Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Văn phòng HĐND và UBND xã Al Bá as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 9 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 73,800,000 VND, of which the total winning bid value is: 73,800,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Văn phòng HĐND và UBND xã Al Bá as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 73,800,000 VND, in which the total winning value is: 73,800,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Văn phòng HĐND và UBND xã Al Bá are as follows:
- Is the investor of 9 development investment projects.
- Is the investor of 12 contractor selection plans, of which 1 were self-published, and 11 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: Công ty TNHH tư vấn và Xây dựng Hân phát Gia Lai
19/08/2026 16:11
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Consultancy and verification of BVTC design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚ HƯNG PHÁT GIA LAI
19/08/2026 16:08
Văn phòng HĐND và UBND xã Al Bá publishes the plan Plan for selecting contractors for works during the project preparation phase: Painting and repair of the fence surrounding the office building of the People's Committee - People's Council - People's Union of Al Ba village. with 2 bidding package .
19/08/2026 15:57
Investor Văn phòng HĐND và UBND xã Al Bá has posted an investment and development project Painting and repair of the protective fence surrounding the offices of the Party Committee, People's Council, and People's Committee of Al Ba village..
11/08/2026 08:08
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Shopping for LED screen equipment at the hall of Al Ba Commune Cultural House .
- Winning bidder: Công ty TNHH một thành viên quảng cáo Phong Phú
10/08/2026 16:30
Văn phòng HĐND và UBND xã Al Bá publishes the plan Budget and plan for selecting a contractor to perform the work: Purchase of LED display equipment for the Al Ba Cultural Center. with 1 bidding package .
10/08/2026 16:19
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Construction supervision consultancy .
- Winning bidder: EIGHT ONE NINE TWO DESIGN INVESMENT CONSTRUCTION CO.,LTD
07/08/2026 17:12
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KIẾN TRÚC XÂY DỰNG LONG MỘC GIA LAI
07/08/2026 17:07
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Construction .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG HOÀNG MINH GIA LAI
07/08/2026 17:04
Investor Văn phòng HĐND và UBND xã Al Bá has posted an investment and development project Shopping for LED screen equipment at the hall of Al Ba Commune Cultural House.
29/07/2026 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Computer shopping .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ TASLA VIỆT NAM
08/01/2025 08:23
Văn phòng HĐND và UBND xã Al Bá publishes the plan Computer shopping with 1 bidding package .
27/12/2024 07:58
The data sheet has been partially hidden, to see the full information please Login or Register
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: Công ty TNHH tư vấn và Xây dựng Hân phát Gia Lai
19/08/2026 16:11
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Consultancy and verification of BVTC design and cost estimate .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚ HƯNG PHÁT GIA LAI
19/08/2026 16:08
Văn phòng HĐND và UBND xã Al Bá publishes the plan Plan for selecting contractors for works during the project preparation phase: Painting and repair of the fence surrounding the office building of the People's Committee - People's Council - People's Union of Al Ba village. with 2 bidding package .
19/08/2026 15:57
Investor Văn phòng HĐND và UBND xã Al Bá has posted an investment and development project Painting and repair of the protective fence surrounding the offices of the Party Committee, People's Council, and People's Committee of Al Ba village..
11/08/2026 08:08
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Shopping for LED screen equipment at the hall of Al Ba Commune Cultural House .
- Winning bidder: Công ty TNHH một thành viên quảng cáo Phong Phú
10/08/2026 16:30
Văn phòng HĐND và UBND xã Al Bá publishes the plan Budget and plan for selecting a contractor to perform the work: Purchase of LED display equipment for the Al Ba Cultural Center. with 1 bidding package .
10/08/2026 16:19
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Construction supervision consultancy .
- Winning bidder: EIGHT ONE NINE TWO DESIGN INVESMENT CONSTRUCTION CO.,LTD
07/08/2026 17:12
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KIẾN TRÚC XÂY DỰNG LONG MỘC GIA LAI
07/08/2026 17:07
Văn phòng HĐND và UBND xã Al Bá announced the results of the bid package Construction .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG HOÀNG MINH GIA LAI
07/08/2026 17:04
Investor Văn phòng HĐND và UBND xã Al Bá has posted an investment and development project Shopping for LED screen equipment at the hall of Al Ba Commune Cultural House.
29/07/2026 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Văn phòng HĐND và UBND xã Al Bá has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
Summary: The Bid solicitor Văn phòng HĐND và UBND xã Al Bá has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Văn phòng HĐND và UBND xã Al Bá has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Văn phòng HĐND và UBND xã Al Bá has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects