Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Tam Anh Bắc as follows:
- Has relationships with 3 contractor.
- Announced 16 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 73 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 59 packages that have not fully posted the contractor selection results. Of these 59 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 7,235,517,000 VND, of which the total winning bid value is: 6,930,691,000 VND.
- The savings rate is: 4.21%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Tam Anh Bắc as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 7,235,517,000 VND, in which the total winning value is: 6,930,691,000 VND.
- The savings rate is: 4.21%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 16 investment and development projects.
- As the owner of 16 Contractor selection plan in which 13 Contractor selection plan is self-published, and 3 Contractor selection plan is posted by other units.
- Being the investor of 21 bidding packages in which 1 packages are self-invited, and 20 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Cho River Embankment Project (from Ba Bau bridge towards Bau Khanh culvert), Thuan An village of the investor Ủy ban nhân dân xã Tam Anh Bắc with 6 bidding package.
20/07/2024 18:02
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Cho River embankment (from Ba Bau bridge towards Bau Khanh culvert), Thuan An village.
20/07/2024 17:17
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the results of the bidding package Construction of the investor Ủy ban nhân dân xã Tam Anh Bắc.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TÍN DŨNG
14/05/2024 16:42
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Contractor selection plan for Mr. Luan's N293-1 Canal project to drainage ditch, Tra Ly village of the investor Ủy ban nhân dân xã Tam Anh Bắc with 4 bidding package.
14/05/2024 16:37
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Channel N293-1 Mr. Luan goes to the drainage ditch, Tra Ly village.
14/05/2024 16:16
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the results of the bidding package Construction of the investor Ủy ban nhân dân xã Tam Anh Bắc.
- Winning bidder: CÔNG TY CP TƯ VẤN - XÂY DỰNG THƯƠNG MẠI & DỊCH VỤ LỘC PHƯỚC THỊNH
11/03/2024 14:27
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Plan for selecting contractors for construction investment projects Project: Solidifying rural roads in Tam Anh Bac commune; National Highway 1A - road connecting Vietnam to Korea of the investor Ủy ban nhân dân xã Tam Anh Bắc with 7 bidding package.
22/12/2023 20:41
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Solidifying rural roads in Tam Anh Bac commune; National Highway 1A - road connecting Vietnam to Korea.
22/12/2023 20:20
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Plan for selecting contractors for construction investment projects Project: Solidifying rural roads in Tam Anh Bac commune; Ong Thuan route - N2 canal of the investor Ủy ban nhân dân xã Tam Anh Bắc with 7 bidding package.
22/12/2023 05:27
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Solidifying rural roads in Tam Anh Bac commune; Ong Thuan route - N2 canal.
21/12/2023 22:22
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Cho River Embankment Project (from Ba Bau bridge towards Bau Khanh culvert), Thuan An village with 6 bidding package .
20/07/2024 18:02
Ủy ban nhân dân xã Tam Anh Bắc announced the results of the bid package Construction .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TÍN DŨNG
14/05/2024 16:42
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Contractor selection plan for Mr. Luan's N293-1 Canal project to drainage ditch, Tra Ly village with 4 bidding package .
14/05/2024 16:37
Ủy ban nhân dân xã Tam Anh Bắc announced the results of the bid package Construction .
- Winning bidder: CÔNG TY CP TƯ VẤN - XÂY DỰNG THƯƠNG MẠI & DỊCH VỤ LỘC PHƯỚC THỊNH
11/03/2024 14:27
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Plan for selecting contractors for construction investment projects Project: Solidifying rural roads in Tam Anh Bac commune; National Highway 1A - road connecting Vietnam to Korea with 7 bidding package .
22/12/2023 20:41
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Plan for selecting contractors for construction investment projects Project: Solidifying rural roads in Tam Anh Bac commune; Ong Thuan route - N2 canal with 7 bidding package .
22/12/2023 05:27
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Planting 02 flower routes on 02 main roads in Duc Bo 1 village, Tam Anh Bac commune with 3 bidding package .
24/11/2023 15:37
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Installing a solar lighting system on the main road of Duc Bo 1 village with 1 bidding package .
17/11/2023 15:29
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Dap Da culvert, Tam Anh Bac commune with 7 bidding package .
17/11/2023 10:15
Ủy ban nhân dân xã Tam Anh Bắc publishes the plan Contractor selection plan Project: Solidifying rural roads in Tam Anh Bac commune; Route: Ong Vui district - Bordering Tray bridge with 7 bidding package .
31/10/2023 16:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Cho River Embankment Project (from Ba Bau bridge towards Bau Khanh culvert), Thuan An village of the investor Ủy ban nhân dân xã Tam Anh Bắc with 6 bidding package.
20/07/2024 18:02
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Cho River embankment (from Ba Bau bridge towards Bau Khanh culvert), Thuan An village.
20/07/2024 17:17
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the results of the bidding package Construction of the investor Ủy ban nhân dân xã Tam Anh Bắc.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TÍN DŨNG
14/05/2024 16:42
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Contractor selection plan for Mr. Luan's N293-1 Canal project to drainage ditch, Tra Ly village of the investor Ủy ban nhân dân xã Tam Anh Bắc with 4 bidding package.
14/05/2024 16:37
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Channel N293-1 Mr. Luan goes to the drainage ditch, Tra Ly village.
14/05/2024 16:16
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the results of the bidding package Construction of the investor Ủy ban nhân dân xã Tam Anh Bắc.
- Winning bidder: CÔNG TY CP TƯ VẤN - XÂY DỰNG THƯƠNG MẠI & DỊCH VỤ LỘC PHƯỚC THỊNH
11/03/2024 14:27
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Plan for selecting contractors for construction investment projects Project: Solidifying rural roads in Tam Anh Bac commune; National Highway 1A - road connecting Vietnam to Korea of the investor Ủy ban nhân dân xã Tam Anh Bắc with 7 bidding package.
22/12/2023 20:41
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Solidifying rural roads in Tam Anh Bac commune; National Highway 1A - road connecting Vietnam to Korea.
22/12/2023 20:20
The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted the request Plan for selecting contractors for construction investment projects Project: Solidifying rural roads in Tam Anh Bac commune; Ong Thuan route - N2 canal of the investor Ủy ban nhân dân xã Tam Anh Bắc with 7 bidding package.
22/12/2023 05:27
Ủy ban nhân dân xã Tam Anh Bắc Posted Development Investment Project Solidifying rural roads in Tam Anh Bac commune; Ong Thuan route - N2 canal.
21/12/2023 22:22
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Tam Anh Bắc has posted 15 of the contractor selection plan, which contains 73 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted 1 Tender Notice in the 1 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Tam Anh Bắc has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Tam Anh Bắc has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Tam Anh Bắc is the investor of 21 package, of which 1 package is self-invited, other units invite bid 20 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Tam Anh Bắc is the owner of 16 contractor selection plan. In which, they self-invite 13 of contractor selection plan, other units invite bids of 3 of contractor selection plan.
Summary: Investor Ủy ban nhân dân xã Tam Anh Bắc is an investor with 36 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Tam Anh Bắc is the investor of 16 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code