Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND xã Kim Tân as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Kim Tân as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Kim Tân are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 16 contractor selection plans, of which 0 were self-published, and 16 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND xã Kim Tân announced the results of the bid package Package 02: Supervision consultancy .
- Winning bidder: Công ty trách nghiệm hữu hạn tư vấn và dịch vụ thương mại Vạn Xuân
21/08/2026 22:51
UBND xã Kim Tân publishes the plan Project contractor selection plan: Bank stabilization project for the left bank of the Buoi River (Ma Nuoc pumping station area), Kim Tan commune, Thanh Hoa province. with 4 bidding package .
16/08/2026 14:22
Investor UBND xã Kim Tân has posted an investment and development project Levee for erosion control along the left bank of the Buoi River (near the Ma Nuoc pumping station), Kim Tan commune, Thanh Hoa province..
16/08/2026 14:14
UBND xã Kim Tân announced the results of the bid package Package 02: Consulting on verification of economic and technical reports .
- Winning bidder: Công ty TNHH Thành Hưng Green
16/08/2026 14:01
UBND xã Kim Tân announced the results of the bid package Package 01: Consulting survey, making economic - technical reports .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH 36
16/08/2026 10:57
UBND xã Kim Tân announced the results of the bid package Package 03: Project Management Consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NGA HƯNG
16/08/2026 10:53
UBND xã Kim Tân publishes the plan Procurement plan for the investment preparation phase of the project: Bank Stabilization to Prevent Erosion on the Left Bank of the Buoi River (Ma Nuoc Pumping Station Area), Kim Tan Commune, Thanh Hoa Province. with 3 bidding package .
16/08/2026 10:50
UBND xã Kim Tân announced the results of the bid package Tender package No 01: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY LẮP HOÀNG THẠCH
22/07/2026 08:07
UBND xã Kim Tân announced the results of the bid package Package 04: Supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG CÔNG TRÌNH 36
27/06/2026 11:12
UBND xã Kim Tân announced the results of the bid package Package 03: Construction and equipment supply and installation .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG - THƯƠNG MẠI Đ&T
27/06/2026 11:05
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Kim Tân has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Kim Tân has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects