Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ KỲ KHANG as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ KỲ KHANG as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ KỲ KHANG are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 13 contractor selection plans, of which 0 were self-published, and 13 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
ỦY BAN NHÂN DÂN XÃ KỲ KHANG publishes the plan Plan to select contractors for the project of upgrading roads in Hoang Du village from Song Rac canal to Du Thanh Church with 8 bidding package .
15/04/2026 16:21
Investor ỦY BAN NHÂN DÂN XÃ KỲ KHANG has posted an investment and development project Upgrading roads in Hoang Du village from Song Rac canal to Du Thanh Church.
15/04/2026 16:16
ỦY BAN NHÂN DÂN XÃ KỲ KHANG publishes the plan Plan to select contractors for the project of upgrading roads in Hoang Du village from Song Rac canal to Du Thanh Church with 8 bidding package .
24/03/2026 17:07
Investor ỦY BAN NHÂN DÂN XÃ KỲ KHANG has posted an investment and development project Upgrading roads in Hoang Du village from Song Rac canal to Du Thanh Church.
24/03/2026 16:16
ỦY BAN NHÂN DÂN XÃ KỲ KHANG announced the results of the bid package Making canvas frames, signs, banners, propaganda slogans for the election of National Assembly Deputies and People's Councils at all levels for the 2026-2031 term .
- Winning bidder: CÔNG TY TNHH TỔNG HỢP ẤN TƯỢNG
13/03/2026 20:30
ỦY BAN NHÂN DÂN XÃ KỲ KHANG publishes the plan Making canvas frames, signs, banners, propaganda slogans for the election of National Assembly Deputies and People's Councils at all levels for the 2026-2031 term with 1 bidding package .
10/03/2026 18:42
ỦY BAN NHÂN DÂN XÃ KỲ KHANG announced the results of the bid package Repairing Phu Thuong village hall .
- Winning bidder: Công ty TNHH xây dựng CBRC
29/12/2025 08:33
ỦY BAN NHÂN DÂN XÃ KỲ KHANG announced the results of the bid package Repairing martyrs' cemetery in Ky Anh district .
- Winning bidder: CÔNG TY TNHH XD VÀ THƯƠNG MẠI PHÚ MINH
29/12/2025 08:31
ỦY BAN NHÂN DÂN XÃ KỲ KHANG announced the results of the bid package Repair Ky Khang medical station .
- Winning bidder: NHAT TAN CONSULTING AND CONSTRUCTION JSC
29/12/2025 08:22
ỦY BAN NHÂN DÂN XÃ KỲ KHANG announced the results of the bid package 02-MSGL: Procurement of rice seeds for the Spring 2026 crop .
- Winning bidder: TCH TRADING AGRICULTURAL PRODUCTS AND MANUFACTURING COMPANY LIMITED
26/12/2025 14:18
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ KỲ KHANG has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ KỲ KHANG has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects