Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy Ban nhân dân xã Trà Đa as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 14 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,308,832,000 VND, of which the total winning bid value is: 9,304,200,000 VND.
- The savings rate is: 0.05%.
Data analysis results of DauThau.info software for bid solicitors Ủy Ban nhân dân xã Trà Đa as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,308,832,000 VND, in which the total winning value is: 9,304,200,000 VND.
- The savings rate is: 0.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy Ban nhân dân xã Trà Đa are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 9 contractor selection plans, of which 9 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công xây dựng - Ông Đặng Nhật Nguyên
03/04/2025 14:16
Investor Ủy Ban nhân dân xã Trà Đa has posted an investment and development project Install additional energy energy lighting systems at Village 2 and Village 3.
03/04/2025 14:14
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the request Install additional energy energy lighting systems at Village 2 and Village 3 of the investor Ủy Ban nhân dân xã Trà Đa with 1 bidding package.
03/04/2025 14:10
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the request Additional knitting sheet of Group 1, 2, 3 Village 1 and Muong Lower Lower Nguyen Xi Street, Village 3 of the investor Ủy Ban nhân dân xã Trà Đa with 1 bidding package.
21/03/2025 20:49
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the request Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area) of the investor Ủy Ban nhân dân xã Trà Đa with 1 bidding package.
21/03/2025 20:43
Investor Ủy Ban nhân dân xã Trà Đa has posted an investment and development project Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area).
21/03/2025 20:20
Investor Ủy Ban nhân dân xã Trà Đa has posted an investment and development project Additional knitting sheet of Group 1, 2, 3 Village 1 and Muong Lower Lower Nguyen Xi Street, Village 3.
21/03/2025 20:20
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Expand the road; Making water drainage system Van Cao (section from Ngo Quyen to the end of the road) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công - Nguyễn Tấn Được
21/03/2025 18:05
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Lower drainage ditch on Van Cao street (next to Mr. Tran Van Duoc's house) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công - Ông Nguyễn Tấn Được
21/03/2025 18:01
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Sewerage and drainage ditch Lower Van Cao street (next to Mrs. Hoa's house) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công - Ông Nguyễn Tấn Được
21/03/2025 17:58
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy Ban nhân dân xã Trà Đa announced the results of the bid package Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area) .
- Winning bidder: Nhóm thợ thi công xây dựng - Ông Đặng Nhật Nguyên
03/04/2025 14:16
Ủy Ban nhân dân xã Trà Đa publishes the plan Install additional energy energy lighting systems at Village 2 and Village 3 with 1 bidding package .
03/04/2025 14:10
Ủy Ban nhân dân xã Trà Đa publishes the plan Additional knitting sheet of Group 1, 2, 3 Village 1 and Muong Lower Lower Nguyen Xi Street, Village 3 with 1 bidding package .
21/03/2025 20:49
Ủy Ban nhân dân xã Trà Đa publishes the plan Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area) with 1 bidding package .
21/03/2025 20:43
Ủy Ban nhân dân xã Trà Đa announced the results of the bid package Expand the road; Making water drainage system Van Cao (section from Ngo Quyen to the end of the road) .
- Winning bidder: Nhóm thợ thi công - Nguyễn Tấn Được
21/03/2025 18:05
Ủy Ban nhân dân xã Trà Đa announced the results of the bid package Lower drainage ditch on Van Cao street (next to Mr. Tran Van Duoc's house) .
- Winning bidder: Nhóm thợ thi công - Ông Nguyễn Tấn Được
21/03/2025 18:01
Ủy Ban nhân dân xã Trà Đa announced the results of the bid package Sewerage and drainage ditch Lower Van Cao street (next to Mrs. Hoa's house) .
- Winning bidder: Nhóm thợ thi công - Ông Nguyễn Tấn Được
21/03/2025 17:58
Ủy Ban nhân dân xã Trà Đa publishes the plan Lower drainage ditch on Van Cao street (next to Mr. Tran Van Duoc's house) with 1 bidding package .
18/03/2025 07:04
Ủy Ban nhân dân xã Trà Đa publishes the plan Sewerage and drainage ditch Lower Van Cao street (next to Mrs. Hoa's house) with 1 bidding package .
18/03/2025 06:58
Ủy Ban nhân dân xã Trà Đa publishes the plan Expand the road; Making water drainage system Van Cao (section from Ngo Quyen to the end of the road) with 1 bidding package .
18/03/2025 06:50
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công xây dựng - Ông Đặng Nhật Nguyên
03/04/2025 14:16
Investor Ủy Ban nhân dân xã Trà Đa has posted an investment and development project Install additional energy energy lighting systems at Village 2 and Village 3.
03/04/2025 14:14
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the request Install additional energy energy lighting systems at Village 2 and Village 3 of the investor Ủy Ban nhân dân xã Trà Đa with 1 bidding package.
03/04/2025 14:10
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the request Additional knitting sheet of Group 1, 2, 3 Village 1 and Muong Lower Lower Nguyen Xi Street, Village 3 of the investor Ủy Ban nhân dân xã Trà Đa with 1 bidding package.
21/03/2025 20:49
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the request Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area) of the investor Ủy Ban nhân dân xã Trà Đa with 1 bidding package.
21/03/2025 20:43
Investor Ủy Ban nhân dân xã Trà Đa has posted an investment and development project Expand the road; Making water drainage system Dao Duy Anh (section from Tran Van Binh to the land of iron bridge planning area).
21/03/2025 20:20
Investor Ủy Ban nhân dân xã Trà Đa has posted an investment and development project Additional knitting sheet of Group 1, 2, 3 Village 1 and Muong Lower Lower Nguyen Xi Street, Village 3.
21/03/2025 20:20
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Expand the road; Making water drainage system Van Cao (section from Ngo Quyen to the end of the road) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công - Nguyễn Tấn Được
21/03/2025 18:05
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Lower drainage ditch on Van Cao street (next to Mr. Tran Van Duoc's house) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công - Ông Nguyễn Tấn Được
21/03/2025 18:01
The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted the results of the bidding package Sewerage and drainage ditch Lower Van Cao street (next to Mrs. Hoa's house) of the investor Ủy Ban nhân dân xã Trà Đa.
- Winning bidder: Nhóm thợ thi công - Ông Nguyễn Tấn Được
21/03/2025 17:58
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy Ban nhân dân xã Trà Đa has posted 10 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy Ban nhân dân xã Trà Đa has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy Ban nhân dân xã Trà Đa has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy Ban nhân dân xã Trà Đa has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy Ban nhân dân xã Trà Đa has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects