Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND xã Tam Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 32 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 51 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 38 packages that have not fully posted the contractor selection results. Of these 37 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 14,188,000 VND, of which the total winning bid value is: 14,188,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Tam Sơn as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 14,188,000 VND, in which the total winning value is: 14,188,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Tam Sơn are as follows:
- Is the investor of 32 development investment projects.
- Is the investor of 11 contractor selection plans, of which 11 were self-published, and 0 were published by other entities.
- Is the investor of 16 Tender Notices, of which 0 were self-invited, and 16 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Civil Works of the investor UBND xã Tam Sơn.
- Winning bidder: NAVICO CONSULTING, DESIGN AND CONSTRUCTION COMPANY LIMITED
23/05/2025 10:58
Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted Tender Notice Civil Works of the investor UBND xã Tam Sơn with the form Open bidding.
18/04/2025 16:47
The Bid solicitor UBND xã Tam Sơn has posted the request Overcome the landslide point of the Route DX2 (Squirrel Scholar Score -Ong Hanh's house) The section near the pineapple bridge in Duc Phu village, Tam Son commune of the investor UBND xã Tam Sơn with 7 bidding package.
10/04/2025 10:45
Investor UBND xã Tam Sơn has posted an investment and development project Overcome the landslide point of the Road DX2 (Squirrel kindergarten point - Mr. Hanh's house) near the pineapple bridge in Duc Phu village, Tam Son commune.
10/04/2025 09:09
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Construction of the investor UBND xã Tam Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ ĐẦU TƯ PHÚ TRUNG
31/12/2024 09:28
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Construction of the investor UBND xã Tam Sơn.
- Winning bidder: CÔNG TY TNHH TỔNG HỢP XÂY DỰNG ĐỨC THÀNH
04/12/2024 14:52
Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted Tender Notice Construction of the investor UBND xã Tam Sơn with the form Open bidding.
29/11/2024 21:13
The Bid solicitor UBND xã Tam Sơn has posted the request Repair drainage ditch system and auxiliary works along DH3 route (section from Thuan Yen Dong village cultural house to in front of Thuan Yen parish church) of the investor UBND xã Tam Sơn with 5 bidding package.
29/11/2024 18:42
Investor UBND xã Tam Sơn has posted an investment and development project Repair drainage ditch system and auxiliary works along DH3 route (section from Thuan Yen Dong village cultural house to in front of Thuan Yen parish church).
29/11/2024 18:18
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Procurement, installation, flower paths and planting of trees of the investor UBND xã Tam Sơn.
- Winning bidder: trần thanh hùng
25/11/2024 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Tam Sơn publishes the plan Overcome the landslide point of the Route DX2 (Squirrel Scholar Score -Ong Hanh's house) The section near the pineapple bridge in Duc Phu village, Tam Son commune with 7 bidding package .
10/04/2025 10:45
UBND xã Tam Sơn publishes the plan Repair drainage ditch system and auxiliary works along DH3 route (section from Thuan Yen Dong village cultural house to in front of Thuan Yen parish church) with 5 bidding package .
29/11/2024 18:42
UBND xã Tam Sơn announced the results of the bid package Consulting on preparing Bidding Documents and evaluating Bidding Documents (Construction) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT
29/10/2024 16:52
UBND xã Tam Sơn publishes the plan Repairing the office and hall of the People's Committee of Tam Son commune with 6 bidding package .
29/10/2024 16:21
UBND xã Tam Sơn announced the results of the bid package Consultancy on appraisal of tender documents and contractor selection .
- Winning bidder: DAI BAO CONSULTING AND INVESTMENT COMPANY LIMITED
17/10/2024 19:49
UBND xã Tam Sơn announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT
17/10/2024 19:48
UBND xã Tam Sơn publishes the plan Planting trees and flowers in the commune with 3 bidding package .
17/10/2024 19:45
UBND xã Tam Sơn publishes the plan Approval of the contractor selection plan for procurement estimates: Procurement and installation of electrical and lighting systems for roads and alleys in Duc Phu and Danh Son villages with 2 bidding package .
10/09/2024 13:09
UBND xã Tam Sơn publishes the plan Contractor selection plan for Suoi Gieng Bridge project with 6 bidding package .
21/06/2024 16:07
UBND xã Tam Sơn publishes the plan Renovate and upgrade martyrs cemetery in Tam Son commune with 6 bidding package .
07/06/2024 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Civil Works of the investor UBND xã Tam Sơn.
- Winning bidder: NAVICO CONSULTING, DESIGN AND CONSTRUCTION COMPANY LIMITED
23/05/2025 10:58
Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted Tender Notice Civil Works of the investor UBND xã Tam Sơn with the form Open bidding.
18/04/2025 16:47
The Bid solicitor UBND xã Tam Sơn has posted the request Overcome the landslide point of the Route DX2 (Squirrel Scholar Score -Ong Hanh's house) The section near the pineapple bridge in Duc Phu village, Tam Son commune of the investor UBND xã Tam Sơn with 7 bidding package.
10/04/2025 10:45
Investor UBND xã Tam Sơn has posted an investment and development project Overcome the landslide point of the Road DX2 (Squirrel kindergarten point - Mr. Hanh's house) near the pineapple bridge in Duc Phu village, Tam Son commune.
10/04/2025 09:09
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Construction of the investor UBND xã Tam Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ ĐẦU TƯ PHÚ TRUNG
31/12/2024 09:28
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Construction of the investor UBND xã Tam Sơn.
- Winning bidder: CÔNG TY TNHH TỔNG HỢP XÂY DỰNG ĐỨC THÀNH
04/12/2024 14:52
Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted Tender Notice Construction of the investor UBND xã Tam Sơn with the form Open bidding.
29/11/2024 21:13
The Bid solicitor UBND xã Tam Sơn has posted the request Repair drainage ditch system and auxiliary works along DH3 route (section from Thuan Yen Dong village cultural house to in front of Thuan Yen parish church) of the investor UBND xã Tam Sơn with 5 bidding package.
29/11/2024 18:42
Investor UBND xã Tam Sơn has posted an investment and development project Repair drainage ditch system and auxiliary works along DH3 route (section from Thuan Yen Dong village cultural house to in front of Thuan Yen parish church).
29/11/2024 18:18
The Bid solicitor CÔNG TY TNHH TƯ VẤN ĐẦU TƯ KHANG THỊNH PHÁT has posted the results of the bidding package Procurement, installation, flower paths and planting of trees of the investor UBND xã Tam Sơn.
- Winning bidder: trần thanh hùng
25/11/2024 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Tam Sơn has posted 11 of the contractor selection plan, which contains 51 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Tam Sơn has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND xã Tam Sơn has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Tam Sơn has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects