Data analysis results of DauThau.info software for bid solicitors UBND XÃ PHẠM NGŨ LÃO as follows:
- Has relationships with 1 project owners.
- Has relationships with 32 contractor.
- Announced 39 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 8 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 772,654,394 VND, of which the total winning bid value is: 772,652,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UBND XÃ PHẠM NGŨ LÃO as follows:
- Has relationships with 32 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 772,654,394 VND, in which the total winning value is: 772,652,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND XÃ PHẠM NGŨ LÃO are as follows:
- Is the investor of 39 development investment projects.
- Is the investor of 93 contractor selection plans, of which 1 were self-published, and 92 were published by other entities.
- Is the investor of 18 Tender Notices, of which 0 were self-invited, and 18 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: Công ty Cổ phần Tư vấn và Đầu tư xây dựng Thịnh An Khang
28/08/2026 16:10
UBND XÃ PHẠM NGŨ LÃO publishes the plan Plan for selecting a contractor during the investment preparation phase, including preparing the technical and economic report for the construction project: Construction of gate, fence, restroom, and auxiliary facilities at the Pham Nu Luong Cultural Center. with 2 bidding package .
28/08/2026 15:58
UBND XÃ PHẠM NGŨ LÃO publishes the plan Plan for the initial investment phase and preparation of the technical economic report for the construction project: Renovation and repair of the Bãi Sậy Cultural Center (existing building) in Phạm Ngũ Lão commune, including related components. with 2 bidding package .
25/08/2026 15:27
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 02: Consulting on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ TƯ VẤN TIÊN LỮ
18/08/2026 16:21
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 01: Consulting survey, making economic - technical reports .
- Winning bidder: MINH QUAN MHM COMPANY LIMITED
18/08/2026 16:18
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package No. 03: Valuation consultancy .
- Winning bidder: VIET NAM DVT CONSULTANT AND VALUATION JOINT STOCK COMPANY
18/08/2026 16:13
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 02: Consulting on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ TƯ VẤN TIÊN LỮ
18/08/2026 16:11
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 01: Consulting survey, making economic - technical reports .
- Winning bidder: MINH QUAN MHM COMPANY LIMITED
18/08/2026 16:08
UBND XÃ PHẠM NGŨ LÃO publishes the plan The plan for the cost estimation and bidding process for the investment preparation phase, including the preparation of the technical economic report for the construction project: Relocation of electricity to support land acquisition for the Phù Ủng commune (La Mat, Dong Mai, Kim Lu, Hong Luong, and Sa Lung village) road improvement and upgrade project. with 2 bidding package .
17/08/2026 23:03
UBND XÃ PHẠM NGŨ LÃO publishes the plan Plan for the preparation of bidding packages for investment phases and the development of technical and economic reports for construction projects: Undergrounding of a 22kV power line to serve land acquisition for the new residential area project in Ben Song village, Bac Son commune, An Thien district. with 3 bidding package .
17/08/2026 22:53
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Bidding package No. 04: Consulting on construction supervision .
- Winning bidder: Công ty TNHH đầu tư xây dựng NEXBUILD
30/06/2026 09:17
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Bidding package No. 07: Consulting on appraisal of bidding documents and QLCNT for construction bidding packages .
- Winning bidder: Công ty TNHH tư vấn và xây dựng Thành Sơn Hưng Yên
26/05/2026 09:52
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Bidding package No. 06: Consulting on preparing bidding documents and evaluating bidding documents for construction bidding packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TRÚC VIỆT
26/05/2026 09:50
UBND XÃ PHẠM NGŨ LÃO publishes the plan Approve the adjustment of the contractor selection plan for the project: Renovating and upgrading Bac Son commune's rural road (section from Mr. Du's house adjacent to Provincial road 384 to Mr. Toan's house adjacent to Provincial road 382) with 8 bidding package .
19/05/2026 15:59
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: Công ty Cổ phần Tư vấn và Đầu tư xây dựng Thịnh An Khang
28/08/2026 16:10
UBND XÃ PHẠM NGŨ LÃO publishes the plan Plan for selecting a contractor during the investment preparation phase, including preparing the technical and economic report for the construction project: Construction of gate, fence, restroom, and auxiliary facilities at the Pham Nu Luong Cultural Center. with 2 bidding package .
28/08/2026 15:58
UBND XÃ PHẠM NGŨ LÃO publishes the plan Plan for the initial investment phase and preparation of the technical economic report for the construction project: Renovation and repair of the Bãi Sậy Cultural Center (existing building) in Phạm Ngũ Lão commune, including related components. with 2 bidding package .
25/08/2026 15:27
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 02: Consulting on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ TƯ VẤN TIÊN LỮ
18/08/2026 16:21
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 01: Consulting survey, making economic - technical reports .
- Winning bidder: MINH QUAN MHM COMPANY LIMITED
18/08/2026 16:18
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package No. 03: Valuation consultancy .
- Winning bidder: VIET NAM DVT CONSULTANT AND VALUATION JOINT STOCK COMPANY
18/08/2026 16:13
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 02: Consulting on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ TƯ VẤN TIÊN LỮ
18/08/2026 16:11
UBND XÃ PHẠM NGŨ LÃO announced the results of the bid package Package 01: Consulting survey, making economic - technical reports .
- Winning bidder: MINH QUAN MHM COMPANY LIMITED
18/08/2026 16:08
UBND XÃ PHẠM NGŨ LÃO publishes the plan The plan for the cost estimation and bidding process for the investment preparation phase, including the preparation of the technical economic report for the construction project: Relocation of electricity to support land acquisition for the Phù Ủng commune (La Mat, Dong Mai, Kim Lu, Hong Luong, and Sa Lung village) road improvement and upgrade project. with 2 bidding package .
17/08/2026 23:03
UBND XÃ PHẠM NGŨ LÃO publishes the plan Plan for the preparation of bidding packages for investment phases and the development of technical and economic reports for construction projects: Undergrounding of a 22kV power line to serve land acquisition for the new residential area project in Ben Song village, Bac Son commune, An Thien district. with 3 bidding package .
17/08/2026 22:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND XÃ PHẠM NGŨ LÃO has posted 1 of the contractor selection plan, which contains 8 of the bidding package. See full list here
Summary: The Bid solicitor UBND XÃ PHẠM NGŨ LÃO has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND XÃ PHẠM NGŨ LÃO has a relationship with 32 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND XÃ PHẠM NGŨ LÃO has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND XÃ PHẠM NGŨ LÃO has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects