Data analysis results of DauThau.info software for bid solicitors UBND xã Kim Hoa as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 5 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 392,834,000 VND, of which the total winning bid value is: 332,494,000 VND.
- The savings rate is: 15.36%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Kim Hoa as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 3.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 392,834,000 VND, in which the total winning value is: 332,494,000 VND.
- The savings rate is: 15.36%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Kim Hoa are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 3 Tender Notices, of which 1 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ has posted the results of the bidding package 01.XL-TB Construction and installation of construction equipment Upgrading the irrigation canal of Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa.
- Winning bidder: CÔNG TY CP XÂY DỰNG VÀ THƯƠNG MẠI MẠNH LINH
20/11/2024 13:17
Bid solicitor CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ has posted Tender Notice 01.XL-TB Construction and installation of construction equipment Upgrading the irrigation canal of Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa with the form Open bidding.
26/10/2024 00:59
Bid solicitor CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ has posted Tender Notice 01.XL-TB Construction and installation of construction equipment Upgrading the irrigation canal of Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa with the form Open bidding.
23/10/2024 23:50
The Bid solicitor UBND xã Kim Hoa has posted the results of the bidding package 01.TVXD Consulting on preparing bidding documents and evaluating bidding documents for construction and equipment of the investor UBND xã Kim Hoa.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ
17/10/2024 20:42
The Bid solicitor UBND xã Kim Hoa has posted the request Project contractor selection plan: Upgrading irrigation canal route at Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa with 4 bidding package.
14/10/2024 22:55
Investor UBND xã Kim Hoa has posted an investment and development project Upgrading the irrigation canal at Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province.
14/10/2024 22:22
The Bid solicitor UBND xã Kim Hoa has posted the results of the bidding package Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 of the investor UBND xã Kim Hoa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬN TẢI HẢI ANH
08/08/2024 08:32
Bid solicitor UBND xã Kim Hoa has posted Tender Notice Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 of the investor UBND xã Kim Hoa with the form Competitive Offer.
03/07/2024 15:01
The Bid solicitor UBND xã Kim Hoa has posted the request Procurement of cement to implement the Plan to build roads and drainage ditches in 2024 in Kim Hoa commune of the investor UBND xã Kim Hoa with 1 bidding package.
01/07/2024 15:02
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Kim Hoa announced the results of the bid package 01.TVXD Consulting on preparing bidding documents and evaluating bidding documents for construction and equipment .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ
17/10/2024 20:42
UBND xã Kim Hoa publishes the plan Project contractor selection plan: Upgrading irrigation canal route at Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province with 4 bidding package .
14/10/2024 22:55
UBND xã Kim Hoa announced the results of the bid package Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬN TẢI HẢI ANH
08/08/2024 08:32
UBND xã Kim Hoa announced the results of the bidding package Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 with 3 participating contractors .
10/07/2024 08:38
UBND xã Kim Hoa publishes Tender Notice Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 in the form Competitive Offer .
03/07/2024 15:01
UBND xã Kim Hoa publishes the plan Procurement of cement to implement the Plan to build roads and drainage ditches in 2024 in Kim Hoa commune with 1 bidding package .
01/07/2024 15:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ has posted the results of the bidding package 01.XL-TB Construction and installation of construction equipment Upgrading the irrigation canal of Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa.
- Winning bidder: CÔNG TY CP XÂY DỰNG VÀ THƯƠNG MẠI MẠNH LINH
20/11/2024 13:17
Bid solicitor CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ has posted Tender Notice 01.XL-TB Construction and installation of construction equipment Upgrading the irrigation canal of Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa with the form Open bidding.
26/10/2024 00:59
Bid solicitor CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ has posted Tender Notice 01.XL-TB Construction and installation of construction equipment Upgrading the irrigation canal of Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa with the form Open bidding.
23/10/2024 23:50
The Bid solicitor UBND xã Kim Hoa has posted the results of the bidding package 01.TVXD Consulting on preparing bidding documents and evaluating bidding documents for construction and equipment of the investor UBND xã Kim Hoa.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHONG HÀ
17/10/2024 20:42
The Bid solicitor UBND xã Kim Hoa has posted the request Project contractor selection plan: Upgrading irrigation canal route at Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province of the investor UBND xã Kim Hoa with 4 bidding package.
14/10/2024 22:55
Investor UBND xã Kim Hoa has posted an investment and development project Upgrading the irrigation canal at Son Phuc pumping station, Kim Hoa commune, Huong Son district, Ha Tinh province.
14/10/2024 22:22
The Bid solicitor UBND xã Kim Hoa has posted the results of the bidding package Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 of the investor UBND xã Kim Hoa.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬN TẢI HẢI ANH
08/08/2024 08:32
Bid solicitor UBND xã Kim Hoa has posted Tender Notice Procurement of cement to implement the Plan for building roads and drainage ditches in 2024 of the investor UBND xã Kim Hoa with the form Competitive Offer.
03/07/2024 15:01
The Bid solicitor UBND xã Kim Hoa has posted the request Procurement of cement to implement the Plan to build roads and drainage ditches in 2024 in Kim Hoa commune of the investor UBND xã Kim Hoa with 1 bidding package.
01/07/2024 15:02
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Kim Hoa has posted 2 of the contractor selection plan, which contains 5 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND xã Kim Hoa has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Kim Hoa has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND xã Kim Hoa has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Kim Hoa has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Kim Hoa has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects