Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VNPT Khanh Hoa as follows:
- Has relationships with 1 project owners.
- Has relationships with 28 contractor.
- Announced 152 investment development project, of which 8 projects have not yet announced the prequalification documents.
- Announced 109 contractor selection plans with a total of 224 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 22 packages (with 23 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 41 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 19 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 189 packages that have not fully posted the contractor selection results. Of these 189 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.23 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 24,586,936,788 VND, of which the total winning bid value is: 23,109,836,617 VND.
- The savings rate is: 6.01%.
Data analysis results of DauThau.info software for bid solicitors VNPT Khanh Hoa as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 2.23 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 24,586,936,788 VND, in which the total winning value is: 23,109,836,617 VND.
- The savings rate is: 6.01%.
This Bid solicitor is also an investor. The analysis results of data for the investor VNPT Khanh Hoa are as follows:
- Is the investor of 152 development investment projects.
- Is the investor of 133 contractor selection plans, of which 109 were self-published, and 24 were published by other entities.
- Is the investor of 26 Tender Notices, of which 23 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VNPT Khanh Hoa announced the results of the bid package Shopping for switches and accessories .
- Winning bidder: FIBER OPTIC CABLES ONE MEMBER LIMITED COMPANY
24/12/2025 15:21
VNPT Khanh Hoa publishes Tender Notice Shopping for switches and accessories in the form Competitive Offer .
10/12/2025 16:07
VNPT Khanh Hoa publishes the plan Shopping for switches and accessories with 2 bidding package .
09/12/2025 15:17
Investor VNPT Khanh Hoa has posted an investment and development project SW equipment and accessories for mobile and fixed broadband transmission - Khanh Hoa Telecommunications in 2025.
09/12/2025 15:15
Investor VNPT Khanh Hoa has posted an investment and development project Equipping generators for BTS stations by 2025 - Khanh Hoa Telecommunications.
04/12/2025 15:15
VNPT Khanh Hoa publishes the plan Shopping for fiber optic welding machine with 2 bidding package .
28/11/2025 15:49
Investor VNPT Khanh Hoa has posted an investment and development project Equipping servers to operate reporting and data storage systems for Khanh Hoa Infrastructure and Telecommunications Center in 2025.
28/11/2025 15:15
Investor VNPT Khanh Hoa has posted an investment and development project Equipping high-configuration fiber optic welding machines for Khanh Hoa Infrastructure and Telecommunications Center in 2025.
28/11/2025 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
VNPT Khanh Hoa publishes the plan Supplement ODN Dien Khanh with 3 bidding package .
27/06/2025 08:17
VNPT Khanh Hoa announced the results of the bid package OTB and Splitter shopping .
- Winning bidder: TRUNG KIÊN HÀ NAM COMPANY LIMITED
12/06/2025 11:10
VNPT Khanh Hoa announced the results of the bid package OTB and Splitter shopping .
- Winning bidder: TRUNG KIÊN HÀ NAM COMPANY LIMITED
12/06/2025 10:54
VNPT Khanh Hoa announced the results of the bid package OTB and Splitter shopping .
- Winning bidder: TRUNG KIÊN HÀ NAM COMPANY LIMITED
12/06/2025 10:31
The data sheet has been partially hidden, to see the full information please Login or Register
VNPT Khanh Hoa announced the results of the bid package Shopping for switches and accessories .
- Winning bidder: FIBER OPTIC CABLES ONE MEMBER LIMITED COMPANY
24/12/2025 15:21
VNPT Khanh Hoa publishes Tender Notice Shopping for switches and accessories in the form Competitive Offer .
10/12/2025 16:07
VNPT Khanh Hoa publishes the plan Shopping for switches and accessories with 2 bidding package .
09/12/2025 15:17
Investor VNPT Khanh Hoa has posted an investment and development project SW equipment and accessories for mobile and fixed broadband transmission - Khanh Hoa Telecommunications in 2025.
09/12/2025 15:15
Investor VNPT Khanh Hoa has posted an investment and development project Equipping generators for BTS stations by 2025 - Khanh Hoa Telecommunications.
04/12/2025 15:15
VNPT Khanh Hoa publishes the plan Shopping for fiber optic welding machine with 2 bidding package .
28/11/2025 15:49
Investor VNPT Khanh Hoa has posted an investment and development project Equipping servers to operate reporting and data storage systems for Khanh Hoa Infrastructure and Telecommunications Center in 2025.
28/11/2025 15:15
Investor VNPT Khanh Hoa has posted an investment and development project Equipping high-configuration fiber optic welding machines for Khanh Hoa Infrastructure and Telecommunications Center in 2025.
28/11/2025 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VNPT Khanh Hoa has posted 109 of the contractor selection plan, which contains 224 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VNPT Khanh Hoa has posted 23 Tender Notices in 22 bidding packages. Among these, 23 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VNPT Khanh Hoa has posted 41 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 41 package, canceled the bid 0 package (among the bidding packages above).
- There are 19 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VNPT Khanh Hoa has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VNPT Khanh Hoa has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects