Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DAN THỊ TRẤN DI LINH as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 10 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 13 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 13 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.33 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,426,960,246 VND, of which the total winning bid value is: 9,402,941,842 VND.
- The savings rate is: 0.25%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DAN THỊ TRẤN DI LINH as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 2.33 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,426,960,246 VND, in which the total winning value is: 9,402,941,842 VND.
- The savings rate is: 0.25%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 15 contractor selection plans, of which 15 were self-published, and 0 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package Construction cost: Rural roads in the alley cluster 2, cluster 4 residential groups 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: CÔNG TY TNHH DUY NGỌC TÂN
29/05/2025 14:59
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package Construction cost: GTNT Road Alley 71 Ngo Quyen Street, Quarter 13, Di Linh Town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
29/05/2025 14:53
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request Rural roads in the alley cluster 2, cluster of 4 residential groups 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
23/05/2025 09:11
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request Rural roads in alley 71 Ngo Quyen street, residential town 13, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
23/05/2025 09:04
Investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted an investment and development project Rural roads in alley 71 Ngo Quyen street, residential town 13, Di Linh town.
22/05/2025 17:17
Investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted an investment and development project Rural roads in the alley cluster 2, cluster of 4 residential groups 2, Di Linh town.
22/05/2025 17:17
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package The cost of construction of rural roads in the cluster of 2 residential groups 20, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THẾ VỸ
09/04/2025 10:56
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package The cost of construction of rural roads is alley 2/9b of the residential group 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
09/04/2025 10:51
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request Rural roads in clusters of 2 residential groups 20, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
04/04/2025 17:03
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request The cost of construction of rural roads in alley 2/9b residential group 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
04/04/2025 16:52
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH announced the results of the bid package Construction cost: Rural roads in the alley cluster 2, cluster 4 residential groups 2, Di Linh town .
- Winning bidder: CÔNG TY TNHH DUY NGỌC TÂN
29/05/2025 14:59
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH announced the results of the bid package Construction cost: GTNT Road Alley 71 Ngo Quyen Street, Quarter 13, Di Linh Town .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
29/05/2025 14:53
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH publishes the plan Rural roads in the alley cluster 2, cluster of 4 residential groups 2, Di Linh town with 1 bidding package .
23/05/2025 09:11
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH publishes the plan Rural roads in alley 71 Ngo Quyen street, residential town 13, Di Linh town with 1 bidding package .
23/05/2025 09:04
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH announced the results of the bid package The cost of construction of rural roads in the cluster of 2 residential groups 20, Di Linh town .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THẾ VỸ
09/04/2025 10:56
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH announced the results of the bid package The cost of construction of rural roads is alley 2/9b of the residential group 2, Di Linh town .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
09/04/2025 10:51
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH publishes the plan Rural roads in clusters of 2 residential groups 20, Di Linh town with 1 bidding package .
04/04/2025 17:03
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH publishes the plan The cost of construction of rural roads in alley 2/9b residential group 2, Di Linh town with 1 bidding package .
04/04/2025 16:52
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH announced the results of the bid package Rural roads in alley 2 Nguyen Viet Xuan Quarter 16, Di Linh town .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
28/03/2025 14:38
ỦY BAN NHÂN DAN THỊ TRẤN DI LINH announced the results of the bid package The cost of construction of rural roads in the alley cluster 3 residential groups 12, Di Linh town .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
28/03/2025 14:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package Construction cost: Rural roads in the alley cluster 2, cluster 4 residential groups 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: CÔNG TY TNHH DUY NGỌC TÂN
29/05/2025 14:59
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package Construction cost: GTNT Road Alley 71 Ngo Quyen Street, Quarter 13, Di Linh Town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
29/05/2025 14:53
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request Rural roads in the alley cluster 2, cluster of 4 residential groups 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
23/05/2025 09:11
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request Rural roads in alley 71 Ngo Quyen street, residential town 13, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
23/05/2025 09:04
Investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted an investment and development project Rural roads in alley 71 Ngo Quyen street, residential town 13, Di Linh town.
22/05/2025 17:17
Investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted an investment and development project Rural roads in the alley cluster 2, cluster of 4 residential groups 2, Di Linh town.
22/05/2025 17:17
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package The cost of construction of rural roads in the cluster of 2 residential groups 20, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG THẾ VỸ
09/04/2025 10:56
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the results of the bidding package The cost of construction of rural roads is alley 2/9b of the residential group 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN LONG THẢO
09/04/2025 10:51
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request Rural roads in clusters of 2 residential groups 20, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
04/04/2025 17:03
The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted the request The cost of construction of rural roads in alley 2/9b residential group 2, Di Linh town of the investor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH with 1 bidding package.
04/04/2025 16:52
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted 15 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted 3 Tender Notices in 3 bidding packages. Among these, 3 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has posted 13 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 13 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DAN THỊ TRẤN DI LINH has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects