Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đầm Dơi as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 29 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 887,763,681 VND, of which the total winning bid value is: 887,758,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đầm Dơi as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 887,763,681 VND, in which the total winning value is: 887,758,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân huyện Đầm Dơi are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 3 contractor selection plans, of which 3 were self-published, and 0 were published by other entities.
- Is the investor of 9 Tender Notices, of which 0 were self-invited, and 9 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package 13: Construction of Cau Kenh Cau Cau of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG CÀ MAU
28/06/2025 08:54
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package 12: Construction of Kenh Xang Bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: PHUC HAU CONSTRUCTION JOINT – STOCK COMPANY
24/06/2025 16:02
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package 15: Construction of bridge between of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: DONG HAI ADVICE INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
21/06/2025 22:54
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package No. 14: Construction of Ba Hanh Bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY TNHH MTV MINH ỨNG
21/06/2025 22:53
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package No. 16: Construction of Muoi Hoi Bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGÔ THÀNH ĐẠT
21/06/2025 22:53
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package No. 17: Construction of annual soldiers bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHƯ THỊNH
21/06/2025 22:42
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Package No. 24: Insurance costs of the annual soldier project of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:28
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Package No. 23: Cost of Muoi Hoi Cau Cau of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:26
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Bidding package 22: Cost of the demand project of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:25
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Package 21: Insurance cost of Ba Hanh bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:23
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Package No. 24: Insurance costs of the annual soldier project .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:28
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Package No. 23: Cost of Muoi Hoi Cau Cau .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:26
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Bidding package 22: Cost of the demand project .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:25
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Package 21: Insurance cost of Ba Hanh bridge .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:23
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Package No. 20: Cost of Cau Kenh Cau Cau Cau .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:20
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Bidding package 19: Cost of praying for Kenh Xang Bridge .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:18
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Survey monitoring costs .
- Winning bidder: GREEN CITY CONSTRUCTION AND INVESTMENT CONSULTANT COMPANY LIMITED
11/06/2025 15:27
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Survey of topography and geology; Economic - technical report, construction drawing design .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG CAO CƯỜNG
09/06/2025 14:32
Ủy ban nhân dân huyện Đầm Dơi publishes the plan Approving the plan to select contractors to prepare for investment in the construction project of Cau Cha is, Tran Phan commune, Dam Doi district with 3 bidding package .
03/06/2025 09:36
Ủy ban nhân dân huyện Đầm Dơi announced the results of the bid package Package No. 06: Making bidding documents and evaluating bidding documents for construction supervision package .
- Winning bidder: CÔNG TY TNHH HOÀNG PHÁT CM
27/05/2025 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package 13: Construction of Cau Kenh Cau Cau of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG CÀ MAU
28/06/2025 08:54
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package 12: Construction of Kenh Xang Bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: PHUC HAU CONSTRUCTION JOINT – STOCK COMPANY
24/06/2025 16:02
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package 15: Construction of bridge between of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: DONG HAI ADVICE INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
21/06/2025 22:54
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package No. 14: Construction of Ba Hanh Bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY TNHH MTV MINH ỨNG
21/06/2025 22:53
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package No. 16: Construction of Muoi Hoi Bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGÔ THÀNH ĐẠT
21/06/2025 22:53
The Bid solicitor Ban quản lý dự án khu vực Đầm Dơi has posted the results of the bidding package Package No. 17: Construction of annual soldiers bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHƯ THỊNH
21/06/2025 22:42
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Package No. 24: Insurance costs of the annual soldier project of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:28
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Package No. 23: Cost of Muoi Hoi Cau Cau of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:26
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Bidding package 22: Cost of the demand project of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:25
The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted the results of the bidding package Package 21: Insurance cost of Ba Hanh bridge of the investor Ủy ban nhân dân huyện Đầm Dơi.
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/06/2025 13:23
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân huyện Đầm Dơi has posted 3 of the contractor selection plan, which contains 29 of the bidding package. See full list here
Summary: The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân huyện Đầm Dơi has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân huyện Đầm Dơi has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects