Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND XÃ VĨNH HƯNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 12 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 36 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 21 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,864,680,157 VND, of which the total winning bid value is: 3,864,676,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UBND XÃ VĨNH HƯNG as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,864,680,157 VND, in which the total winning value is: 3,864,676,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND XÃ VĨNH HƯNG are as follows:
- Is the investor of 12 development investment projects.
- Is the investor of 16 contractor selection plans, of which 16 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
21/06/2025 17:44
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
21/06/2025 17:42
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
21/06/2025 17:24
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Building Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
11/06/2025 20:58
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request The plan for contractor selection phase preparation for investment projects on construction of Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune of the investor UBND XÃ VĨNH HƯNG with 2 bidding package.
11/06/2025 20:36
Investor UBND XÃ VĨNH HƯNG has posted an investment and development project Building Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune..
11/06/2025 20:20
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Mr. Con - Ong Manh, Dong Hung hamlet - Tran Nghia of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
27/04/2025 20:57
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Mr. Duong - Mr. Dong, Thanh Hung hamlet 1 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
27/04/2025 20:45
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Building Ong Nguyen bridges, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
27/04/2025 20:32
Investor UBND XÃ VĨNH HƯNG has posted an investment and development project Building Ong Nguyen Cau Bridge, Trung Hung Hamlet 2.
25/04/2025 19:19
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ VĨNH HƯNG publishes the plan Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 with 3 bidding package .
21/06/2025 17:44
UBND XÃ VĨNH HƯNG publishes the plan Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 with 3 bidding package .
21/06/2025 17:42
UBND XÃ VĨNH HƯNG publishes the plan Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 with 3 bidding package .
21/06/2025 17:24
UBND XÃ VĨNH HƯNG publishes the plan Plan for selecting construction contractors: Building Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune with 3 bidding package .
11/06/2025 20:58
UBND XÃ VĨNH HƯNG publishes the plan The plan for contractor selection phase preparation for investment projects on construction of Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune with 2 bidding package .
11/06/2025 20:36
UBND XÃ VĨNH HƯNG publishes the plan Plan for selecting construction contractors: Mr. Con - Ong Manh, Dong Hung hamlet - Tran Nghia with 3 bidding package .
27/04/2025 20:57
UBND XÃ VĨNH HƯNG publishes the plan Plan for selecting construction contractors: Mr. Duong - Mr. Dong, Thanh Hung hamlet 1 with 3 bidding package .
27/04/2025 20:45
UBND XÃ VĨNH HƯNG publishes the plan Plan for selecting construction contractors: Building Ong Nguyen bridges, Trung Hung hamlet 2 with 3 bidding package .
27/04/2025 20:32
UBND XÃ VĨNH HƯNG announced the results of the bid package Package No. 03 .
- Winning bidder: CÔNG TY TNHH MTV DỊCH VỤ THƯƠNG MẠI XÂY DỰNG HOÀNG ANH 66
03/04/2025 15:02
UBND XÃ VĨNH HƯNG announced the results of the bid package Package No. 02 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ VÀ ĐẦU TƯ XÂY DỰNG THÀNH VINH
25/03/2025 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
21/06/2025 17:44
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
21/06/2025 17:42
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan to select contract contractors: Construction of Thanh Nien Bridge route - Ong anti, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
21/06/2025 17:24
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Building Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
11/06/2025 20:58
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request The plan for contractor selection phase preparation for investment projects on construction of Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune of the investor UBND XÃ VĨNH HƯNG with 2 bidding package.
11/06/2025 20:36
Investor UBND XÃ VĨNH HƯNG has posted an investment and development project Building Tu Lu bridge, Dong Hung hamlet, Vinh Hung commune..
11/06/2025 20:20
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Mr. Con - Ong Manh, Dong Hung hamlet - Tran Nghia of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
27/04/2025 20:57
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Mr. Duong - Mr. Dong, Thanh Hung hamlet 1 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
27/04/2025 20:45
The Bid solicitor UBND XÃ VĨNH HƯNG has posted the request Plan for selecting construction contractors: Building Ong Nguyen bridges, Trung Hung hamlet 2 of the investor UBND XÃ VĨNH HƯNG with 3 bidding package.
27/04/2025 20:32
Investor UBND XÃ VĨNH HƯNG has posted an investment and development project Building Ong Nguyen Cau Bridge, Trung Hung Hamlet 2.
25/04/2025 19:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND XÃ VĨNH HƯNG has posted 16 of the contractor selection plan, which contains 36 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND XÃ VĨNH HƯNG has posted 21 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 21 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND XÃ VĨNH HƯNG has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND XÃ VĨNH HƯNG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects