Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Thanh Phong as follows:
- Has relationships with 1 project owners.
- Has relationships with 34 contractor.
- Announced 16 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 23 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 29 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 25 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.20 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 25,485,289,803 VND, of which the total winning bid value is: 25,457,600,068 VND.
- The savings rate is: 0.11%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Thanh Phong as follows:
- Has relationships with 34 contractor.
- The average number of contractors participating in each bidding package is: 1.20 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 25,485,289,803 VND, in which the total winning value is: 25,457,600,068 VND.
- The savings rate is: 0.11%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Thanh Phong are as follows:
- Is the investor of 16 development investment projects.
- Is the investor of 23 contractor selection plans, of which 14 were self-published, and 9 were published by other entities.
- Is the investor of 8 Tender Notices, of which 5 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Bidding package number 09:
Construction work
Project (inclusive
includes insurance costs
construction) .
- Winning bidder: Công ty CP XL tổng hợp Hòa Bình
20/12/2025 14:29
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG LONG LINH
23/11/2025 09:26
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Package No. 04: Competition
public construction work
submit .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ XÂY DỰNG LONG CHÂU
23/11/2025 09:19
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Tender package No 04: Construction work in the form Open bidding .
03/11/2025 14:34
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Consulting on determining specific land prices to calculate compensation when the State recovers land to implement the project: Ban Mong Reservoir phase 1, Nghe An province. Location: Thanh Phong commune, Thanh Hoa province. .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ ĐẦU TƯ BẤT ĐỘNG SẢN 36
02/11/2025 22:14
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Implementing tasks 16 and 18 of Project 6: Preserving and promoting good traditional cultural values of ethnic minorities associated with tourism development .
- Winning bidder: CÔNG TY CỔ PHẦN GIÁO DỤC VÀ PHÁT TRIỂN VĂN HÓA VIỆT
02/11/2025 22:12
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Bidding package No. 02: Evaluation of bidding documents and results of contractor selection for construction packages .
- Winning bidder: DUC LINH SEVISES AND CONSTRUCTION COMPANY LIMITED
02/11/2025 21:43
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Bidding package No. 01: Prepare bidding documents and evaluate bid documents for construction packages .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẠ TẦNG 668
02/11/2025 21:34
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Bidding package number 09:
Construction work
Project (inclusive
includes insurance costs
construction) in the form Open bidding .
02/11/2025 18:12
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Tender package No 04: Competition
public construction work
submit in the form Open bidding .
02/11/2025 17:57
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Tender package No 03: Construction work .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI ĐẦU TƯ VÀ XÂY DỰNG HD
31/07/2025 11:23
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Package 01: Supply and installation of equipment .
- Winning bidder:
29/05/2025 14:06
Ủy ban nhân dân xã Thanh Phong publishes the plan Procurement of equipment for cultural, arts and sports activities, building bookcases at cultural houses - Village sports area with 1 bidding package .
23/05/2025 17:24
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: THANH HOA CONSTRUCTIONAL INVERSTMENT AND CUNSULTANCY JOINT STOCK COMPANY
24/02/2025 15:29
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Package 04: Supervision of construction works .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TÂY THÀNH
24/02/2025 15:17
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Package No. 03: Construction works (including ensuring traffic safety for construction) .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VĨ NGUYÊN
19/02/2025 08:31
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Package 01: Land inventory, mapping current land use status in 2024 Thanh Phong commune, Nhu Xuan district, Thanh Hoa province .
- Winning bidder: Institute of economics and development
12/02/2025 14:08
Ủy ban nhân dân xã Thanh Phong publishes the plan Land inventory, mapping current land use status in 2024 Thanh Phong commune, Nhu Xuan district, Thanh Hoa province with 1 bidding package .
23/01/2025 10:17
Ủy ban nhân dân xã Thanh Phong announced the results of the bidding package Tender package No 03: Construction works (including ensuring traffic safety for construction) with 2 participating contractors .
16/01/2025 14:11
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Tender package No 03: Construction works (including ensuring traffic safety for construction) in the form Competitive Offer .
09/01/2025 10:57
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Bidding package number 09:
Construction work
Project (inclusive
includes insurance costs
construction) .
- Winning bidder: Công ty CP XL tổng hợp Hòa Bình
20/12/2025 14:29
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG LONG LINH
23/11/2025 09:26
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Package No. 04: Competition
public construction work
submit .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ VÀ XÂY DỰNG LONG CHÂU
23/11/2025 09:19
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Tender package No 04: Construction work in the form Open bidding .
03/11/2025 14:34
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Consulting on determining specific land prices to calculate compensation when the State recovers land to implement the project: Ban Mong Reservoir phase 1, Nghe An province. Location: Thanh Phong commune, Thanh Hoa province. .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ ĐẦU TƯ BẤT ĐỘNG SẢN 36
02/11/2025 22:14
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Implementing tasks 16 and 18 of Project 6: Preserving and promoting good traditional cultural values of ethnic minorities associated with tourism development .
- Winning bidder: CÔNG TY CỔ PHẦN GIÁO DỤC VÀ PHÁT TRIỂN VĂN HÓA VIỆT
02/11/2025 22:12
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Bidding package No. 02: Evaluation of bidding documents and results of contractor selection for construction packages .
- Winning bidder: DUC LINH SEVISES AND CONSTRUCTION COMPANY LIMITED
02/11/2025 21:43
Ủy ban nhân dân xã Thanh Phong announced the results of the bid package Bidding package No. 01: Prepare bidding documents and evaluate bid documents for construction packages .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẠ TẦNG 668
02/11/2025 21:34
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Bidding package number 09:
Construction work
Project (inclusive
includes insurance costs
construction) in the form Open bidding .
02/11/2025 18:12
Ủy ban nhân dân xã Thanh Phong publishes Tender Notice Tender package No 04: Competition
public construction work
submit in the form Open bidding .
02/11/2025 17:57
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Thanh Phong has posted 14 of the contractor selection plan, which contains 23 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Phong has posted 5 Tender Notices in 5 bidding packages. Among these, 5 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Phong has posted 29 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 29 package, canceled the bid 0 package (among the bidding packages above).
- There are 25 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Phong has a relationship with 34 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Thanh Phong has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Thanh Phong has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects