Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Văn Phòng Tỉnh ủy Tây Ninh as follows:
- Has relationships with 1 project owners.
- Has relationships with 32 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 31 contractor selection plans with a total of 49 bidding packages, of which 30 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 27 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 25 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 18 packages that have not fully posted the contractor selection results. Of these 18 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 50.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,587,729,945 VND, of which the total winning bid value is: 5,403,021,212 VND.
- The savings rate is: 3.31%.
Data analysis results of DauThau.info software for bid solicitors Văn Phòng Tỉnh ủy Tây Ninh as follows:
- Has relationships with 32 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 50.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,587,729,945 VND, in which the total winning value is: 5,403,021,212 VND.
- The savings rate is: 3.31%.
This Bid solicitor is also an investor. The analysis results of data for the investor Văn Phòng Tỉnh ủy Tây Ninh are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 82 contractor selection plans, of which 30 were self-published, and 52 were published by other entities.
- Is the investor of 19 Tender Notices, of which 2 were self-invited, and 17 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Văn Phòng Tỉnh ủy Tây Ninh publishes Tender Notice Bidding package 08: Procurement of equipment and software for the category "Equipping and upgrading infrastructure, information technology equipment and software copyrights for digital transformation in Party agencies of Tay Ninh province" and the category "Equipping equipment and software to ensure information security for the network system of Party agencies in Tay Ninh province" in the form Open bidding .
28/08/2026 15:20
Văn Phòng Tỉnh ủy Tây Ninh publishes Tender Notice Package 09: Procurement of equipment and software for the item "Equipping and upgrading equipment and software for online conference system of Tay Ninh Provincial Party Committee to commune and ward party committees" in the form Open bidding .
27/08/2026 08:32
Văn Phòng Tỉnh ủy Tây Ninh publishes Tender Notice Bidding package 08: Procurement of equipment and software for the category "Equipping and upgrading infrastructure, information technology equipment and software copyrights for digital transformation in Party agencies of Tay Ninh province" and the category "Equipping equipment and software to ensure information security for the network system of Party agencies in Tay Ninh province" in the form Open bidding .
24/08/2026 13:43
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG ĐẠI HƯNG
19/08/2026 21:50
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Plan for selecting contractors for procurement estimates: Purchasing cars for general work with 2 bidding package .
15/08/2026 08:21
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Bidding package 06: Consulting on appraisal of bidding documents and appraisal of contractor selection results for bidding packages 08 and 09 under the project "Equipping information technology infrastructure to serve the digital transformation project in Party agencies of Tay Ninh province in the period 2025 - 2028" .
- Winning bidder: ITDJ TECHNOLOGY CONSULTING COMPANY LIMITED
15/08/2026 07:46
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Bidding package 05: Consulting on preparing bidding documents and evaluating bidding documents for packages No. 08 and 09 under the project "Equipping information technology infrastructure to serve the digital transformation project in Party agencies of Tay Ninh province in the period 2025 - 2028" .
- Winning bidder: VNGREENBLUE COMPANY LIMITED
14/08/2026 16:56
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Plan for selecting contractors for the investment phase (phase 2) of the project Equipping information technology infrastructure to serve the digital transformation project in Party agencies of Tay Ninh province in the period 2025 - 2028 with 5 bidding package .
04/08/2026 16:45
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Order meals for delegates attending the Information Ceremony of the Politburo and the Secretariat on personnel work .
- Winning bidder: Trung tâm Phục vụ hội nghị tỉnh Tây Ninh
31/07/2026 20:46
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Implementing the bidding package: Ordering meals for delegates attending the Information Ceremony of the Decision of the Politburo and the Secretariat on personnel work with 1 bidding package .
31/07/2026 20:34
The data sheet has been partially hidden, to see the full information please Login or Register
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Construction of large canteen partitions, renovation, decoration into a reception room with 1 bidding package .
30/06/2025 05:08
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Construction and repair office office general office of the Provincial Party Committee with 1 bidding package .
23/06/2025 21:50
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Construction and repair of guest guest rooms .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG ĐĂNG PHÚC
23/06/2025 21:14
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Construction and repair of guest guest rooms with 1 bidding package .
20/06/2025 20:49
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Equipped with wooden tables, wooden cabinets for the guest house conference .
- Winning bidder: CÔNG TY TNHH MTV LONG HỒ
04/06/2025 15:13
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Construction and dismantling Gate No. 02 -Phan Van Dat Street, repaired and painted fence behind the provincial Party Committee .
- Winning bidder: CÔNG TY TNHH HỢP LỰC HƯNG THỊNH
04/06/2025 14:53
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Order food .
- Winning bidder: Trung tâm Phục vụ hội nghị tỉnh Long An
04/06/2025 14:43
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Construction and dismantling port No. 02 - Phan Van Dat Street and repaired and painted fences behind the provincial Party Committee with 1 bidding package .
28/05/2025 09:43
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Equipped with wooden tables, wooden cabinets for the guest house conference with 1 bidding package .
28/05/2025 08:48
The data sheet has been partially hidden, to see the full information please Login or Register
Văn Phòng Tỉnh ủy Tây Ninh publishes Tender Notice Bidding package 08: Procurement of equipment and software for the category "Equipping and upgrading infrastructure, information technology equipment and software copyrights for digital transformation in Party agencies of Tay Ninh province" and the category "Equipping equipment and software to ensure information security for the network system of Party agencies in Tay Ninh province" in the form Open bidding .
28/08/2026 15:20
Văn Phòng Tỉnh ủy Tây Ninh publishes Tender Notice Package 09: Procurement of equipment and software for the item "Equipping and upgrading equipment and software for online conference system of Tay Ninh Provincial Party Committee to commune and ward party committees" in the form Open bidding .
27/08/2026 08:32
Văn Phòng Tỉnh ủy Tây Ninh publishes Tender Notice Bidding package 08: Procurement of equipment and software for the category "Equipping and upgrading infrastructure, information technology equipment and software copyrights for digital transformation in Party agencies of Tay Ninh province" and the category "Equipping equipment and software to ensure information security for the network system of Party agencies in Tay Ninh province" in the form Open bidding .
24/08/2026 13:43
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG ĐẠI HƯNG
19/08/2026 21:50
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Plan for selecting contractors for procurement estimates: Purchasing cars for general work with 2 bidding package .
15/08/2026 08:21
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Bidding package 06: Consulting on appraisal of bidding documents and appraisal of contractor selection results for bidding packages 08 and 09 under the project "Equipping information technology infrastructure to serve the digital transformation project in Party agencies of Tay Ninh province in the period 2025 - 2028" .
- Winning bidder: ITDJ TECHNOLOGY CONSULTING COMPANY LIMITED
15/08/2026 07:46
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Bidding package 05: Consulting on preparing bidding documents and evaluating bidding documents for packages No. 08 and 09 under the project "Equipping information technology infrastructure to serve the digital transformation project in Party agencies of Tay Ninh province in the period 2025 - 2028" .
- Winning bidder: VNGREENBLUE COMPANY LIMITED
14/08/2026 16:56
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Plan for selecting contractors for the investment phase (phase 2) of the project Equipping information technology infrastructure to serve the digital transformation project in Party agencies of Tay Ninh province in the period 2025 - 2028 with 5 bidding package .
04/08/2026 16:45
Văn Phòng Tỉnh ủy Tây Ninh announced the results of the bid package Order meals for delegates attending the Information Ceremony of the Politburo and the Secretariat on personnel work .
- Winning bidder: Trung tâm Phục vụ hội nghị tỉnh Tây Ninh
31/07/2026 20:46
Văn Phòng Tỉnh ủy Tây Ninh publishes the plan Implementing the bidding package: Ordering meals for delegates attending the Information Ceremony of the Decision of the Politburo and the Secretariat on personnel work with 1 bidding package .
31/07/2026 20:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Văn Phòng Tỉnh ủy Tây Ninh has posted 31 of the contractor selection plan, which contains 49 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Văn Phòng Tỉnh ủy Tây Ninh has posted 2 Tender Notices in 2 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Văn Phòng Tỉnh ủy Tây Ninh has posted 27 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 27 package, canceled the bid 0 package (among the bidding packages above).
- There are 25 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Văn Phòng Tỉnh ủy Tây Ninh has a relationship with 32 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Văn Phòng Tỉnh ủy Tây Ninh has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Văn Phòng Tỉnh ủy Tây Ninh has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects