Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Field Crop Research Institute as follows:
- Has relationships with 1 project owners.
- Has relationships with 61 contractor.
- Announced 5 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 229 contractor selection plans with a total of 348 bidding packages, of which 224 prequalification documents have not found the investment project.
- Has invited bids for 185 packages (with 202 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 203 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 41 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 155 packages that have not fully posted the contractor selection results. Of these 152 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.13 contractors.
- Breakdown by bidding field: Goods 98.02%, Construction 0%, Consultancy 0%, Non-consultancy 1.98%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 90,810,439,026 VND, of which the total winning bid value is: 90,324,475,811 VND.
- The savings rate is: 0.54%.
Data analysis results of DauThau.info software for bid solicitors Field Crop Research Institute as follows:
- Has relationships with 61 contractor.
- The average number of contractors participating in each bidding package is: 1.13 contractors.
- Proportion of bidding fields: Goods 98.02%, Construction 0%, Consulting 0%, Non-consulting 1.98%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 90,810,439,026 VND, in which the total winning value is: 90,324,475,811 VND.
- The savings rate is: 0.54%.
This Bid solicitor is also an investor. The analysis results of data for the investor Field Crop Research Institute are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 225 contractor selection plans, of which 214 were self-published, and 11 were published by other entities.
- Is the investor of 203 Tender Notices, of which 187 were self-invited, and 16 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 2 bidding packages, of which 2 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (1), Undefined (1)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 2 bidding packages with 3 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Field Crop Research Institute publishes the plan Plan for selecting contractors for the bidding package under the procurement estimate: "Building a model of "advanced farming techniques package" for the new rice variety Gia Loc 516 to achieve high productivity and quality in Ninh Binh province" with 1 bidding package .
31/12/2025 16:33
Field Crop Research Institute announced the results of the bid package Supply varieties, fertilizers and pesticides .
- Winning bidder: MAM VANG CO.,LTD
03/12/2025 10:33
Field Crop Research Institute announced the results of the bid package Package GT14: Construction insurance for additions and adjustments .
- Winning bidder: BAO LONG INSURANCE CORPORATION
02/12/2025 20:14
Field Crop Research Institute announced the results of the bid package Package GT13: Construction supervision of additions and adjustments .
- Winning bidder: Hai duong traffic design conulting joint stock company
02/12/2025 19:59
Field Crop Research Institute announced the results of the bid package Package GT12: Construction of additional regulation pond embankment .
- Winning bidder: VIET NAM AGRICULTURE INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
02/12/2025 19:54
Field Crop Research Institute publishes the plan Contractor selection plan (phase 4) Component project "Investment and upgrading of infrastructure and equipment to serve the development of pure rice varieties for the Northern provinces" under the Project "Investment and upgrading of infrastructure and equipment to serve the development of plant varieties" with 3 bidding package .
01/12/2025 17:16
Field Crop Research Institute announced the results of the bid package Package GT11 - Verification of construction drawing design, construction estimates for additions and adjustments .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG BẮC Á
28/11/2025 14:10
Field Crop Research Institute publishes the plan Contractor selection plan (phase 3) Component project "Investment and upgrading of infrastructure and equipment to serve the development of pure rice varieties for the Northern provinces" under the Project "Investment and upgrading of infrastructure and equipment to serve the development of plant varieties" with 1 bidding package .
28/11/2025 14:04
Field Crop Research Institute publishes Tender Notice Supply varieties, fertilizers and pesticides in the form Competitive Offer .
07/11/2025 17:27
Field Crop Research Institute announced the results of the bid package Repairing and renovating car garages and constructing corridors to ensure safety using HDPE pipes .
- Winning bidder: BF VIETNAM INVESTMENT AND CONSTRUCTION CONSULTING COMPANY LIMITED
31/10/2025 16:19
The data sheet has been partially hidden, to see the full information please Login or Register
Field Crop Research Institute announced the results of the bid package Package 02: Hiring consulting, training, evaluation and issuance of VietGAP Certificate for carrot, tomato, cabbage and leafy vegetables (broccoli) .
- Winning bidder: VIETCON CONFORMANCE CONSULTING JOINT STOCK COMPANY
18/07/2025 16:51
Field Crop Research Institute announced the results of the bid package Package 1: Buy potato seeds, fertilizer supplies and pesticides .
- Winning bidder: ANH DUNG PRODUCTION AND TRADING SERVICE INVESTMENT JOINT STOCK COMPANY, DUC MINH DEVELOPING TRADE OF PLANTS LIMITED COMPANY
16/07/2025 09:39
Field Crop Research Institute announced the results of the bidding package Package 1: Buy potato seeds, fertilizer supplies and pesticides with 1 participating contractors .
27/06/2025 14:21
Field Crop Research Institute publishes Tender Notice Package 1: Buy potato seeds, fertilizer supplies and pesticides in the form Competitive Offer .
20/06/2025 17:25
Field Crop Research Institute announced the results of the bidding package Tender package No 01: Supply seed lots, seedlings, fertilizers and plant protection drugs with 1 participating contractors .
20/06/2025 10:12
Field Crop Research Institute announced the results of the bidding package Package 1: Buy potato seeds, fertilizer supplies and pesticides with 1 participating contractors .
19/06/2025 14:11
Field Crop Research Institute publishes Tender Notice Package 1: Buy potato seeds, fertilizer supplies and pesticides in the form Competitive Offer .
12/06/2025 17:00
Field Crop Research Institute publishes Tender Notice Tender package No 01: Supply seed lots, seedlings, fertilizers and plant protection drugs in the form Competitive Offer .
12/06/2025 16:35
Field Crop Research Institute announced the results of the bid package Provide interior, traditional home decoration .
- Winning bidder: BF VIETNAM INVESTMENT AND CONSTRUCTION CONSULTING COMPANY LIMITED
11/06/2025 15:06
Field Crop Research Institute announced the results of the bid package Fixing net houses for research (02 pieces) .
- Winning bidder: MINORI COMMERCE AND CONSTRUCTION INVESTMENT COMPANY LIMITED
10/06/2025 16:36
The data sheet has been partially hidden, to see the full information please Login or Register
Field Crop Research Institute publishes the plan Plan for selecting contractors for the bidding package under the procurement estimate: "Building a model of "advanced farming techniques package" for the new rice variety Gia Loc 516 to achieve high productivity and quality in Ninh Binh province" with 1 bidding package .
31/12/2025 16:33
Field Crop Research Institute announced the results of the bid package Supply varieties, fertilizers and pesticides .
- Winning bidder: MAM VANG CO.,LTD
03/12/2025 10:33
Field Crop Research Institute announced the results of the bid package Package GT14: Construction insurance for additions and adjustments .
- Winning bidder: BAO LONG INSURANCE CORPORATION
02/12/2025 20:14
Field Crop Research Institute announced the results of the bid package Package GT13: Construction supervision of additions and adjustments .
- Winning bidder: Hai duong traffic design conulting joint stock company
02/12/2025 19:59
Field Crop Research Institute announced the results of the bid package Package GT12: Construction of additional regulation pond embankment .
- Winning bidder: VIET NAM AGRICULTURE INFRASTRUCTURE CONSTRUCTION JOINT STOCK COMPANY
02/12/2025 19:54
Field Crop Research Institute publishes the plan Contractor selection plan (phase 4) Component project "Investment and upgrading of infrastructure and equipment to serve the development of pure rice varieties for the Northern provinces" under the Project "Investment and upgrading of infrastructure and equipment to serve the development of plant varieties" with 3 bidding package .
01/12/2025 17:16
Field Crop Research Institute announced the results of the bid package Package GT11 - Verification of construction drawing design, construction estimates for additions and adjustments .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG BẮC Á
28/11/2025 14:10
Field Crop Research Institute publishes the plan Contractor selection plan (phase 3) Component project "Investment and upgrading of infrastructure and equipment to serve the development of pure rice varieties for the Northern provinces" under the Project "Investment and upgrading of infrastructure and equipment to serve the development of plant varieties" with 1 bidding package .
28/11/2025 14:04
Field Crop Research Institute publishes Tender Notice Supply varieties, fertilizers and pesticides in the form Competitive Offer .
07/11/2025 17:27
Field Crop Research Institute announced the results of the bid package Repairing and renovating car garages and constructing corridors to ensure safety using HDPE pipes .
- Winning bidder: BF VIETNAM INVESTMENT AND CONSTRUCTION CONSULTING COMPANY LIMITED
31/10/2025 16:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Field Crop Research Institute has posted 229 of the contractor selection plan, which contains 348 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Field Crop Research Institute has posted 202 Tender Notices in 185 bidding packages. Among these, 171 Tender Notices were self-invited, and 31 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Field Crop Research Institute has posted 203 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 203 package, canceled the bid 0 package (among the bidding packages above).
- There are 41 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Field Crop Research Institute has a relationship with 61 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Field Crop Research Institute has a relationship with 42 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Field Crop Research Institute has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects