau.info software for bid solicitors UBND THỊ TRẤN CAM LỘ as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,937,969,000 VND, in which the total winning value is: 5,921,893,000 VND.
- The savings rate is: 0.27%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND THỊ TRẤN CAM LỘ are as follows:
- Is the investor of 26 development investment projects.
- Is the investor of 13 contractor selection plans, of which 12 were self-published, and 1 were published by other entities.
- Is the investor of 3 Tender Notices, of which 2 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Detailed planning 1/500 scale: Urban residential area of Cam Lo town, Cam Lo district of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
29/04/2025 11:18
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Infrastructure of residential areas north of Ham Nghi street (phase 2). of the investor UBND THỊ TRẤN CAM LỘ with 4 bidding package.
29/04/2025 11:08
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Cultural and Cultural Center of Quarter 5, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
29/04/2025 10:23
Investor UBND THỊ TRẤN CAM LỘ has posted an investment and development project Cultural and Cultural Center of Quarter 5, Cam Lo town.
29/04/2025 10:10
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Cultural and Cultural Center of Quarter 9, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
26/02/2025 15:38
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Road Kiet 20, Tran Hung Dao Street, Quarter 8, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
25/02/2025 15:19
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the results of the bidding package Construction of the entire volume of works of the investor UBND THỊ TRẤN CAM LỘ.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN FORD BEN
10/12/2024 10:55
Bid solicitor UBND THỊ TRẤN CAM LỘ has posted Tender Notice Construction of the entire volume of works of the investor UBND THỊ TRẤN CAM LỘ with the form Competitive Offer.
30/10/2024 16:26
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Village communal house and Phien Cam Lo market; Category: Construction of campus and memorial stele. of the investor UBND THỊ TRẤN CAM LỘ with 4 bidding package.
24/10/2024 16:30
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Renovating and upgrading the memorial stele house for martyrs in Quarter 1, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 2 bidding package.
19/08/2024 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
UBND THỊ TRẤN CAM LỘ publishes the plan Detailed planning 1/500 scale: Urban residential area of Cam Lo town, Cam Lo district with 3 bidding package .
29/04/2025 11:18
UBND THỊ TRẤN CAM LỘ publishes the plan Infrastructure of residential areas north of Ham Nghi street (phase 2). with 4 bidding package .
29/04/2025 11:08
UBND THỊ TRẤN CAM LỘ publishes the plan Cultural and Cultural Center of Quarter 5, Cam Lo town with 3 bidding package .
29/04/2025 10:23
UBND THỊ TRẤN CAM LỘ publishes the plan Cultural and Cultural Center of Quarter 9, Cam Lo town with 3 bidding package .
26/02/2025 15:38
UBND THỊ TRẤN CAM LỘ publishes the plan Road Kiet 20, Tran Hung Dao Street, Quarter 8, Cam Lo town with 3 bidding package .
25/02/2025 15:19
UBND THỊ TRẤN CAM LỘ announced the results of the bid package Construction of the entire volume of works .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN FORD BEN
10/12/2024 10:55
UBND THỊ TRẤN CAM LỘ announced the results of the bidding package Construction of the entire volume of works with 2 participating contractors .
06/11/2024 05:54
UBND THỊ TRẤN CAM LỘ publishes Tender Notice Construction of the entire volume of works in the form Competitive Offer .
30/10/2024 16:26
UBND THỊ TRẤN CAM LỘ publishes the plan Village communal house and Phien Cam Lo market; Category: Construction of campus and memorial stele. with 4 bidding package .
24/10/2024 16:30
UBND THỊ TRẤN CAM LỘ publishes the plan Renovating and upgrading the memorial stele house for martyrs in Quarter 1, Cam Lo town with 2 bidding package .
19/08/2024 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Detailed planning 1/500 scale: Urban residential area of Cam Lo town, Cam Lo district of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
29/04/2025 11:18
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Infrastructure of residential areas north of Ham Nghi street (phase 2). of the investor UBND THỊ TRẤN CAM LỘ with 4 bidding package.
29/04/2025 11:08
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Cultural and Cultural Center of Quarter 5, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
29/04/2025 10:23
Investor UBND THỊ TRẤN CAM LỘ has posted an investment and development project Cultural and Cultural Center of Quarter 5, Cam Lo town.
29/04/2025 10:10
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Cultural and Cultural Center of Quarter 9, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
26/02/2025 15:38
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Road Kiet 20, Tran Hung Dao Street, Quarter 8, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 3 bidding package.
25/02/2025 15:19
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the results of the bidding package Construction of the entire volume of works of the investor UBND THỊ TRẤN CAM LỘ.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN FORD BEN
10/12/2024 10:55
Bid solicitor UBND THỊ TRẤN CAM LỘ has posted Tender Notice Construction of the entire volume of works of the investor UBND THỊ TRẤN CAM LỘ with the form Competitive Offer.
30/10/2024 16:26
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Village communal house and Phien Cam Lo market; Category: Construction of campus and memorial stele. of the investor UBND THỊ TRẤN CAM LỘ with 4 bidding package.
24/10/2024 16:30
The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted the request Renovating and upgrading the memorial stele house for martyrs in Quarter 1, Cam Lo town of the investor UBND THỊ TRẤN CAM LỘ with 2 bidding package.
19/08/2024 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND THỊ TRẤN CAM LỘ has posted 25 of the contractor selection plan, which contains 71 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted 5 Tender Notices in 4 bidding packages. Among these, 2 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND THỊ TRẤN CAM LỘ has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND THỊ TRẤN CAM LỘ has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND THỊ TRẤN CAM LỘ has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND THỊ TRẤN CAM LỘ has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects