Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 11 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,267,675,475 VND, of which the total winning bid value is: 1,267,674,683 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,267,675,475 VND, in which the total winning value is: 1,267,674,683 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 4 contractor selection plans, of which 4 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Repairing road behind the pond of Hung Thanh village of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: Doanh nghiệp tư nhân tư vấn đầu tư xây dựng Hoàng Mai
18/03/2025 09:29
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the request Repairing road behind the pond of Hung Thanh village of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with 1 bidding package.
17/03/2025 15:51
The Bid solicitor CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ has posted the results of the bidding package Construction work of Road and drainage system of group 7 of Hung Hoa hamlet, the last part of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH MINH TIẾN TIỀN GIANG
04/10/2024 14:48
Bid solicitor CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ has posted Tender Notice Construction work of Road and drainage system of group 7 of Hung Hoa hamlet, the last part of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with the form Competitive Offer.
06/09/2024 13:09
Bid solicitor CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ has posted Tender Notice Construction work of Road and drainage system of group 7 of Hung Hoa hamlet, the last part of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with the form Competitive Offer.
06/09/2024 10:39
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Consulting on appraisal of bidding documents and appraisal of industrial design documents of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG
23/08/2024 10:59
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
23/08/2024 10:56
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Project management consultancy of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
23/08/2024 10:54
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the request Road and drainage system of group 7 of Hung Hoa hamlet at the end of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with 6 bidding package.
23/08/2024 10:48
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package COMMERCIAL RICE PRODUCTION ACCORDING TO 1 RIGHT 5 REDUCTION COMBINED WITH PRODUCT CONSUMPTION of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
28/05/2024 11:20
The data sheet has been partially hidden, to see the full information please Login or Register
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG announced the results of the bid package Repairing road behind the pond of Hung Thanh village .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN THIẾT KẾ XÂY DỰNG THUẬN PHÁT TIỀN GIANG, Công ty TNHH XD Bất Động Sản Kim Long, Doanh nghiệp tư nhân tư vấn đầu tư xây dựng Hoàng Mai
18/03/2025 09:29
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG publishes the plan Repairing road behind the pond of Hung Thanh village with 1 bidding package .
17/03/2025 15:51
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG announced the results of the bid package Consulting on appraisal of bidding documents and appraisal of industrial design documents .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG
23/08/2024 10:59
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
23/08/2024 10:56
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
23/08/2024 10:54
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG publishes the plan Road and drainage system of group 7 of Hung Hoa hamlet at the end with 6 bidding package .
23/08/2024 10:48
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG announced the results of the bid package COMMERCIAL RICE PRODUCTION ACCORDING TO 1 RIGHT 5 REDUCTION COMBINED WITH PRODUCT CONSUMPTION .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN THƯƠNG MẠI HK
28/05/2024 11:20
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG announced the results of the bid package Construction .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG - THIẾT KẾ - THƯƠNG MẠI - DỊCH VỤ TRƯỜNG CHIÊU
28/05/2024 10:15
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG publishes the plan To Street 7, Hung Thanh, the last part with 4 bidding package .
28/05/2024 10:11
UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG publishes the plan To Street 7, Hung Thanh, the last part with 1 bidding package .
12/04/2024 11:43
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Repairing road behind the pond of Hung Thanh village of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: Doanh nghiệp tư nhân tư vấn đầu tư xây dựng Hoàng Mai
18/03/2025 09:29
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the request Repairing road behind the pond of Hung Thanh village of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with 1 bidding package.
17/03/2025 15:51
The Bid solicitor CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ has posted the results of the bidding package Construction work of Road and drainage system of group 7 of Hung Hoa hamlet, the last part of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH MINH TIẾN TIỀN GIANG
04/10/2024 14:48
Bid solicitor CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ has posted Tender Notice Construction work of Road and drainage system of group 7 of Hung Hoa hamlet, the last part of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with the form Competitive Offer.
06/09/2024 13:09
Bid solicitor CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ has posted Tender Notice Construction work of Road and drainage system of group 7 of Hung Hoa hamlet, the last part of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with the form Competitive Offer.
06/09/2024 10:39
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Consulting on appraisal of bidding documents and appraisal of industrial design documents of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG
23/08/2024 10:59
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
23/08/2024 10:56
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package Project management consultancy of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
23/08/2024 10:54
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the request Road and drainage system of group 7 of Hung Hoa hamlet at the end of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG with 6 bidding package.
23/08/2024 10:48
The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted the results of the bidding package COMMERCIAL RICE PRODUCTION ACCORDING TO 1 RIGHT 5 REDUCTION COMBINED WITH PRODUCT CONSUMPTION of the investor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG.
28/05/2024 11:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted 4 of the contractor selection plan, which contains 11 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UỶ BAN NHÂN DÂN PHƯỜNG LONG HƯNG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects