Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Thanh Mỹ as follows:
- Has relationships with 1 project owners.
- Has relationships with 15 contractor.
- Announced 13 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 14 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 50.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,315,915,037 VND, of which the total winning bid value is: 2,302,585,500 VND.
- The savings rate is: 0.58%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Thanh Mỹ as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 50.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,315,915,037 VND, in which the total winning value is: 2,302,585,500 VND.
- The savings rate is: 0.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Thanh Mỹ are as follows:
- Is the investor of 13 development investment projects.
- Is the investor of 20 contractor selection plans, of which 7 were self-published, and 13 were published by other entities.
- Is the investor of 15 Tender Notices, of which 3 were self-invited, and 12 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the results of the bidding package Supply and installation of light poles and installation of 400W solar lights of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
05/12/2024 13:36
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Low light on the country road along the south bank of Ba Phu canal of the investor Ủy ban nhân dân xã Thanh Mỹ with 1 bidding package.
05/12/2024 13:31
The Bid solicitor Ban Quản lý dự án và Phát triển quỹ đất huyện Tháp Mười has posted the results of the bidding package Package No. 04: Stone pavement and foundation of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG SÔNG CỬU LONG
05/11/2024 09:54
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the results of the bidding package No. 01: Repairing the road surface of the west bank of canal 307, the south shore of canal 1000, the north shore of canal 500 of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
14/10/2024 08:54
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Repairing the road surface of the west bank of canal 307, the south shore of canal 1000, and the north shore of canal 500 of the investor Ủy ban nhân dân xã Thanh Mỹ with 1 bidding package.
14/10/2024 08:49
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the results of the bidding package No. 01: Repairing bridge deck of Nhat CDC Nguyen Van Tre canal and open sewer 500-Ca Dam canal of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH THU HIỀN THÁP MƯỜI
11/10/2024 14:49
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Bridge surface cleaning for Nhat CDC Nguyen Van Tre canal and 500-channel open sewer in Ca Dam canal of the investor Ủy ban nhân dân xã Thanh Mỹ with 1 bidding package.
11/10/2024 14:44
Bid solicitor Ban Quản lý dự án và Phát triển quỹ đất huyện Tháp Mười has posted Tender Notice Tender package No 04: Stone pavement and foundation of the investor Ủy ban nhân dân xã Thanh Mỹ with the form Competitive Offer.
10/10/2024 15:35
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Hai Lai canal road of the investor Ủy ban nhân dân xã Thanh Mỹ with 4 bidding package.
03/10/2024 08:41
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Hai Lai canal road of the investor Ủy ban nhân dân xã Thanh Mỹ with 4 bidding package.
12/09/2024 10:26
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Thanh Mỹ announced the results of the bid package Supply and installation of light poles and installation of 400W solar lights .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
05/12/2024 13:36
Ủy ban nhân dân xã Thanh Mỹ publishes the plan Low light on the country road along the south bank of Ba Phu canal with 1 bidding package .
05/12/2024 13:31
Ủy ban nhân dân xã Thanh Mỹ announced the results of the bid package No. 01: Repairing the road surface of the west bank of canal 307, the south shore of canal 1000, the north shore of canal 500 .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
14/10/2024 08:54
Ủy ban nhân dân xã Thanh Mỹ publishes the plan Repairing the road surface of the west bank of canal 307, the south shore of canal 1000, and the north shore of canal 500 with 1 bidding package .
14/10/2024 08:49
Ủy ban nhân dân xã Thanh Mỹ announced the results of the bid package No. 01: Repairing bridge deck of Nhat CDC Nguyen Van Tre canal and open sewer 500-Ca Dam canal .
- Winning bidder: CÔNG TY TNHH THU HIỀN THÁP MƯỜI
11/10/2024 14:49
Ủy ban nhân dân xã Thanh Mỹ publishes the plan Bridge surface cleaning for Nhat CDC Nguyen Van Tre canal and 500-channel open sewer in Ca Dam canal with 1 bidding package .
11/10/2024 14:44
Ủy ban nhân dân xã Thanh Mỹ publishes the plan Hai Lai canal road with 4 bidding package .
03/10/2024 08:41
Ủy ban nhân dân xã Thanh Mỹ publishes the plan Hai Lai canal road with 4 bidding package .
12/09/2024 10:26
Ủy ban nhân dân xã Thanh Mỹ announced the results of the bid package No. 01: Repairing the yard and garage roof of the Military Steering Committee of Thanh My commune .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
30/08/2024 14:19
Ủy ban nhân dân xã Thanh Mỹ publishes the plan Repairing the yard and garage roof of the Military Steering Committee of Thanh My commune with 1 bidding package .
30/08/2024 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the results of the bidding package Supply and installation of light poles and installation of 400W solar lights of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
05/12/2024 13:36
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Low light on the country road along the south bank of Ba Phu canal of the investor Ủy ban nhân dân xã Thanh Mỹ with 1 bidding package.
05/12/2024 13:31
The Bid solicitor Ban Quản lý dự án và Phát triển quỹ đất huyện Tháp Mười has posted the results of the bidding package Package No. 04: Stone pavement and foundation of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG SÔNG CỬU LONG
05/11/2024 09:54
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the results of the bidding package No. 01: Repairing the road surface of the west bank of canal 307, the south shore of canal 1000, the north shore of canal 500 of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HỮU MINH
14/10/2024 08:54
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Repairing the road surface of the west bank of canal 307, the south shore of canal 1000, and the north shore of canal 500 of the investor Ủy ban nhân dân xã Thanh Mỹ with 1 bidding package.
14/10/2024 08:49
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the results of the bidding package No. 01: Repairing bridge deck of Nhat CDC Nguyen Van Tre canal and open sewer 500-Ca Dam canal of the investor Ủy ban nhân dân xã Thanh Mỹ.
- Winning bidder: CÔNG TY TNHH THU HIỀN THÁP MƯỜI
11/10/2024 14:49
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Bridge surface cleaning for Nhat CDC Nguyen Van Tre canal and 500-channel open sewer in Ca Dam canal of the investor Ủy ban nhân dân xã Thanh Mỹ with 1 bidding package.
11/10/2024 14:44
Bid solicitor Ban Quản lý dự án và Phát triển quỹ đất huyện Tháp Mười has posted Tender Notice Tender package No 04: Stone pavement and foundation of the investor Ủy ban nhân dân xã Thanh Mỹ with the form Competitive Offer.
10/10/2024 15:35
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Hai Lai canal road of the investor Ủy ban nhân dân xã Thanh Mỹ with 4 bidding package.
03/10/2024 08:41
The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted the request Hai Lai canal road of the investor Ủy ban nhân dân xã Thanh Mỹ with 4 bidding package.
12/09/2024 10:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Thanh Mỹ has posted 8 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted 4 Tender Notices in 4 bidding packages. Among these, 3 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Mỹ has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Thanh Mỹ has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects