Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XA NÙNG NÀNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 12 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 559,122,000 VND, of which the total winning bid value is: 553,270,000 VND.
- The savings rate is: 1.05%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XA NÙNG NÀNG as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 559,122,000 VND, in which the total winning value is: 553,270,000 VND.
- The savings rate is: 1.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 8 contractor selection plans, of which 8 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request The decision to approve the construction dossier and the plan to select the contractor to build the model: Building San San 3 "bright, blue, clean, beautiful and safe" In 2025, Nung Co commune, Tam Duong district, Lai Chau province of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
14/03/2025 15:44
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision on approving the contractor selection plan to implement the project: Repairing and upgrading cultural houses of Nung Co commune, Tam Duong district, Lai Chau province of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
10/03/2025 15:39
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision on approving the plan to select a contractor to carry out the project: Building a road to the production area of Nung Nang village, Nung Nang commune, Tam Duong district (Nung Nang - Nam Tam road to the production area of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
17/01/2025 16:03
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision approving the plan to select a contractor to carry out the project: Building concrete roads in Lao Ty Phung village, Nung Nang commune, Tam Duong district, Lai Chau province of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
17/01/2025 15:52
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the results of the bidding package Procurement of performance costumes for the Mong Khen Club of Xi Mien Khan village and typical mass performance teams of Chin Chu Chai, Say San 1, Say San 3, Xi Mien Khan villages in Nung Nang commune under the project 6 Preserve and promote fine traditional cultural values of ethnic minorities associated with tourism development of the National Target Program for Socio-Economic Development of Ethnic Minority and Mountainous Areas by 2024 of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG.
- Winning bidder: Sùng Thị De
10/12/2024 10:35
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision to approve the contractor selection plan for the package: Procurement of performance costumes to serve the Mong Khen Club of Xi Mien Khan village and typical mass performance teams of Chin Chu Chai, Say San 1, Say San 3, Xi Mien Khan, Nung Nang commune under project 6 Preserving and promoting good traditional cultural values of ethnic minorities associated with tourism development of the National Target Program for Regional Socio-Economic Development ethnic minorities numbers and mountainous areas in 2024 of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
06/12/2024 09:58
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision approving construction documents and plans to select construction contractors: Repairing and upgrading auxiliary items of the gymnasium in Nung Nang commune, Tam Duong district of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
01/08/2024 15:25
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the results of the bidding package Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG.
- Winning bidder: TRUNG TÂM THIẾT BỊ MÁY VĂN PHÒNG SHARP 1
04/01/2024 10:30
Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted Tender Notice Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with the form Competitive Offer.
19/12/2023 21:49
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision approving the cost estimate and planning for implementation of the bidding package: Procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program for New Citizen Construction in Nung Nang commune of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
18/12/2023 17:23
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes the plan The decision to approve the construction dossier and the plan to select the contractor to build the model: Building San San 3 "bright, blue, clean, beautiful and safe" In 2025, Nung Co commune, Tam Duong district, Lai Chau province with 1 bidding package .
14/03/2025 15:44
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes the plan Decision on approving the contractor selection plan to implement the project: Repairing and upgrading cultural houses of Nung Co commune, Tam Duong district, Lai Chau province with 1 bidding package .
10/03/2025 15:39
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes the plan Decision on approving the plan to select a contractor to carry out the project: Building a road to the production area of Nung Nang village, Nung Nang commune, Tam Duong district (Nung Nang - Nam Tam road to the production area with 1 bidding package .
17/01/2025 16:03
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes the plan Decision approving the plan to select a contractor to carry out the project: Building concrete roads in Lao Ty Phung village, Nung Nang commune, Tam Duong district, Lai Chau province with 1 bidding package .
17/01/2025 15:52
ỦY BAN NHÂN DÂN XA NÙNG NÀNG announced the results of the bid package Procurement of performance costumes for the Mong Khen Club of Xi Mien Khan village and typical mass performance teams of Chin Chu Chai, Say San 1, Say San 3, Xi Mien Khan villages in Nung Nang commune under the project 6 Preserve and promote fine traditional cultural values of ethnic minorities associated with tourism development of the National Target Program for Socio-Economic Development of Ethnic Minority and Mountainous Areas by 2024 .
- Winning bidder: Sùng Thị De
10/12/2024 10:35
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes the plan Decision to approve the contractor selection plan for the package: Procurement of performance costumes to serve the Mong Khen Club of Xi Mien Khan village and typical mass performance teams of Chin Chu Chai, Say San 1, Say San 3, Xi Mien Khan, Nung Nang commune under project 6 Preserving and promoting good traditional cultural values of ethnic minorities associated with tourism development of the National Target Program for Regional Socio-Economic Development ethnic minorities numbers and mountainous areas in 2024 with 1 bidding package .
06/12/2024 09:58
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes the plan Decision approving construction documents and plans to select construction contractors: Repairing and upgrading auxiliary items of the gymnasium in Nung Nang commune, Tam Duong district with 1 bidding package .
01/08/2024 15:25
ỦY BAN NHÂN DÂN XA NÙNG NÀNG announced the results of the bid package Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune .
- Winning bidder: TRUNG TÂM THIẾT BỊ MÁY VĂN PHÒNG SHARP 1
04/01/2024 10:30
ỦY BAN NHÂN DÂN XA NÙNG NÀNG announced the results of the bidding package Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune with 1 participating contractors .
26/12/2023 16:11
ỦY BAN NHÂN DÂN XA NÙNG NÀNG publishes Tender Notice Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune in the form Competitive Offer .
19/12/2023 21:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request The decision to approve the construction dossier and the plan to select the contractor to build the model: Building San San 3 "bright, blue, clean, beautiful and safe" In 2025, Nung Co commune, Tam Duong district, Lai Chau province of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
14/03/2025 15:44
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision on approving the contractor selection plan to implement the project: Repairing and upgrading cultural houses of Nung Co commune, Tam Duong district, Lai Chau province of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
10/03/2025 15:39
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision on approving the plan to select a contractor to carry out the project: Building a road to the production area of Nung Nang village, Nung Nang commune, Tam Duong district (Nung Nang - Nam Tam road to the production area of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
17/01/2025 16:03
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision approving the plan to select a contractor to carry out the project: Building concrete roads in Lao Ty Phung village, Nung Nang commune, Tam Duong district, Lai Chau province of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
17/01/2025 15:52
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the results of the bidding package Procurement of performance costumes for the Mong Khen Club of Xi Mien Khan village and typical mass performance teams of Chin Chu Chai, Say San 1, Say San 3, Xi Mien Khan villages in Nung Nang commune under the project 6 Preserve and promote fine traditional cultural values of ethnic minorities associated with tourism development of the National Target Program for Socio-Economic Development of Ethnic Minority and Mountainous Areas by 2024 of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG.
- Winning bidder: Sùng Thị De
10/12/2024 10:35
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision to approve the contractor selection plan for the package: Procurement of performance costumes to serve the Mong Khen Club of Xi Mien Khan village and typical mass performance teams of Chin Chu Chai, Say San 1, Say San 3, Xi Mien Khan, Nung Nang commune under project 6 Preserving and promoting good traditional cultural values of ethnic minorities associated with tourism development of the National Target Program for Regional Socio-Economic Development ethnic minorities numbers and mountainous areas in 2024 of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
06/12/2024 09:58
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision approving construction documents and plans to select construction contractors: Repairing and upgrading auxiliary items of the gymnasium in Nung Nang commune, Tam Duong district of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
01/08/2024 15:25
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the results of the bidding package Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG.
- Winning bidder: TRUNG TÂM THIẾT BỊ MÁY VĂN PHÒNG SHARP 1
04/01/2024 10:30
Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted Tender Notice Bidding package for procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program to build new rural areas in Nung Nang commune of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with the form Competitive Offer.
19/12/2023 21:49
The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted the request Decision approving the cost estimate and planning for implementation of the bidding package: Procurement of equipment to serve the institutions of commune cultural houses and cultural houses of villages under the National Target Program for New Citizen Construction in Nung Nang commune of the investor ỦY BAN NHÂN DÂN XA NÙNG NÀNG with 1 bidding package.
18/12/2023 17:23
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted 12 of the contractor selection plan, which contains 12 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XA NÙNG NÀNG has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XA NÙNG NÀNG has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects