Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Vietnam Expressway Corporation as follows:
- Has relationships with 3 project owners.
- Has relationships with 326 contractor.
- Announced 108 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 298 contractor selection plans with a total of 465 bidding packages, of which 137 prequalification documents have not found the investment project.
- Has invited bids for 198 packages (with 222 tender notices), and conducted prequalification for 4 packages.
- There are 26 bidding packages with content that needs clarification.
- Announced the results of 413 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 268 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 110 packages that have not fully posted the contractor selection results. Of these 96 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.03 contractors.
- Breakdown by bidding field: Goods 13.51%, Construction 51.80%, Consultancy 23.42%, Non-consultancy 11.26%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,423,672,492,807 VND, of which the total winning bid value is: 10,243,011,272,064 VND.
- The savings rate is: 23.69%.
Data analysis results of DauThau.info software for bid solicitors Vietnam Expressway Corporation as follows:
- Has relationships with 326 contractor.
- The average number of contractors participating in each bidding package is: 2.03 contractors.
- Proportion of bidding fields: Goods 13.51%, Construction 51.80%, Consulting 23.42%, Non-consulting 11.26%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,423,672,492,807 VND, in which the total winning value is: 10,243,011,272,064 VND.
- The savings rate is: 23.69%.
This Bid solicitor is also an investor. The analysis results of data for the investor Vietnam Expressway Corporation are as follows:
- Is the investor of 108 development investment projects.
- Is the investor of 370 contractor selection plans, of which 279 were self-published, and 91 were published by other entities.
- Is the investor of 261 Tender Notices, of which 198 were self-invited, and 63 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Vietnam Expressway Corporation announced the results of the bid package TVGS1-NBLC-2026: Consulting on construction supervision and repair of damaged works and traffic safety systems on the Noi Bai-Lao Cai expressway .
- Winning bidder: DUC MINH SERVICE AND CONSTRUCTION COMPANY LIMITED
25/08/2026 17:13
Vietnam Expressway Corporation announced the results of the bid package Traffic Safety - NBLC: Verify traffic safety before putting it into use .
- Winning bidder: CONSULTANCY COMPANY LIMITED OF UNIVERSITY OF CIVIL ENGINEERING
25/08/2026 09:43
Vietnam Expressway Corporation announced the results of the bid package Package SC2-CGNB-2026: Replacing the traffic safety system according to QCVN 41:2024/BGTVT standards and painting road markings on the entire Cau Gie - Ninh Binh expressway .
- Winning bidder: CÔNG TY TNHH THĂNG LONG L T
21/08/2026 17:11
Vietnam Expressway Corporation announced the results of the bid package TVTT.BVTC-NBLC-2025: Consulting on verification of BVTC design documents and estimates of major road surface repairs, additional replacement of traffic safety system section Km0+000-Km123+080 of Noi Bai-Lao Cai expressway .
- Winning bidder: TAN AN PHAT INVESTMENT CONSULTANCY AND CONSTRUCTION COMPANY LIMITED
20/08/2026 18:18
Vietnam Expressway Corporation publishes the plan Contractor selection plan for bidding packages: Survey consulting, preparation of pre-feasibility study reports; Verifying the pre-feasibility study report of the Noi Bai - Bac Ninh - Chi Linh Expressway Project with 2 bidding package .
19/08/2026 18:23
Vietnam Expressway Corporation publishes Tender Notice Bidding package MS2-2026: Data digitization, electronic storage phase 1 in the form Open bidding .
18/08/2026 17:51
Vietnam Expressway Corporation publishes Tender Notice DX-ĐNQN-Km36: Construction of bus stop Km36+000 on the Da Nang-Quang Ngai expressway in the form Open bidding .
18/08/2026 16:48
Vietnam Expressway Corporation announced the results of the bid package TVKT09-NBLC-2026: Consulting on auditing the final settlement of the project to complete 09 items of road surface damage repair and traffic safety system in 2024-2025 on the Noi Bai - Lao Cai expressway .
- Winning bidder: NHAN TAM VIET AUDITING COMPANY LIMITED
18/08/2026 10:12
Vietnam Expressway Corporation announced the results of the bid package BH1-NBLC-2026: Insurance for construction damage repair and traffic safety systems on the Noi Bai-Lao Cai expressway .
- Winning bidder: Vietinbank Insurance
18/08/2026 09:48
Vietnam Expressway Corporation announced the results of the bid package Traffic Safety Center-NGDQ: Consulting on traffic safety verification before putting Dung Quat intersection into operation .
- Winning bidder: Institute of Transport Science and Technology
14/08/2026 17:08
The data sheet has been partially hidden, to see the full information please Login or Register
Vietnam Expressway Corporation announced the results of the bid package Package TVGS2-CGNB-2026: Consulting on construction supervision of traffic safety system replacement according to QCVN 41:2024/BGTVT standards and painting road markings on the entire Cau Gie - Ninh Binh expressway .
- Winning bidder: Institute of Transport Science and Technology
15/05/2026 16:45
Vietnam Expressway Corporation publishes the plan Bidding packages under the construction investment project: Replace the traffic safety system in accordance with QCVN 41: 2024/BGTVT and paint the whole road of Cau Gie - Ninh Binh with 5 bidding package .
02/03/2026 12:24
Vietnam Expressway Corporation announced the results of the bid package Bidding Package TV .
- Winning bidder: NO.18 DESIGN CONSTRUCTION MANAGEMENT CONSULTANT JOINT STOCK COMPANY
02/12/2025 15:20
Vietnam Expressway Corporation announced the results of the bid package TVTT3-CGNB-2025: Consulting on verification of economic - technical reports for repair and replacement of fire protection system at Cau Gie - Ninh Binh expressway operation center .
- Winning bidder: THANG LONG CONSTRUCTION TECHNICAL CONSULTATION AND INVESTMENT JOINT STOCK COMPANY
07/11/2025 13:49
Vietnam Expressway Corporation announced the results of the bid package TVGS3 -HLD -2025: Consulting on supervision of construction and repair of electricity systems in Ho Chi Minh City - Long Thanh - Dau Giay .
- Winning bidder: HOANG HA THANG LONG JOINT STOCK COMPANY
26/09/2025 17:28
Vietnam Expressway Corporation announced the results of the bid package Bidding package TVKT1-NBLC-2024: Auditing consultancy for the settlement of the project to complete the repair work of the toll station of Noi Bai-Lao Cai Expressway .
- Winning bidder: NHAN TAM VIET AUDITING COMPANY LIMITED
18/09/2025 09:42
Vietnam Expressway Corporation announced the results of the bid package KTO & M-HLD-2025: Advice on auditing settlement of operation management, maintenance and charge for the period of 2019-2021, Ho Chi Minh City-Long Thanh-Dau Giay Street Project .
- Winning bidder: MOORE AISC AUDITING AND INFORMATICS SERVICES COMPANY LIMITED
16/09/2025 14:42
Vietnam Expressway Corporation announced the results of the bid package TVTT7-NBLC-2025: Consulting verification of economic and technical reports of works replacing and upgrading lighting equipment system for the management of Noi Bai-Lao Cai Expressway .
- Winning bidder: LIGHTING & MECHANICAL ELECTRICAL CONSTRUCTION INVESTMENT - ENGINEERING JOINT STOCK COMPANY
04/09/2025 16:20
Vietnam Expressway Corporation announced the results of the bid package TVGS3-DNQN-2025: Consulting on supervision of construction and construction works to repair the damaged positions of the roof, the drainage system of the Da Nang-Quang Ngai highway route .
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
25/08/2025 17:59
Vietnam Expressway Corporation announced the results of the bid package TVTT.QLTS: Consulting verification of economic and technical reports on building asset management systems and maintenance management and maintenance on high -speed routes managed by VEC .
- Winning bidder: Center of Technology - Digital Government
15/08/2025 10:30
The data sheet has been partially hidden, to see the full information please Login or Register
Vietnam Expressway Corporation announced the results of the bid package TVGS1-NBLC-2026: Consulting on construction supervision and repair of damaged works and traffic safety systems on the Noi Bai-Lao Cai expressway .
- Winning bidder: DUC MINH SERVICE AND CONSTRUCTION COMPANY LIMITED
25/08/2026 17:13
Vietnam Expressway Corporation announced the results of the bid package Traffic Safety - NBLC: Verify traffic safety before putting it into use .
- Winning bidder: CONSULTANCY COMPANY LIMITED OF UNIVERSITY OF CIVIL ENGINEERING
25/08/2026 09:43
Vietnam Expressway Corporation announced the results of the bid package Package SC2-CGNB-2026: Replacing the traffic safety system according to QCVN 41:2024/BGTVT standards and painting road markings on the entire Cau Gie - Ninh Binh expressway .
- Winning bidder: CÔNG TY TNHH THĂNG LONG L T
21/08/2026 17:11
Vietnam Expressway Corporation announced the results of the bid package TVTT.BVTC-NBLC-2025: Consulting on verification of BVTC design documents and estimates of major road surface repairs, additional replacement of traffic safety system section Km0+000-Km123+080 of Noi Bai-Lao Cai expressway .
- Winning bidder: TAN AN PHAT INVESTMENT CONSULTANCY AND CONSTRUCTION COMPANY LIMITED
20/08/2026 18:18
Vietnam Expressway Corporation publishes the plan Contractor selection plan for bidding packages: Survey consulting, preparation of pre-feasibility study reports; Verifying the pre-feasibility study report of the Noi Bai - Bac Ninh - Chi Linh Expressway Project with 2 bidding package .
19/08/2026 18:23
Vietnam Expressway Corporation publishes Tender Notice Bidding package MS2-2026: Data digitization, electronic storage phase 1 in the form Open bidding .
18/08/2026 17:51
Vietnam Expressway Corporation publishes Tender Notice DX-ĐNQN-Km36: Construction of bus stop Km36+000 on the Da Nang-Quang Ngai expressway in the form Open bidding .
18/08/2026 16:48
Vietnam Expressway Corporation announced the results of the bid package TVKT09-NBLC-2026: Consulting on auditing the final settlement of the project to complete 09 items of road surface damage repair and traffic safety system in 2024-2025 on the Noi Bai - Lao Cai expressway .
- Winning bidder: NHAN TAM VIET AUDITING COMPANY LIMITED
18/08/2026 10:12
Vietnam Expressway Corporation announced the results of the bid package BH1-NBLC-2026: Insurance for construction damage repair and traffic safety systems on the Noi Bai-Lao Cai expressway .
- Winning bidder: Vietinbank Insurance
18/08/2026 09:48
Vietnam Expressway Corporation announced the results of the bid package Traffic Safety Center-NGDQ: Consulting on traffic safety verification before putting Dung Quat intersection into operation .
- Winning bidder: Institute of Transport Science and Technology
14/08/2026 17:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Vietnam Expressway Corporation has posted 298 of the contractor selection plan, which contains 465 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Expressway Corporation posted 4 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Vietnam Expressway Corporation has posted 222 Tender Notices in 198 bidding packages. Among these, 175 Tender Notices were self-invited, and 47 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Expressway Corporation has posted 413 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 413 package, canceled the bid 1 package (among the bidding packages above).
- There are 268 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Vietnam Expressway Corporation has a relationship with 326 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Expressway Corporation has a relationship with 47 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Vietnam Expressway Corporation has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects