Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Trần Thương as follows:
- Has relationships with 1 project owners.
- Has relationships with 21 contractor.
- Announced 10 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 4 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 473,421,000 VND, of which the total winning bid value is: 473,421,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Trần Thương as follows:
- Has relationships with 21 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 473,421,000 VND, in which the total winning value is: 473,421,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân xã Trần Thương are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 17 contractor selection plans, of which 2 were self-published, and 15 were published by other entities.
- Is the investor of 7 Tender Notices, of which 0 were self-invited, and 7 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package No. 05: Construction (including ensuring traffic safety, lighting, moving power lines) .
- Winning bidder: DAN TRUONG CONSTRUCTION AND TRADING JOINT STOCK COMPANY
09/12/2025 20:48
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package No. 05: Construction works (including ensuring traffic safety) .
- Winning bidder: NAM HUNG CONSTRUCTION COMPANY LIMITED
01/12/2025 15:41
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package No. 05: Construction works (including ensuring traffic safety) .
- Winning bidder: NAM HUNG CONSTRUCTION COMPANY LIMITED
25/11/2025 15:23
Investor Uỷ ban nhân dân xã Trần Thương has posted an investment and development project Tasks and cost estimates for project implementation: Renovate and upgrade rural roads in Tran Thuong commune, route from Mr. Tuy's house in Dong Nhue village to Mr. Long's house in Dong Nhue village.
19/11/2025 17:17
Uỷ ban nhân dân xã Trần Thương publishes the plan LCNT tasks and plans to prepare for project investment: Renovating and upgrading rural roads in Tran Thuong commune, the route from Mr. Tuy's house in Dong Nhue village to Mr. Long's house in Dong Nhue village with 2 bidding package .
19/11/2025 16:52
Investor Uỷ ban nhân dân xã Trần Thương has posted an investment and development project Tasks and plans of LCNT to prepare for project investment: Renovating and upgrading the rural road in Tran Thuong commune, the route from Mr. Tuy's house in Dong Nhue village, to Mr. Long's house in Dong Nhue village.
19/11/2025 11:11
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package 06: Construction work .
- Winning bidder: HIEN TINH COMPANY LIMITED
19/11/2025 10:11
Uỷ ban nhân dân xã Trần Thương publishes Tender Notice Tender package No 05: Construction (including ensuring traffic safety, lighting, moving power lines) in the form Open bidding .
17/11/2025 16:45
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package No. 06: Construction construction .
- Winning bidder: 226 HA NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
14/11/2025 16:34
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package 03: Design and cost estimates .
- Winning bidder: CÔNG TY TNHH NAM VIỆT HÀ NAM
13/11/2025 17:16
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package No. 02: Verification of financial protection design and estimates .
- Winning bidder: TRUONG THINH CONSTRUCTION CONSULTANT AND DEVELOPMENT INVESTMENT COMPANY LIMITED
20/10/2025 16:49
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package 01: Topographic survey, preparation of economic and technical reports .
- Winning bidder: HTK CONSTRUCTION AND CONSULTING COMPANY LIMITED
20/10/2025 16:47
Uỷ ban nhân dân xã Trần Thương publishes the plan Renovating and upgrading Nhan Binh commune's rural road from Dong Nhue pagoda to Bo De bridge with 2 bidding package .
20/10/2025 16:43
Uỷ ban nhân dân xã Trần Thương publishes the plan Plan for selecting contractors for the work to be carried out at the stage of preparing the project's technical and economic feasibility report: Renovating and upgrading rural roads in Tran Hung Dao commune, route from DH.10 (Mr. Bao's house, Tho Hoanh Nguyen village) to Mr. Tuan's house, Tho Oc village with 2 bidding package .
20/10/2025 14:37
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package No. 05: Construction (including ensuring traffic safety, lighting, moving power lines) .
- Winning bidder: DAN TRUONG CONSTRUCTION AND TRADING JOINT STOCK COMPANY
09/12/2025 20:48
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package No. 05: Construction works (including ensuring traffic safety) .
- Winning bidder: NAM HUNG CONSTRUCTION COMPANY LIMITED
01/12/2025 15:41
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package No. 05: Construction works (including ensuring traffic safety) .
- Winning bidder: NAM HUNG CONSTRUCTION COMPANY LIMITED
25/11/2025 15:23
Investor Uỷ ban nhân dân xã Trần Thương has posted an investment and development project Tasks and cost estimates for project implementation: Renovate and upgrade rural roads in Tran Thuong commune, route from Mr. Tuy's house in Dong Nhue village to Mr. Long's house in Dong Nhue village.
19/11/2025 17:17
Uỷ ban nhân dân xã Trần Thương publishes the plan LCNT tasks and plans to prepare for project investment: Renovating and upgrading rural roads in Tran Thuong commune, the route from Mr. Tuy's house in Dong Nhue village to Mr. Long's house in Dong Nhue village with 2 bidding package .
19/11/2025 16:52
Investor Uỷ ban nhân dân xã Trần Thương has posted an investment and development project Tasks and plans of LCNT to prepare for project investment: Renovating and upgrading the rural road in Tran Thuong commune, the route from Mr. Tuy's house in Dong Nhue village, to Mr. Long's house in Dong Nhue village.
19/11/2025 11:11
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package 06: Construction work .
- Winning bidder: HIEN TINH COMPANY LIMITED
19/11/2025 10:11
Uỷ ban nhân dân xã Trần Thương publishes Tender Notice Tender package No 05: Construction (including ensuring traffic safety, lighting, moving power lines) in the form Open bidding .
17/11/2025 16:45
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Package No. 06: Construction construction .
- Winning bidder: 226 HA NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
14/11/2025 16:34
Uỷ ban nhân dân xã Trần Thương announced the results of the bid package Bidding package 03: Design and cost estimates .
- Winning bidder: CÔNG TY TNHH NAM VIỆT HÀ NAM
13/11/2025 17:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân xã Trần Thương has posted 2 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor Uỷ ban nhân dân xã Trần Thương has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân xã Trần Thương has a relationship with 21 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Trần Thương has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân xã Trần Thương has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects