Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Văn phòng HĐND&UBND phường Kim Trà as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 17 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Văn phòng HĐND&UBND phường Kim Trà as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Văn phòng HĐND&UBND phường Kim Trà are as follows:
- Is the investor of 17 development investment projects.
- Is the investor of 40 contractor selection plans, of which 0 were self-published, and 40 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Procurement Package No. 01: Project Management for the Construction of: Upgrade of the Rot Dang - Bin Ban Canal, West Toan Cooperative. .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG BHOME
29/08/2026 10:56
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Bid No. 02: Survey and preparation of the technical economic report for the project: Upgrade of the Rut Dang - Bin Ban canal, Tay Toan Cooperative. .
- Winning bidder: NHAN TIN CONSTRUCTION COMPANY LIMITED
29/08/2026 10:55
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Procurement Package No. 03: Supervision of survey work and review of construction design drawings and cost estimates for the project: Upgrade of the Rot Dang - Bin Ban canal, West Toan Cooperative. .
- Winning bidder: ATZ CONSTRUCTION AND TRADING COMPANY LIMITED
29/08/2026 10:54
Văn phòng HĐND&UBND phường Kim Trà publishes the plan Upgrade of the Rong Dang - Bin Ban canal, West Toan Cooperative with 3 bidding package .
29/08/2026 10:46
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Bid No. 02: Survey and preparation of technical and economic report for the project: An Thuan Drainage Channel, Dong Toan Cooperative. .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG NTT
29/08/2026 10:34
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Procurement Package No. 01: Management of the "An Thuan Drainage Canal" Construction Project, Dong Toan Cooperative. .
29/08/2026 10:33
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Procurement Package No. 03: Supervision of survey work and review of construction design drawings and cost estimates for the An Thuan Drainage Channel project, Dong Toan Cooperative. .
- Winning bidder: ATZ CONSTRUCTION AND TRADING COMPANY LIMITED
29/08/2026 10:33
Văn phòng HĐND&UBND phường Kim Trà publishes the plan SAFE AND EFFICIENT WATER DRAINAGE SYSTEM, EASTERN REGIONAL COOPERATIVE LTD. with 3 bidding package .
29/08/2026 10:23
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package Procurement Package 03: Supervision of construction survey work and review of design drawings and construction estimates: construction of the Cồn Lê canal, Hương Chữ Agricultural Cooperative. .
- Winning bidder: ATZ CONSTRUCTION AND TRADING COMPANY LIMITED
29/08/2026 10:08
Văn phòng HĐND&UBND phường Kim Trà announced the results of the bid package CONTRACT NO. 02: Survey and preparation of a technical report for the construction of the Côn Lè canal and the Hương Chữ agricultural cooperative: .
- Winning bidder: TAN TIEN PHAT TECHNICAL ONE MEMBER COMPANY LIMITED
29/08/2026 10:07
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Văn phòng HĐND&UBND phường Kim Trà has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Văn phòng HĐND&UBND phường Kim Trà has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects