Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VINACOMIN MINING PROJECT MANAGEMENT UNIT as follows:
- Has relationships with 1 project owners.
- Has relationships with 23 contractor.
- Announced 8 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 23 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 8 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 19 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 13 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 12.50%, Construction 37.50%, Consultancy 50.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 40,647,142,298 VND, of which the total winning bid value is: 35,682,730,373 VND.
- The savings rate is: 12.21%.
Data analysis results of DauThau.info software for bid solicitors VINACOMIN MINING PROJECT MANAGEMENT UNIT as follows:
- Has relationships with 23 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 12.50%, Construction 37.50%, Consulting 50.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 40,647,142,298 VND, in which the total winning value is: 35,682,730,373 VND.
- The savings rate is: 12.21%.
This Bid solicitor is also an investor. The analysis results of data for the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT are as follows:
- Is the investor of 8 development investment projects.
- Is the investor of 8 contractor selection plans, of which 8 were self-published, and 0 were published by other entities.
- Is the investor of 6 Tender Notices, of which 6 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 21 bidding packages, of which 21 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 78.89% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.57% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ninh (13), Thái Nguyên (1), Hà Nội (1), Undefined (6)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (13), Thái Nguyên (1), Hà Nội (1), Undefined (6)
- Has relationships with 9 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 63 bidding packages with 14 roles.
- Name of construction organization: BAN QUẢN LÝ DỰ ÁN CHUYÊN NGÀNH MỎ THAN - TKV
- Code of capacity certificate of construction activities: 00005172
- Issuer:
- Fields:
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật (trừ công trình xử lý CTR)
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp (khai thác mỏ và chế biến khoáng sản)
⚬ Quản lý dự án đầu tư xây dựng: Nông nghiệp và phát triển nông thôn
⚬ Quản lý dự án đầu tư xây dựng: Giao thông (Đường bộ, đường sắt)
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (khai thác mỏ và chế biến khoáng sản)
⚬ Giám sát thi công xây dựng công trình: Giao thông
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Thủy lợi
- Name of construction organization: BAN QUẢN LÝ DỰ ÁN CHUYÊN NGÀNH MỎ THAN - TKV
- Code of capacity certificate of construction activities: 00032915
- Issuer:
- Fields:
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật Cấp, thoát nước
⚬ Giám sát thi công xây dựng công trình: NN&PTNT
⚬ Giám sát thi công xây dựng công trình: Lắp đặt thiết bị công trình
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Auditing the cost of implementing the project of construction construction projects (2x600MW) of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
23/06/2025 14:12
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package No. 4: Independent Audit of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
23/06/2025 14:05
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package No. 5: Audit of works of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
17/06/2025 12:04
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the request LCNT Plan for the audit of expenses related to the implementation of Quynh Lap I (2x600MW) project of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT with 1 bidding package.
09/04/2025 13:41
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the request Contractor selection plan Documents for urgent repair and periodic preservation of the project: Historical relic site of Vietnam's first coal mining site GĐI of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT with 4 bidding package.
09/04/2025 13:35
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the request Bidding contractor Package No. 5: Designing construction drawings - Estimated projects of the project: Preservation and renovation of historical site of Vietnam's first coal mining location in Yen Lang Mountain, Yen Tho Ward, Dong Trieu City (Phase II) of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT with 1 bidding package.
09/04/2025 13:35
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Auditing the cost of implementing the construction of the thermal power plant (2 x 600mw) .
13/03/2025 15:32
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package 4: Supervision of construction and equipment installation of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
06/01/2025 09:24
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package 3: Construction and equipment installation of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
03/01/2025 14:18
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package 3: Supervision of equipment installation of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
02/01/2025 11:19
The data sheet has been partially hidden, to see the full information please Login or Register
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Package No. 5: Make construction drawing design - Estimated .
- Winning bidder: Consulting and Technology Transfer Office for Construction
19/08/2025 09:23
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Package 2: Consulting on building human resource management software, salary .
- Winning bidder: TINH VAN ENTERPRISE APPLICATIONS CONSULTING JOINT STOCK COMPANY
29/07/2025 17:15
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Auditing the cost of implementing the project of construction construction projects (2x600MW) .
- Winning bidder: AAGROUP AUDITING CONSUTLTING COMPANY LIMITED
23/06/2025 14:12
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Package No. 4: Independent Audit .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
23/06/2025 14:05
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Package No. 5: Audit of works .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
17/06/2025 12:04
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bidding package Package 5: Design construction drawings - Estimation with 1 participating contractors .
19/05/2025 10:03
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bidding package Package 2: Consulting on building human resource management software, salary with 4 participating contractors .
05/05/2025 14:17
VINACOMIN MINING PROJECT MANAGEMENT UNIT publishes Tender Notice Package 5: Design construction drawings - Estimation in the form Open bidding .
29/04/2025 11:41
VINACOMIN MINING PROJECT MANAGEMENT UNIT publishes Tender Notice Package 2: Consulting on building human resource management software, salary in the form Open bidding .
10/04/2025 15:47
VINACOMIN MINING PROJECT MANAGEMENT UNIT publishes the plan LCNT Plan for the audit of expenses related to the implementation of Quynh Lap I (2x600MW) project with 1 bidding package .
09/04/2025 13:41
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Auditing the cost of implementing the project of construction construction projects (2x600MW) of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
23/06/2025 14:12
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package No. 4: Independent Audit of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
23/06/2025 14:05
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package No. 5: Audit of works of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
17/06/2025 12:04
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the request LCNT Plan for the audit of expenses related to the implementation of Quynh Lap I (2x600MW) project of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT with 1 bidding package.
09/04/2025 13:41
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the request Contractor selection plan Documents for urgent repair and periodic preservation of the project: Historical relic site of Vietnam's first coal mining site GĐI of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT with 4 bidding package.
09/04/2025 13:35
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the request Bidding contractor Package No. 5: Designing construction drawings - Estimated projects of the project: Preservation and renovation of historical site of Vietnam's first coal mining location in Yen Lang Mountain, Yen Tho Ward, Dong Trieu City (Phase II) of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT with 1 bidding package.
09/04/2025 13:35
VINACOMIN MINING PROJECT MANAGEMENT UNIT announced the results of the bid package Auditing the cost of implementing the construction of the thermal power plant (2 x 600mw) .
13/03/2025 15:32
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package 4: Supervision of construction and equipment installation of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
06/01/2025 09:24
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package 3: Construction and equipment installation of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
03/01/2025 14:18
The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted the results of the bidding package Package 3: Supervision of equipment installation of the investor VINACOMIN MINING PROJECT MANAGEMENT UNIT.
02/01/2025 11:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted 11 of the contractor selection plan, which contains 23 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted 8 Tender Notices in 7 bidding packages. Among these, 6 Tender Notices were self-invited, and 2 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has posted 19 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 19 package, canceled the bid 0 package (among the bidding packages above).
- There are 13 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has a relationship with 23 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VINACOMIN MINING PROJECT MANAGEMENT UNIT has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VINACOMIN MINING PROJECT MANAGEMENT UNIT has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects