Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Nghi Long as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 21 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 26,768,000 VND, of which the total winning bid value is: 26,768,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Nghi Long as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 26,768,000 VND, in which the total winning value is: 26,768,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân xã Nghi Long are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 5 contractor selection plans, of which 4 were self-published, and 1 were published by other entities.
- Is the investor of 4 Tender Notices, of which 0 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468 has posted the results of the bidding package The entire construction and installation part of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: CÔNG TY CP HC MINH ĐẠT
18/09/2024 20:39
Bid solicitor CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468 has posted Tender Notice The entire construction and installation part of the investor Uỷ ban nhân dân xã Nghi Long with the form Open bidding.
18/06/2024 23:30
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the results of the bidding package Consulting on preparing E-HSYC, evaluating E-HSMT of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468
18/06/2024 21:04
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the results of the bidding package Consulting on E-HSMT appraisal and E-HSMT evaluation results of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: Công ty cổ phần đầu tư phát triển SUNRISE GROUP
18/06/2024 21:02
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the request Build and upgrade the route north of Vinh Long Village from National Highway 1A to Hai Pagoda field in Nghi Long commune of the investor Uỷ ban nhân dân xã Nghi Long with 5 bidding package.
18/06/2024 20:57
Investor Uỷ ban nhân dân xã Nghi Long has posted an investment and development project Build and upgrade the route north of Vinh Long Village from National Highway 1A to Hai Pagoda field in Nghi Long commune.
18/06/2024 20:20
The Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted the results of the bidding package Package No. 01: The whole construction part of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: CÔNG TY CP THIẾT KẾ & XÂY DỰNG TRƯỜNG LỘC
23/05/2024 14:13
Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted Tender Notice Tender package No 01: The whole construction part of the investor Uỷ ban nhân dân xã Nghi Long with the form Competitive Offer.
05/05/2024 20:28
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the request Project planning and design: Construction of multi-functional houses and auxiliary works for Nghi Long Commune Secondary School of the investor Uỷ ban nhân dân xã Nghi Long with 5 bidding package.
25/04/2024 08:15
Investor Uỷ ban nhân dân xã Nghi Long has posted an investment and development project Construction of multi-functional houses and auxiliary works for Nghi Long Commune Secondary School.
25/04/2024 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã Nghi Long announced the results of the bid package Consulting on preparing E-HSYC, evaluating E-HSMT .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468
18/06/2024 21:04
Uỷ ban nhân dân xã Nghi Long announced the results of the bid package Consulting on E-HSMT appraisal and E-HSMT evaluation results .
- Winning bidder: Công ty cổ phần đầu tư phát triển SUNRISE GROUP
18/06/2024 21:02
Uỷ ban nhân dân xã Nghi Long publishes the plan Build and upgrade the route north of Vinh Long Village from National Highway 1A to Hai Pagoda field in Nghi Long commune with 5 bidding package .
18/06/2024 20:57
Uỷ ban nhân dân xã Nghi Long publishes the plan Project planning and design: Construction of multi-functional houses and auxiliary works for Nghi Long Commune Secondary School with 5 bidding package .
25/04/2024 08:15
Uỷ ban nhân dân xã Nghi Long publishes the plan Project contractor selection plan: Construction of Medical Station in Nghi Long commune, Nghi Loc district, Nghe An province with 5 bidding package .
27/11/2023 11:12
Uỷ ban nhân dân xã Nghi Long publishes Tender Notice The entire construction and installation part (Including the cost of general items and 10% of construction and installation provision) in the form National Competitive Bidding .
24/09/2016 08:58
Uỷ ban nhân dân xã Nghi Long publishes the plan Construction of a 4-room classroom and ancillary works for Kindergarten in Nghi Long commune, Nghi Loc district with 6 bidding package .
22/09/2016 11:44
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468 has posted the results of the bidding package The entire construction and installation part of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: CÔNG TY CP HC MINH ĐẠT
18/09/2024 20:39
Bid solicitor CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468 has posted Tender Notice The entire construction and installation part of the investor Uỷ ban nhân dân xã Nghi Long with the form Open bidding.
18/06/2024 23:30
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the results of the bidding package Consulting on preparing E-HSYC, evaluating E-HSMT of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG 468
18/06/2024 21:04
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the results of the bidding package Consulting on E-HSMT appraisal and E-HSMT evaluation results of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: Công ty cổ phần đầu tư phát triển SUNRISE GROUP
18/06/2024 21:02
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the request Build and upgrade the route north of Vinh Long Village from National Highway 1A to Hai Pagoda field in Nghi Long commune of the investor Uỷ ban nhân dân xã Nghi Long with 5 bidding package.
18/06/2024 20:57
Investor Uỷ ban nhân dân xã Nghi Long has posted an investment and development project Build and upgrade the route north of Vinh Long Village from National Highway 1A to Hai Pagoda field in Nghi Long commune.
18/06/2024 20:20
The Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted the results of the bidding package Package No. 01: The whole construction part of the investor Uỷ ban nhân dân xã Nghi Long.
- Winning bidder: CÔNG TY CP THIẾT KẾ & XÂY DỰNG TRƯỜNG LỘC
23/05/2024 14:13
Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted Tender Notice Tender package No 01: The whole construction part of the investor Uỷ ban nhân dân xã Nghi Long with the form Competitive Offer.
05/05/2024 20:28
The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted the request Project planning and design: Construction of multi-functional houses and auxiliary works for Nghi Long Commune Secondary School of the investor Uỷ ban nhân dân xã Nghi Long with 5 bidding package.
25/04/2024 08:15
Investor Uỷ ban nhân dân xã Nghi Long has posted an investment and development project Construction of multi-functional houses and auxiliary works for Nghi Long Commune Secondary School.
25/04/2024 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân xã Nghi Long has posted 4 of the contractor selection plan, which contains 21 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Nghi Long has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân xã Nghi Long has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân xã Nghi Long has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects