Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN as follows:
- Has relationships with 3 project owners.
- Has relationships with 10 contractor.
- Announced 9 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 33 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 23 packages that have not fully posted the contractor selection results. Of these 23 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 27,278,775,360 VND, of which the total winning bid value is: 27,239,530,000 VND.
- The savings rate is: 0.14%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 27,278,775,360 VND, in which the total winning value is: 27,239,530,000 VND.
- The savings rate is: 0.14%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN are as follows:
- Is the investor of 9 development investment projects.
- Is the investor of 27 contractor selection plans, of which 1 were self-published, and 26 were published by other entities.
- Is the investor of 6 Tender Notices, of which 1 were self-invited, and 5 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes Tender Notice Procurement Tender package No 03: Construction; supply and installation of construction equipment in the form Open bidding .
25/08/2026 18:10
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bidding package No. 02: Appraisal of bidding documents and LCNT results for construction and installation .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ TƯ VẤN XÂY DỰNG ĐỒNG TÂM
18/08/2026 22:00
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bidding package No. 01: Preparation of bidding documents, evaluation of bidding documents for construction and installation packages .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẠ TẦNG 668
18/08/2026 21:58
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes the plan Construction plan for the contractor selection phase of the project: Construction of a three-story, ten-classroom building and an administrative building; renovation and repair of an eight-classroom, two-story building and associated facilities at Dong Thang Primary School, Dong Tien Village, Thanh Hoa Province. with 6 bidding package .
18/08/2026 21:56
Investor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has posted an investment and development project Construction of a three-story, ten-classroom school building and an administrative office; renovation and repair of an eight-classroom, two-story school building and associated facilities at Dong Thang Primary School, Dong Tien Village, Thanh Hoa Province..
18/08/2026 21:21
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes Tender Notice Procurement Tender package No 03: Construction; supply and installation of construction equipment in the form Open bidding .
18/08/2026 18:36
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bid No. 6: Assessment of the current condition of existing structures .
- Winning bidder: CÔNG TY CP TƯ VẤN KIỂM ĐỊNH XÂY DỰNG VÀ MÔI TRƯỜNG HỒNG ĐỨC
06/08/2026 15:15
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Package 3: Survey supervision consultant .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NGÂN ANH
06/08/2026 15:13
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bid No. 2: Consulting for site survey, master plan development, and preparation of an economic-technical report. .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TÂY THÀNH
06/08/2026 15:11
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Procurement Package No. 4: Technical and Economic Assessment Report Consulting .
- Winning bidder: Công ty TNHH Tư vấn Đầu tư xây dựng công trình Đồng Tiến HH
06/08/2026 15:09
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Package No. 05: Construction supervision consultancy .
- Winning bidder: Công ty cổ phần kinh doanh bất động sản Đất Vàng
31/07/2024 14:25
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Package 04: Project management consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG HÒA BÌNH JSC
31/07/2024 14:23
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bidding package No. 02: Consulting on appraisal of bidding documents .
- Winning bidder: HOANG THE C&T COMPANY LIMITED
31/07/2024 14:20
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Package No. 01: Bidding consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ADZ
31/07/2024 14:18
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Tender package No 03: Construction work .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI ĐỒNG LỢI
31/07/2024 14:15
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bidding package Tender package No 03: Construction work with 1 participating contractors .
18/07/2024 08:04
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes Tender Notice Tender package No 03: Construction work in the form Open bidding .
09/07/2024 10:39
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes the plan Construction contractor selection plan: Route from TL. 517 to the city connection road. Thanh Hoa with Nghi Son - Sao Vang road, Phuc Am village, Dong Tien commune, Trieu Son district with 6 bidding package .
09/07/2024 09:30
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Civil Works .
- Winning bidder: Công ty Cổ phần xây dựng VACIC
26/07/2022 15:46
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bidding package Civil Works with 1 participating contractors .
25/12/2020 08:00
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes Tender Notice Procurement Tender package No 03: Construction; supply and installation of construction equipment in the form Open bidding .
25/08/2026 18:10
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bidding package No. 02: Appraisal of bidding documents and LCNT results for construction and installation .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ TƯ VẤN XÂY DỰNG ĐỒNG TÂM
18/08/2026 22:00
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bidding package No. 01: Preparation of bidding documents, evaluation of bidding documents for construction and installation packages .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẠ TẦNG 668
18/08/2026 21:58
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes the plan Construction plan for the contractor selection phase of the project: Construction of a three-story, ten-classroom building and an administrative building; renovation and repair of an eight-classroom, two-story building and associated facilities at Dong Thang Primary School, Dong Tien Village, Thanh Hoa Province. with 6 bidding package .
18/08/2026 21:56
Investor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has posted an investment and development project Construction of a three-story, ten-classroom school building and an administrative office; renovation and repair of an eight-classroom, two-story school building and associated facilities at Dong Thang Primary School, Dong Tien Village, Thanh Hoa Province..
18/08/2026 21:21
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN publishes Tender Notice Procurement Tender package No 03: Construction; supply and installation of construction equipment in the form Open bidding .
18/08/2026 18:36
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bid No. 6: Assessment of the current condition of existing structures .
- Winning bidder: CÔNG TY CP TƯ VẤN KIỂM ĐỊNH XÂY DỰNG VÀ MÔI TRƯỜNG HỒNG ĐỨC
06/08/2026 15:15
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Package 3: Survey supervision consultant .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NGÂN ANH
06/08/2026 15:13
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Bid No. 2: Consulting for site survey, master plan development, and preparation of an economic-technical report. .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TÂY THÀNH
06/08/2026 15:11
ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN announced the results of the bid package Procurement Package No. 4: Technical and Economic Assessment Report Consulting .
- Winning bidder: Công ty TNHH Tư vấn Đầu tư xây dựng công trình Đồng Tiến HH
06/08/2026 15:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has posted 7 of the contractor selection plan, which contains 33 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has posted 7 Tender Notices in 6 bidding packages. Among these, 1 Tender Notices were self-invited, and 6 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ ĐỒNG TIẾN has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects