Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ NA NGOI as follows:
- Has relationships with 2 project owners.
- Has relationships with 5 contractor.
- Announced 7 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 23 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 14 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,275,365,000 VND, of which the total winning bid value is: 1,275,365,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ NA NGOI as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,275,365,000 VND, in which the total winning value is: 1,275,365,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ NA NGOI are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 23 contractor selection plans, of which 5 were self-published, and 18 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor ỦY BAN NHÂN DÂN XÃ NA NGOI has posted an investment and development project Repairing roads from the intersection of Road 543D to the villages
Nam Khien 1,2, Na Ngoi commune from Km 0+00 to Km3+00.
16/03/2026 10:10
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing works on the route from the intersection of Road 543D to Huoi Thum village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:24
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing roads from the intersection of Road 543D to Huoi Thum village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:21
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing the transmission line of Khe Na spillway bridge, Tang Phan village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:08
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing the iron bridge transmission line over Ka Nan stream in Huoi Thum village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:03
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repair the road from Phu Quac 1 village to Phu Quac 2 villages and Na Ngoi commune with 1 bidding package .
11/12/2025 16:51
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repair the road from Na Cang village to Phu Quac 1 village and Na Ngoi commune with 1 bidding package .
11/12/2025 16:47
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing roads from the intersection of Road 543D to Nam Khien 1, 2 villages and Na Ngoi commune from Km3+00 to Km5+850 with 1 bidding package .
11/12/2025 16:41
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing roads from the intersection of Road 543D to Nam Khien 1, 2 and Na Ngoi communes from Km0+00 to Km3+00 with 1 bidding package .
11/12/2025 16:33
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Upgrading and repairing irrigation works in Keo Bac village, Na Ngoi commune with 1 bidding package .
11/12/2025 16:26
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Project contractor selection plan: Construction of rural market in Na Ngoi commune, Ky Son district with 4 bidding package .
09/07/2024 12:24
ỦY BAN NHÂN DÂN XÃ NA NGOI announced the results of the bid package Project management .
- Winning bidder: Ban quản lý các dự án ĐTXD huyện Kỳ Sơn, tỉnh Nghệ An
08/05/2024 09:09
ỦY BAN NHÂN DÂN XÃ NA NGOI announced the results of the bid package The whole construction part .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY LẮP THÀNH ĐẠT
08/05/2024 09:08
ỦY BAN NHÂN DÂN XÃ NA NGOI announced the results of the bid package Construction supervision .
- Winning bidder: MOC NHIEN CONSTRUCTION AND INVESTMENT CONSULTING COMPANY LIMITED
08/05/2024 09:06
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Project contractor selection plan: Construction of irrigation works in Phu Kha 2 village, Na Ngoi commune, Ky Son district with 3 bidding package .
08/05/2024 09:05
ỦY BAN NHÂN DÂN XÃ NA NGOI announced the results of the bid package Survey and prepare technical reports .
- Winning bidder: MIEN TRUNG 1 CONSTRUCTION INVESTMENT JTOCK COMPANY
08/05/2024 08:53
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Plan for selecting a contractor for the consulting package for surveying and preparing the project's technical and economic feasibility report: Construction of irrigation project in Phu Kha 2 village, Na Ngoi commune, Ky Son district with 1 bidding package .
08/05/2024 08:50
ỦY BAN NHÂN DÂN XÃ NA NGOI announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: MIEN TRUNG 1 CONSTRUCTION INVESTMENT JTOCK COMPANY
20/09/2023 16:30
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Consulting package for surveying and preparing economic and technical reports for construction of rural roads from Phu Quac 3 intersection to Huoi Xai village, Na Ngoi commune, Ky Son district with 1 bidding package .
20/09/2023 16:27
ỦY BAN NHÂN DÂN XÃ NA NGOI announced the results of the bid package Construction supervision. .
- Winning bidder: CÔNG TY CP ĐẦU TƯ XÂY DỰNG ANH KHANG NGHỆ AN
20/09/2023 15:54
The data sheet has been partially hidden, to see the full information please Login or Register
Investor ỦY BAN NHÂN DÂN XÃ NA NGOI has posted an investment and development project Repairing roads from the intersection of Road 543D to the villages
Nam Khien 1,2, Na Ngoi commune from Km 0+00 to Km3+00.
16/03/2026 10:10
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing works on the route from the intersection of Road 543D to Huoi Thum village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:24
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing roads from the intersection of Road 543D to Huoi Thum village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:21
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing the transmission line of Khe Na spillway bridge, Tang Phan village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:08
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing the iron bridge transmission line over Ka Nan stream in Huoi Thum village, Na Ngoi commune with 1 bidding package .
11/12/2025 17:03
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repair the road from Phu Quac 1 village to Phu Quac 2 villages and Na Ngoi commune with 1 bidding package .
11/12/2025 16:51
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repair the road from Na Cang village to Phu Quac 1 village and Na Ngoi commune with 1 bidding package .
11/12/2025 16:47
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing roads from the intersection of Road 543D to Nam Khien 1, 2 villages and Na Ngoi commune from Km3+00 to Km5+850 with 1 bidding package .
11/12/2025 16:41
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Repairing roads from the intersection of Road 543D to Nam Khien 1, 2 and Na Ngoi communes from Km0+00 to Km3+00 with 1 bidding package .
11/12/2025 16:33
ỦY BAN NHÂN DÂN XÃ NA NGOI publishes the plan Upgrading and repairing irrigation works in Keo Bac village, Na Ngoi commune with 1 bidding package .
11/12/2025 16:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XÃ NA NGOI has posted 8 of the contractor selection plan, which contains 23 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ NA NGOI has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ NA NGOI has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ NA NGOI has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ NA NGOI has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects