Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 13 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 19 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 741,856,500 VND, of which the total winning bid value is: 741,856,500 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 741,856,500 VND, in which the total winning value is: 741,856,500 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN are as follows:
- Is the investor of 13 development investment projects.
- Is the investor of 9 contractor selection plans, of which 7 were self-published, and 2 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Package No. 02: Consulting on evaluation of Bidding Documents and the results of selection of contractors for construction and installation of equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG 276 - THANH HÓA
08/09/2025 08:36
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Package No. 01: Consulting on making bidding doctors and evaluating Bid Bids for construction and installation of equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ VIỆT HƯNG 68
03/09/2025 09:25
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Project management consultancy .
- Winning bidder: Ban quản lý dự án đầu tư xây dựng khu vực Nghi Sơn
26/08/2025 09:52
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Package 02: Survey consultancy, preparation of economic and technical reports .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ VIỆT HƯNG 68
26/08/2025 09:49
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Repair and renovation of working offices of the Party Committee, People's Council & People's Committee of Tan Dan Ward, Thanh Hoa Province with 3 bidding package .
22/08/2025 09:50
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town with 1 bidding package .
19/08/2025 10:55
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the request Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN with 4 bidding package.
19/08/2025 10:52
Investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted an investment and development project Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town.
19/08/2025 10:10
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Upgrading the LAN system of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: VIỄN THÔNG HẢI DƯƠNG - TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
14/12/2024 17:48
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Procurement of information technology equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: HOÀNG THỊ KHANH
14/12/2024 17:40
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Package No. 02: Consulting on evaluation of Bidding Documents and the results of selection of contractors for construction and installation of equipment .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG 276 - THANH HÓA
08/09/2025 08:36
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Package No. 01: Consulting on making bidding doctors and evaluating Bid Bids for construction and installation of equipment .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ VIỆT HƯNG 68
03/09/2025 09:25
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town with 4 bidding package .
19/08/2025 10:52
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Upgrading the LAN system .
- Winning bidder: VIỄN THÔNG HẢI DƯƠNG - TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
14/12/2024 17:48
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Procurement of information technology equipment .
- Winning bidder: HOÀNG THỊ KHANH
14/12/2024 17:40
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Contractor selection plan for the package: Upgrading the LAN system for Tan Dan Ward People's Committee in 2024 with 1 bidding package .
14/12/2024 17:26
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Plan for selecting contractors to purchase information technology equipment with 1 bidding package .
14/12/2024 17:12
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Package 04: Construction supervision .
- Winning bidder: CHI LINH URBAN CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
09/11/2024 08:52
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Making signs for the Hall and one-stop house of Tan Dan Ward People's Committee .
- Winning bidder: CHI LINH URBAN CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
09/11/2024 08:49
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Shopping for curtains at Tan Dan Ward People's Committee Hall .
- Winning bidder: CHI LINH URBAN CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
09/11/2024 08:45
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Package No. 02: Consulting on evaluation of Bidding Documents and the results of selection of contractors for construction and installation of equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG 276 - THANH HÓA
08/09/2025 08:36
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Package No. 01: Consulting on making bidding doctors and evaluating Bid Bids for construction and installation of equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ VIỆT HƯNG 68
03/09/2025 09:25
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Project management consultancy .
- Winning bidder: Ban quản lý dự án đầu tư xây dựng khu vực Nghi Sơn
26/08/2025 09:52
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN announced the results of the bid package Package 02: Survey consultancy, preparation of economic and technical reports .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ ĐẦU TƯ VIỆT HƯNG 68
26/08/2025 09:49
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Repair and renovation of working offices of the Party Committee, People's Council & People's Committee of Tan Dan Ward, Thanh Hoa Province with 3 bidding package .
22/08/2025 09:50
ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN publishes the plan Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town with 1 bidding package .
19/08/2025 10:55
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the request Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN with 4 bidding package.
19/08/2025 10:52
Investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted an investment and development project Building Ngoc Linh Primary School, Ngoc Linh Commune, Nghi Son Town.
19/08/2025 10:10
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Upgrading the LAN system of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: VIỄN THÔNG HẢI DƯƠNG - TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
14/12/2024 17:48
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted the results of the bidding package Procurement of information technology equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN.
- Winning bidder: HOÀNG THỊ KHANH
14/12/2024 17:40
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted 7 of the contractor selection plan, which contains 19 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN PHƯỜNG TÂN DÂN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects