Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Văn Hải as follows:
- Has relationships with 2 project owners.
- Has relationships with 10 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 25 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.33 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 50,838,901,000 VND, of which the total winning bid value is: 49,768,952,000 VND.
- The savings rate is: 2.10%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Văn Hải as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 2.33 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 50,838,901,000 VND, in which the total winning value is: 49,768,952,000 VND.
- The savings rate is: 2.10%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân xã Văn Hải are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 4 contractor selection plans, of which 4 were self-published, and 0 were published by other entities.
- Is the investor of 4 Tender Notices, of which 4 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Quality control + static compression of the investor Uỷ ban nhân dân xã Văn Hải.
14/12/2022 15:53
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Construction supervision of the investor Uỷ ban nhân dân xã Văn Hải.
09/09/2022 10:58
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Project management of the investor Uỷ ban nhân dân xã Văn Hải.
09/09/2022 10:34
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Construction and installation works of the investor Uỷ ban nhân dân xã Văn Hải.
07/08/2022 08:57
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Construction and installation works of the investor Uỷ ban nhân dân xã Văn Hải.
- Winning bidder: Công ty TNHH xây dựng Kim Tiến
29/07/2022 17:20
Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted Tender Notice Construction and installation works of the investor Uỷ ban nhân dân xã Văn Hải with the form National competitive bidding.
17/07/2022 16:17
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the request New construction of a school, a toilet, a multi-purpose house, Van Hai Primary School, Kim Son district, Ninh Binh province of the investor Uỷ ban nhân dân xã Văn Hải with 5 bidding package.
05/07/2022 10:24
Investor Uỷ ban nhân dân xã Văn Hải has posted an investment and development project New construction of a school, a toilet, a multi-purpose house, Van Hai Primary School, Kim Son district, Ninh Binh province.
05/07/2022 07:00
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Civil Works of the investor Uỷ ban nhân dân xã Văn Hải.
- Winning bidder: Công ty TNHH đầu tư xây dựng và thương mại Trần Đức
31/03/2022 14:48
Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted Tender Notice Civil Works of the investor Uỷ ban nhân dân xã Văn Hải with the form National competitive bidding.
12/03/2022 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã Văn Hải announced the results of the bid package Quality control + static compression .
- Winning bidder: Trung tâm Giám định chất lượng xây dựng Ninh Bình
14/12/2022 15:53
Uỷ ban nhân dân xã Văn Hải announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI DỊCH VỤ MINH ANH
09/09/2022 10:58
Uỷ ban nhân dân xã Văn Hải announced the results of the bid package Project management .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HẢI ĐĂNG
09/09/2022 10:34
Uỷ ban nhân dân xã Văn Hải announced the results of the bid package Construction and installation works .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KIM TÂN
07/08/2022 08:57
Uỷ ban nhân dân xã Văn Hải announced the results of the bid package Construction and installation works .
- Winning bidder: Công ty TNHH xây dựng Kim Tiến
29/07/2022 17:20
Uỷ ban nhân dân xã Văn Hải announced the results of the bidding package Construction and installation works with 2 participating contractors .
27/07/2022 17:00
Uỷ ban nhân dân xã Văn Hải publishes Tender Notice Construction and installation works in the form National competitive bidding .
17/07/2022 16:17
Uỷ ban nhân dân xã Văn Hải publishes the plan New construction of a school, a toilet, a multi-purpose house, Van Hai Primary School, Kim Son district, Ninh Binh province with 5 bidding package .
05/07/2022 10:24
Uỷ ban nhân dân xã Văn Hải announced the results of the bid package Civil Works .
- Winning bidder: Công ty TNHH đầu tư xây dựng và thương mại Trần Đức
31/03/2022 14:48
Uỷ ban nhân dân xã Văn Hải announced the results of the bidding package Civil Works with 3 participating contractors .
22/03/2022 13:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Quality control + static compression of the investor Uỷ ban nhân dân xã Văn Hải.
14/12/2022 15:53
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Construction supervision of the investor Uỷ ban nhân dân xã Văn Hải.
09/09/2022 10:58
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Project management of the investor Uỷ ban nhân dân xã Văn Hải.
09/09/2022 10:34
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Construction and installation works of the investor Uỷ ban nhân dân xã Văn Hải.
07/08/2022 08:57
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Construction and installation works of the investor Uỷ ban nhân dân xã Văn Hải.
- Winning bidder: Công ty TNHH xây dựng Kim Tiến
29/07/2022 17:20
Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted Tender Notice Construction and installation works of the investor Uỷ ban nhân dân xã Văn Hải with the form National competitive bidding.
17/07/2022 16:17
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the request New construction of a school, a toilet, a multi-purpose house, Van Hai Primary School, Kim Son district, Ninh Binh province of the investor Uỷ ban nhân dân xã Văn Hải with 5 bidding package.
05/07/2022 10:24
Investor Uỷ ban nhân dân xã Văn Hải has posted an investment and development project New construction of a school, a toilet, a multi-purpose house, Van Hai Primary School, Kim Son district, Ninh Binh province.
05/07/2022 07:00
The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted the results of the bidding package Civil Works of the investor Uỷ ban nhân dân xã Văn Hải.
- Winning bidder: Công ty TNHH đầu tư xây dựng và thương mại Trần Đức
31/03/2022 14:48
Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted Tender Notice Civil Works of the investor Uỷ ban nhân dân xã Văn Hải with the form National competitive bidding.
12/03/2022 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân xã Văn Hải has posted 6 of the contractor selection plan, which contains 25 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted 6 Tender Notices in 6 bidding packages. Among these, 4 Tender Notices were self-invited, and 2 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Văn Hải has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân xã Văn Hải has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Văn Hải has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân xã Văn Hải has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects