Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Đại Đồng as follows:
- Has relationships with 1 project owners.
- Has relationships with 21 contractor.
- Announced 10 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 30 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 13 packages (with 14 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 22 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 17 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.18 contractors.
- Breakdown by bidding field: Goods 28.57%, Construction 71.43%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 64,528,814,306 VND, of which the total winning bid value is: 64,263,705,000 VND.
- The savings rate is: 0.41%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Đại Đồng as follows:
- Has relationships with 21 contractor.
- The average number of contractors participating in each bidding package is: 1.18 contractors.
- Proportion of bidding fields: Goods 28.57%, Construction 71.43%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 64,528,814,306 VND, in which the total winning value is: 64,263,705,000 VND.
- The savings rate is: 0.41%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Đại Đồng are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 8 contractor selection plans, of which 8 were self-published, and 0 were published by other entities.
- Is the investor of 14 Tender Notices, of which 14 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Tender package No 03: Construction of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: MINH TRI CONSTRUCTION JOINT STOCK COMPANY
28/03/2025 09:18
Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted Tender Notice Tender package No 03: Construction of the investor Ủy ban nhân dân xã Đại Đồng with the form Open bidding.
15/03/2025 17:08
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the request Construction and renovation of water drainage roads in village 6, Dai Dong commune of the investor Ủy ban nhân dân xã Đại Đồng with 4 bidding package.
14/03/2025 09:41
Investor Ủy ban nhân dân xã Đại Đồng has posted an investment and development project Construction and renovation of water drainage roads in village 6, Dai Dong commune.
14/03/2025 09:09
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Package 04: Construction and equipment procurement and installation of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: 389 HA NOI DEVELOPMENT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
24/10/2024 14:36
Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted Tender Notice Package 04: Construction and equipment procurement and installation of the investor Ủy ban nhân dân xã Đại Đồng with the form Open bidding.
19/09/2024 17:16
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the request Plan for selecting contractors for the project implementation phase: New construction of the headquarters of the Military Command of Dai Dong commune of the investor Ủy ban nhân dân xã Đại Đồng with 7 bidding package.
08/09/2024 11:53
Investor Ủy ban nhân dân xã Đại Đồng has posted an investment and development project New construction of the headquarters of the Military Command of Dai Dong commune.
19/08/2024 14:14
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Package 03: Supervision of construction and equipment installation of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: HOANG HUY TECHNOLOGY SERVICE AND CONSTRUCTION JOINT STOCK COMPANY
29/06/2024 22:04
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Package 02: Construction, procurement and installation of equipment of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: NHAT DUONG JOINT STOCK COMPANY
29/06/2024 22:00
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Đại Đồng announced the results of the bid package Tender package No 03: Construction .
- Winning bidder: CONG TRINH VIET CONSTRUCTION & CONSULTANT COMPANY LIMITED, MINH TRI CONSTRUCTION JOINT STOCK COMPANY
28/03/2025 09:18
Ủy ban nhân dân xã Đại Đồng announced the results of the bidding package Tender package No 03: Construction with 1 participating contractors .
24/03/2025 15:06
Ủy ban nhân dân xã Đại Đồng publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
15/03/2025 17:08
Ủy ban nhân dân xã Đại Đồng publishes the plan Construction and renovation of water drainage roads in village 6, Dai Dong commune with 4 bidding package .
14/03/2025 09:41
Ủy ban nhân dân xã Đại Đồng announced the results of the bid package Package 04: Construction and equipment procurement and installation .
- Winning bidder: Tay ho XD va TM joint stock company, 389 HA NOI DEVELOPMENT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
24/10/2024 14:36
Ủy ban nhân dân xã Đại Đồng announced the results of the bidding package Package 04: Construction and equipment procurement and installation with 1 participating contractors .
30/09/2024 10:15
Ủy ban nhân dân xã Đại Đồng publishes Tender Notice Package 04: Construction and equipment procurement and installation in the form Open bidding .
19/09/2024 17:16
Ủy ban nhân dân xã Đại Đồng publishes the plan Plan for selecting contractors for the project implementation phase: New construction of the headquarters of the Military Command of Dai Dong commune with 7 bidding package .
08/09/2024 11:53
Ủy ban nhân dân xã Đại Đồng announced the results of the bid package Package 03: Supervision of construction and equipment installation .
- Winning bidder: Tay ho XD va TM joint stock company, HOANG HUY TECHNOLOGY SERVICE AND CONSTRUCTION JOINT STOCK COMPANY
29/06/2024 22:04
Ủy ban nhân dân xã Đại Đồng announced the results of the bid package Package 02: Construction, procurement and installation of equipment .
- Winning bidder: SONG TICH TRADING AND CONSTRUCTION JOINT STOCK COMPANY, NHAT DUONG JOINT STOCK COMPANY
29/06/2024 22:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Tender package No 03: Construction of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: MINH TRI CONSTRUCTION JOINT STOCK COMPANY
28/03/2025 09:18
Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted Tender Notice Tender package No 03: Construction of the investor Ủy ban nhân dân xã Đại Đồng with the form Open bidding.
15/03/2025 17:08
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the request Construction and renovation of water drainage roads in village 6, Dai Dong commune of the investor Ủy ban nhân dân xã Đại Đồng with 4 bidding package.
14/03/2025 09:41
Investor Ủy ban nhân dân xã Đại Đồng has posted an investment and development project Construction and renovation of water drainage roads in village 6, Dai Dong commune.
14/03/2025 09:09
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Package 04: Construction and equipment procurement and installation of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: 389 HA NOI DEVELOPMENT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
24/10/2024 14:36
Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted Tender Notice Package 04: Construction and equipment procurement and installation of the investor Ủy ban nhân dân xã Đại Đồng with the form Open bidding.
19/09/2024 17:16
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the request Plan for selecting contractors for the project implementation phase: New construction of the headquarters of the Military Command of Dai Dong commune of the investor Ủy ban nhân dân xã Đại Đồng with 7 bidding package.
08/09/2024 11:53
Investor Ủy ban nhân dân xã Đại Đồng has posted an investment and development project New construction of the headquarters of the Military Command of Dai Dong commune.
19/08/2024 14:14
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Package 03: Supervision of construction and equipment installation of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: HOANG HUY TECHNOLOGY SERVICE AND CONSTRUCTION JOINT STOCK COMPANY
29/06/2024 22:04
The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted the results of the bidding package Package 02: Construction, procurement and installation of equipment of the investor Ủy ban nhân dân xã Đại Đồng.
- Winning bidder: NHAT DUONG JOINT STOCK COMPANY
29/06/2024 22:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Đại Đồng has posted 9 of the contractor selection plan, which contains 30 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted 14 Tender Notices in 13 bidding packages. Among these, 13 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Đại Đồng has posted 22 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 22 package, canceled the bid 0 package (among the bidding packages above).
- There are 8 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Đại Đồng has a relationship with 21 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Đại Đồng has a relationship with 20 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Đại Đồng has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects